Round 1 - One-on-one 

(3 Questions)

  • Q1. What's your notice period?
  • Q2. What's your salary expectation?
  • Q3. Would you work for less salary and leave your old company early disgarding the notice period?

Interview Preparation Tips

Interview preparation tips for other job seekers - Disrespectful HR. Wasted my time and energy. They are picky on candidates who are willing to work for cheap salaries.

QA QC Engineer Jobs at Concorde Group

View all

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Directly ask for joining and tell to work with commitment
  • Q2. Ready to relocate
Round 2 - HR 

(2 Questions)

  • Q1. Salary will be hike after 6months
  • Q2. No appointment letter will be given till 1 year.

Interview Preparation Tips

Interview preparation tips for other job seekers - Never join this company , you should leave your family parents everyone to work here, no proper timings, lot of stress 16-18hrs of working hrs. Salary deductions for project delay and material loss . Monday to sunday working days, sunday upto 3:30pm to work, remaining days, 8am to no particular time of leaving. You may go home at midnight 2am or 3am.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. About road project quality control releted question
  • Q2. Soil, sand, all management question
  • Q3. Interview questions very top
  • Q4. Sand bulk density-1. 5kg/m3
  • Ans. 

    Sand bulk density is 1.5kg/m3.

    • Bulk density is the mass of a unit volume of material in its natural state.

    • It is typically measured in kg/m3 or lb/ft3.

    • Sand with a bulk density of 1.5kg/m3 is considered to be relatively light.

    • Bulk density can vary depending on factors such as moisture content and particle size.

  • Answered by AI
  • Q5. Bulk density of coarse aggregate-1600kg/m3
  • Ans. 

    Bulk density of coarse aggregate is 1600kg/m3.

    • Bulk density is the mass of a unit volume of material.

    • It is typically measured in kg/m3 or lb/ft3.

    • Coarse aggregate is typically used in concrete mixtures.

    • The bulk density of coarse aggregate can affect the strength and durability of concrete.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Best interview for rds GM
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Total Work experience Previous company Role and responsibility Current CTC
Round 3 - Technical 

(1 Question)

  • Q1. Technical skill DG sefty Transformer Sefty working principles All types breakers sefty SLD from HT line to LT line

Interview Preparation Tips

Interview preparation tips for other job seekers - You should be have good technical knowledge and skills
Be confidence
Do not nervous
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Electrical related questions
Round 3 - HR 

(1 Question)

  • Q1. Salary expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - Required technician strong
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Directly ask for joining and tell to work with commitment
  • Q2. Ready to relocate
Round 2 - HR 

(2 Questions)

  • Q1. Salary will be hike after 6months
  • Q2. No appointment letter will be given till 1 year.

Interview Preparation Tips

Interview preparation tips for other job seekers - Never join this company , you should leave your family parents everyone to work here, no proper timings, lot of stress 16-18hrs of working hrs. Salary deductions for project delay and material loss . Monday to sunday working days, sunday upto 3:30pm to work, remaining days, 8am to no particular time of leaving. You may go home at midnight 2am or 3am.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. About road project quality control releted question
  • Q2. Soil, sand, all management question
  • Q3. Interview questions very top
  • Q4. Sand bulk density-1. 5kg/m3
  • Ans. 

    Sand bulk density is 1.5kg/m3.

    • Bulk density is the mass of a unit volume of material in its natural state.

    • It is typically measured in kg/m3 or lb/ft3.

    • Sand with a bulk density of 1.5kg/m3 is considered to be relatively light.

    • Bulk density can vary depending on factors such as moisture content and particle size.

  • Answered by AI
  • Q5. Bulk density of coarse aggregate-1600kg/m3
  • Ans. 

    Bulk density of coarse aggregate is 1600kg/m3.

    • Bulk density is the mass of a unit volume of material.

    • It is typically measured in kg/m3 or lb/ft3.

    • Coarse aggregate is typically used in concrete mixtures.

    • The bulk density of coarse aggregate can affect the strength and durability of concrete.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Best interview for rds GM

I was interviewed in May 2022.

