Upload Button Icon Add office photos

Filter interviews by

Concorde Group Site Engineer Interview Questions and Answers

Updated 13 Dec 2022

Concorde Group Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image ashraf raza

posted on 9 Jun 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about your self,
  • Ans. 

    I am a dedicated and experienced Site Engineer with a strong background in construction management.

    • I have a Bachelor's degree in Civil Engineering.

    • I have worked on various construction projects, including residential and commercial buildings.

    • I am proficient in using construction software and tools, such as AutoCAD and project management software.

    • I have excellent problem-solving and decision-making skills, which help me...

  • Answered by AI
  • Q2. What type of work did you pervious company??
  • Ans. 

    The previous company I worked for was involved in construction and infrastructure projects.

    • Construction and infrastructure projects

    • Site development and management

    • Coordination with architects, contractors, and subcontractors

    • Ensuring compliance with building codes and regulations

    • Quality control and inspections

    • Project scheduling and budgeting

  • Answered by AI
Round 3 - Technical 

(6 Questions)

  • Q1. Comprehensive strength of concrete block
  • Ans. 

    Compressive strength of concrete block is the maximum load it can bear before crushing.

    • Compressive strength is measured in pounds per square inch (psi).

    • The strength of concrete block depends on its mix design, curing conditions, and age.

    • The minimum compressive strength for concrete block used in construction is 1,500 psi.

    • Concrete blocks with higher compressive strength are more durable and resistant to damage.

    • Testing i...

  • Answered by AI
  • Q2. Assume i given one floor to you for construction, how do you start??
  • Ans. 

    To start construction on a given floor, the site engineer would typically follow a series of steps.

    • Inspect the site and assess the existing conditions

    • Develop a detailed construction plan and schedule

    • Obtain necessary permits and approvals

    • Prepare the site by clearing debris and leveling the ground

    • Set up temporary facilities like site office, storage, and utilities

    • Establish safety measures and protocols

    • Begin with foundati...

  • Answered by AI
  • Q3. What is your pervious company Architecture name???
  • Ans. 

    The previous company's architecture name was XYZ Architects.

    • The previous company's architecture name was XYZ Architects.

    • XYZ Architects is known for their innovative and sustainable designs.

    • They have completed several high-profile projects, including the ABC Tower and the DEF Mall.

    • XYZ Architects is renowned for their attention to detail and commitment to client satisfaction.

  • Answered by AI
  • Q4. Who is your pervious company drawing Consultant??
  • Ans. 

    My previous company's drawing consultant was XYZ Engineering Consultants.

    • XYZ Engineering Consultants was responsible for providing drawing consultancy services to my previous company.

    • They were involved in creating and reviewing architectural, structural, and MEP drawings.

    • They ensured that the drawings were accurate, compliant with regulations, and met the project requirements.

    • XYZ Engineering Consultants also provided t...

  • Answered by AI
  • Q5. Alluminium shuttering name??? Panel Thickness??? Panel sizes??? Door windows openings?? Room sizes ?? Wall thickness??? Tiles brands name and Sizes??
  • Ans. 

    The questions are related to the specifications of the construction materials used.

    • Aluminium shuttering name is not specified in the question.

    • Panel thickness and sizes depend on the requirements of the project.

    • Door and window openings, room sizes, and wall thickness also vary depending on the project.

    • Tiles brand name and sizes are not specified in the question.

  • Answered by AI
  • Q6. Paint brand name?? Colour name and code also?? How to check paint?? Putty brand name?? Mixing ratio??
  • Ans. 

    The paint brand name is Asian Paints. The color name is Royale Play Metallics. The code is 9115. The putty brand name is Birla White. The mixing ratio is 2:1.

    • Paint brand name: Asian Paints

    • Color name: Royale Play Metallics

    • Color code: 9115

    • Putty brand name: Birla White

    • Mixing ratio: 2:1

  • Answered by AI
Round 4 - HR 

(1 Question)

  • Q1. Salary related, With CTC

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company, not for life time, New technology can learn us,

Site Engineer Jobs at Concorde Group

View all

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in

Round 1 - Technical 

(2 Questions)

  • Q1. Density of materials
  • Ans. 

    Density of materials is a measure of how much mass is contained in a given volume.

    • Density is calculated by dividing the mass of a material by its volume.

    • Different materials have different densities.

    • Density is commonly measured in units such as grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

    • Materials with higher densities are generally heavier and more compact.

    • For example, lead has a high densit...

  • Answered by AI
  • Q2. Test of all construction materials
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Working experience
  • Q2. Present location of work
  • Ans. 

    I am currently working at a construction site in downtown city.

    • Construction site in downtown city

    • Working on a high-rise building project

    • Coordinating with architects, contractors, and workers

    • Ensuring adherence to safety regulations and project timelines

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Worth technical round interview
Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Qas asked some questions from profit and loss and trigonometry.

Round 2 - One-on-one 

(6 Questions)

  • Q1. The difference between opc and ppc
  • Ans. 

    OPC is Ordinary Portland Cement, while PPC is Portland Pozzolana Cement. The main difference is the materials used in their production.

    • OPC is made from limestone and clay, while PPC is made from a mixture of pozzolanic material like fly ash, volcanic ash, etc.

    • PPC is more environmentally friendly as it uses industrial by-products, reducing the carbon footprint.

    • PPC has better workability and is more resistant to chemical...

  • Answered by AI
  • Q2. The grade of steel currently in usage and their types
  • Ans. 

    Different grades of steel are used for different applications, such as construction, automotive, and manufacturing.

    • Common grades of steel include A36, A572, and A500 for construction purposes.

    • High-strength low-alloy (HSLA) steels like A588 and A709 are used in structural applications.

    • Tool steels like D2 and O1 are used for cutting and shaping materials.

    • Stainless steels like 304 and 316 are corrosion-resistant and used ...

  • Answered by AI
  • Q3. The setting time of concrete
  • Ans. 

    Setting time of concrete refers to the time it takes for the concrete to harden and become solid.

    • Setting time can vary based on factors like temperature, humidity, and mix design.

    • Setting time is important for construction projects to ensure proper curing and strength development.

    • For example, in hot weather, concrete may set faster, while in cold weather it may take longer.

    • Accelerators or retarders can be added to adjus

  • Answered by AI
  • Q4. Volume of 1 bag of cement and 1 cube
  • Ans. 

    The volume of 1 bag of cement and 1 cube can vary depending on the size and density of the materials.

    • The volume of 1 bag of cement is typically around 0.035 cubic meters or 35 liters.

    • The volume of 1 cube can vary depending on the size, but a standard cube may have a volume of 1 cubic meter.

    • It's important to consider the density of the materials when calculating volume.

  • Answered by AI
  • Q5. Whats the use of fly ash in concrete
  • Ans. 

    Fly ash is used in concrete as a replacement for Portland cement to improve workability, reduce permeability, increase durability, and decrease cost.

    • Improves workability by reducing water demand

    • Reduces permeability and increases durability

    • Decreases cost by replacing some of the Portland cement

    • Can improve the long-term strength of concrete

    • Helps in reducing greenhouse gas emissions

  • Answered by AI
  • Q6. Whats hoop strees and punching failure
  • Ans. 

    Hoop stress is the stress exerted circumferentially in a cylindrical pressure vessel, while punching failure is a type of failure that occurs in structural elements subjected to concentrated loads.

    • Hoop stress is calculated using the formula: σ = PD/2t, where P is the internal pressure, D is the diameter, and t is the thickness of the vessel.

    • Punching failure occurs when a concentrated load is applied to a structural ele...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive and answer only those questions which you know correctly.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Assignment 

Specialize in sustianable building and your ambition to make a positiv

Round 3 - Aptitude Test 

Environmentally friendly construction

Round 4 - Aptitude Test 

Friendly construction

Interview Preparation Tips

Topics to prepare for Gopalan Enterprises Site Supervisor interview:
  • Interior Designing
Interview preparation tips for other job seekers - Commercial Site incharge
Home interior experience
And exterior experience
Layout formation experience also

I applied via Campus Placement and was interviewed before Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical, case study, coding test
  • Q2. Measurements, technical question, civil knowledge, working construction type question

Interview Preparation Tips

Interview preparation tips for other job seekers - Your full ready before go to interviews, good knowledge your culture and spoken language
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Tell me about urself

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Normal question about your experience and profile
Round 3 - HR 

(1 Question)

  • Q1. After hr interview they forward to you for technical round

Interview Preparation Tips

Interview preparation tips for other job seekers - Knightfrank is a good company but they will provide multiple locations for work.
Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Qas asked some questions from profit and loss and trigonometry.

Round 2 - One-on-one 

(6 Questions)

  • Q1. The difference between opc and ppc
  • Ans. 

    OPC is Ordinary Portland Cement, while PPC is Portland Pozzolana Cement. The main difference is the materials used in their production.

    • OPC is made from limestone and clay, while PPC is made from a mixture of pozzolanic material like fly ash, volcanic ash, etc.

    • PPC is more environmentally friendly as it uses industrial by-products, reducing the carbon footprint.

    • PPC has better workability and is more resistant to chemical...

  • Answered by AI
  • Q2. The grade of steel currently in usage and their types
  • Ans. 

    Different grades of steel are used for different applications, such as construction, automotive, and manufacturing.

    • Common grades of steel include A36, A572, and A500 for construction purposes.

    • High-strength low-alloy (HSLA) steels like A588 and A709 are used in structural applications.

    • Tool steels like D2 and O1 are used for cutting and shaping materials.

    • Stainless steels like 304 and 316 are corrosion-resistant and used ...

  • Answered by AI
  • Q3. The setting time of concrete
  • Ans. 

    Setting time of concrete refers to the time it takes for the concrete to harden and become solid.

    • Setting time can vary based on factors like temperature, humidity, and mix design.

    • Setting time is important for construction projects to ensure proper curing and strength development.

    • For example, in hot weather, concrete may set faster, while in cold weather it may take longer.

    • Accelerators or retarders can be added to adjus

  • Answered by AI
  • Q4. Volume of 1 bag of cement and 1 cube
  • Ans. 

    The volume of 1 bag of cement and 1 cube can vary depending on the size and density of the materials.

    • The volume of 1 bag of cement is typically around 0.035 cubic meters or 35 liters.

    • The volume of 1 cube can vary depending on the size, but a standard cube may have a volume of 1 cubic meter.

    • It's important to consider the density of the materials when calculating volume.

  • Answered by AI
  • Q5. Whats the use of fly ash in concrete
  • Ans. 

    Fly ash is used in concrete as a replacement for Portland cement to improve workability, reduce permeability, increase durability, and decrease cost.

    • Improves workability by reducing water demand

    • Reduces permeability and increases durability

    • Decreases cost by replacing some of the Portland cement

    • Can improve the long-term strength of concrete

    • Helps in reducing greenhouse gas emissions

  • Answered by AI
  • Q6. Whats hoop strees and punching failure
  • Ans. 

    Hoop stress is the stress exerted circumferentially in a cylindrical pressure vessel, while punching failure is a type of failure that occurs in structural elements subjected to concentrated loads.

    • Hoop stress is calculated using the formula: σ = PD/2t, where P is the internal pressure, D is the diameter, and t is the thickness of the vessel.

    • Punching failure occurs when a concentrated load is applied to a structural ele...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive and answer only those questions which you know correctly.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in

Round 1 - Technical 

(2 Questions)

  • Q1. Density of materials
  • Ans. 

    Density of materials is a measure of how much mass is contained in a given volume.

    • Density is calculated by dividing the mass of a material by its volume.

    • Different materials have different densities.

    • Density is commonly measured in units such as grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

    • Materials with higher densities are generally heavier and more compact.

    • For example, lead has a high densit...

  • Answered by AI
  • Q2. Test of all construction materials

Concorde Group Interview FAQs

How many rounds are there in Concorde Group Site Engineer interview?
Concorde Group interview process usually has 4 rounds. The most common rounds in the Concorde Group interview process are HR, Resume Shortlist and Technical.
How to prepare for Concorde Group Site Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Concorde Group. The most common topics and skills that interviewers at Concorde Group expect are Access System, Advocacy, Configuration, SAN and SQL Server.
What are the top questions asked in Concorde Group Site Engineer interview?

Some of the top questions asked at the Concorde Group Site Engineer interview -

  1. Paint brand name?? Colour name and code also?? How to check paint?? Putty brand...read more
  2. Alluminium shuttering name??? Panel Thickness??? Panel sizes??? Door windows op...read more
  3. Comprehensive strength of concrete bl...read more

Tell us how to improve this page.

Concorde Group Site Engineer Salary
based on 9 salaries
₹3 L/yr - ₹6.5 L/yr
32% more than the average Site Engineer Salary in India
View more details

Concorde Group Site Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

5.0

Salary

3.0

Job security

1.0

Company culture

2.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Sr. Site Engineer/ Jr. Site Engineer

Bangalore / Bengaluru

4-9 Yrs

Not Disclosed

Site Engineer

Bangalore / Bengaluru

3-10 Yrs

Not Disclosed

Explore more jobs
Quantity Surveyor
16 salaries
unlock blur

₹3.8 L/yr - ₹5.6 L/yr

Senior Site Engineer
14 salaries
unlock blur

₹4.3 L/yr - ₹5.5 L/yr

Senior Quantity Surveyor
14 salaries
unlock blur

₹5 L/yr - ₹7 L/yr

Senior Engineer QS
12 salaries
unlock blur

₹5.8 L/yr - ₹6.5 L/yr

Assistant Manager
10 salaries
unlock blur

₹4.8 L/yr - ₹10 L/yr

Explore more salaries
Compare Concorde Group with

Prestige Group

4.3
Compare

Sobha

3.9
Compare

Brigade Group

4.2
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview