Filter interviews by
I applied via Recruitment Consultant and was interviewed in Mar 2018. There were 7 interview rounds.
An LPG plant is a facility that processes and stores liquefied petroleum gas. It requires various electrical and electronic equipment for its operations.
LPG plant is a facility that processes and stores liquefied petroleum gas
Electrical equipment in an LPG plant includes transformers, switchgear, motors, and control panels
Electronic equipment in an LPG plant includes sensors, transmitters, and PLCs
Examples of electrica...
NO&NC contactor stands for Normally Open and Normally Closed contactor used in electrical circuits.
NO&NC contactor is a type of electrical switch used to control power circuits.
Normally Open (NO) contactor allows current to flow when the coil is energized.
Normally Closed (NC) contactor interrupts current flow when the coil is energized.
NO&NC contactors are commonly used in motor control circuits.
They are es...
The question is about standards used in CNG, basics of natural gas, HCV MCV operation, and gas reconciliation procedure.
CNG standards include ISO 15403, SAE J1616, and ANSI NGV2.
Natural gas is composed mainly of methane and is extracted from underground reservoirs.
HCV and MCV refer to high and medium calorific value, respectively, and are used to measure the energy content of natural gas.
Gas reconciliation procedure in...
I have a strong technical background with expertise in software development, system architecture, and project management.
Extensive experience in software development using languages such as Java, Python, and C++
Proficient in system architecture design and implementation
Skilled in project management, including leading cross-functional teams and delivering projects on time and within budget
I applied via Naukri.com and was interviewed in Jul 2021. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Jan 2024. There was 1 interview round.
I was interviewed in Jul 2024.
An electrical panel is a metal box that contains electrical circuit breakers or fuses to control the flow of electricity in a building.
Controls the distribution of electricity throughout a building
Contains circuit breakers or fuses to protect circuits from overloads
Typically located in a utility room or basement
May have labels indicating which circuits are connected to each breaker
Regular inspection, cleaning, lubrication, and testing are key practices for electrical motor maintenance.
Regularly inspect motor for signs of wear or damage
Keep motor clean and free of dust and debris
Lubricate moving parts as recommended by manufacturer
Test motor performance regularly to detect any issues early
Follow proper storage and handling procedures when not in use
I applied via Company Website and was interviewed in Jan 2024. There were 3 interview rounds.
My GD topic was renewable energy.
I am a Senior Engineer with 10+ years of experience in designing and implementing complex systems.
10+ years of experience in engineering
Specialize in designing and implementing complex systems
Strong problem-solving skills
Experience with various programming languages such as Java, Python, and C++
Seeking new challenges and growth opportunities at GAIL.
Desire for new challenges and opportunities for growth
Interested in working in a different industry or with different technologies
Attracted to GAIL's reputation and projects
Seeking a more collaborative and innovative work environment
My parents are both retired now, but my father used to work as a civil engineer and my mother was a teacher.
Father worked as a civil engineer
Mother was a teacher
Both are retired now
Yes, I have visited Delhi earlier for a business trip.
Visited Delhi for a business trip
Explored historical sites like Red Fort and Qutub Minar
Enjoyed local cuisine like butter chicken and chaat
I am staying at a hotel in Sector 18, Noida for the interview process.
Staying at a hotel in Sector 18, Noida
Close to the interview location
Comfortable accommodation for the duration of the process
Decoking process involves removing coke deposits from cracking furnace and naphtha circuit to maintain efficiency.
Decoking process involves burning off coke deposits using controlled combustion.
Mechanical decoking involves using high-pressure water jets to remove coke deposits.
Chemical decoking involves using solvents or acids to dissolve coke deposits.
Regular decoking is essential to prevent blockages and maintain fur
Refrigeration cycles are thermodynamic processes used in refrigerators and air conditioners to transfer heat from a low temperature reservoir to a high temperature reservoir.
Refrigeration cycles typically involve four main components: compressor, condenser, expansion valve, and evaporator.
The refrigerant undergoes a cycle of compression, condensation, expansion, and evaporation to absorb heat from the space being coole...
Safety procedures before starting a hot job include obtaining a hot work permit, conducting a hazard assessment, ensuring proper ventilation, and having fire extinguishing equipment nearby.
Obtain a hot work permit before starting any hot job
Conduct a hazard assessment to identify potential risks
Ensure proper ventilation in the work area to prevent buildup of flammable gases
Have fire extinguishing equipment nearby and r
Territory Manager
86
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Accountant
58
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Marketing Executive
51
salaries
| ₹0 L/yr - ₹0 L/yr |
Business Development Manager
38
salaries
| ₹0 L/yr - ₹0 L/yr |
Gujarat Gas
Indraprastha Gas
Adani Gas
Petronet LNG