Round 1 - Technical 

(1 Question)

  • Q1. Questions are related to the operation of the substation equipment like VCB transformer panels etc
Round 2 - Technical 

(1 Question)

  • Q1. 220 kv switchyard, switchgear equipments

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep knowing what you are doing as daily basis Operation and maintenance

Interview Questionnaire 

6 Questions

  • Q1. The question asked to me on quality or, Laboratory test based on highway Subgrade, sub-base and base coarses.
  • Q2. 1. What is the M.D.D. and O.M.C. of W.M.M. and G.S.B.
  • Ans. 

    M.D.D. and O.M.C. are important parameters for W.M.M. and G.S.B.

    • M.D.D. stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil at a specific moisture content.

    • O.M.C. stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.

    • W.M.M. stands for Wet Mix Macadam, which is a type of road construction material made by mixing ag...

  • Answered by AI
  • Q3. 2.Generally, what type of zone of sand are used in construction work?
  • Ans. 

    Different types of sand zones are used in construction work depending on their properties.

    • Coarse sand is used for concrete and masonry work.

    • Fine sand is used for plastering and finishing work.

    • Pit sand is used for filling and leveling.

    • River sand is used for construction of dams and bridges.

    • Sea sand should not be used in construction due to its high salt content.

  • Answered by AI
  • Q4. Say previous work experiences..
  • Q5. C.B.R. value depends on?
  • Ans. 

    C.B.R. value depends on various factors.

    • Type of soil

    • Moisture content

    • Compaction effort

    • Penetration depth

    • Testing method

  • Answered by AI
  • Q6. What is flexural load test?
  • Ans. 

    Flexural load test is a test to determine the strength of a material under bending loads.

    • It involves applying a load to a beam or other structural element until it fails.

    • The test is commonly used in construction and engineering to determine the strength of materials such as concrete, steel, and wood.

    • The results of the test can be used to design structures that can withstand the expected loads and stresses.

    • The test can ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer positively which question's answer you have to known.

I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Mostly questions was switchyard and substations maintenance,

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn about your work in deeply and read basics about your field

Concorde Group Interview FAQs

How many rounds are there in Concorde Group QA QC Engineer interview?
Concorde Group interview process usually has 1 rounds. The most common rounds in the Concorde Group interview process are One-on-one Round.
How to prepare for Concorde Group QA QC Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Concorde Group. The most common topics and skills that interviewers at Concorde Group expect are Business Generation, CCTV, Computer Networking, Equity Research and LLD.

Tell us how to improve this page.

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 122 Interviews
DLF Interview Questions
4.0
 • 71 Interviews
Knight Frank Interview Questions
4.1
 • 44 Interviews
InvestoXpert Interview Questions
4.6
 • 40 Interviews
Prestige Group Interview Questions
4.3
 • 35 Interviews
Brigade Group Interview Questions
4.2
 • 31 Interviews
Aliens Group Interview Questions
3.3
 • 30 Interviews
View all

Concorde Group QA QC Engineer Reviews and Ratings

based on 1 review

1.0/5

Rating in categories

1.0

Skill development

1.0

Work-Life balance

1.0

Salary & Benefits

1.0

Job Security

1.0

Company culture

1.0

Promotions/Appraisal

1.0

Work Satisfaction

Explore 1 Review and Rating
QA/QC Engineer

Bangalore / Bengaluru

6-12 Yrs

Not Disclosed

Explore more jobs
Quantity Surveyor
16 salaries
unlock blur

₹3.8 L/yr - ₹5.6 L/yr

Senior Site Engineer
14 salaries
unlock blur

₹4.3 L/yr - ₹5.5 L/yr

Senior Quantity Surveyor
14 salaries
unlock blur

₹5 L/yr - ₹7 L/yr

Senior Engineer QS
12 salaries
unlock blur

₹5.8 L/yr - ₹6.5 L/yr

Assistant Manager
10 salaries
unlock blur

₹4.8 L/yr - ₹10 L/yr

Explore more salaries
Compare Concorde Group with

Prestige Group

4.3
Compare

Sobha

3.9
Compare

Brigade Group

4.2
Compare

Godrej Properties

3.7
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview