Filter interviews by
I applied via Walk-in and was interviewed in Nov 2024. There were 2 interview rounds.
Folks,
Prepare the below topics very well.
1. Engineering mechanics
2. GD and T
3. Strength of materials
4. Manufacturing process
5. Tolerance stack up analysis
6. Engineering drawing
I had prepared them but still unable to clear the paper cause questions were tricky enough to answer.
I hope this helps you better for practice.
All the best “Brothers, Sister and Friends”.
Shear force diagram shows the variation of shear force along the length of a beam, while bending moment diagram shows the variation of bending moment.
Shear force diagram is a graph that shows the variation of shear force along the length of a beam.
Bending moment diagram is a graph that shows the variation of bending moment along the length of a beam.
Shear force is the force that acts parallel to the cross-section of th...
The beam bending equation relates the bending moment, beam material properties, and beam geometry to the beam deflection.
The beam bending equation is typically expressed as: M = E * I * d^2y/dx^2, where M is the bending moment, E is the modulus of elasticity, I is the moment of inertia, y is the deflection, and x is the position along the beam.
The equation can be used to calculate the deflection of a beam under a given...
Finite element method is a numerical technique used to find approximate solutions to boundary value problems.
Finite element method divides a complex problem into smaller, simpler parts called finite elements.
Each finite element has a set of equations that approximate the behavior of the original problem.
By solving these equations for all elements and combining the results, an approximate solution to the overall problem...
I applied via Approached by Company and was interviewed in Dec 2023. There was 1 interview round.
Collins Aerospace interview questions for popular designations
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
SDLC process is a structured approach to software development that defines tasks performed at each stage of the software development life cycle.
1. Planning: Define project scope, requirements, and create a project plan.
2. Analysis: Gather and analyze requirements to understand the project's goals.
3. Design: Create a detailed design plan based on the requirements.
4. Implementation: Develop the software based on the desi...
I led a team in implementing a new automated testing framework which significantly improved the efficiency and accuracy of our testing process.
Identified the need for a more efficient testing process
Researched and evaluated different automated testing tools
Led a team in implementing the chosen automated testing framework
Provided training and support to team members on using the new framework
Monitored and analyzed the r...
Get interview-ready with Top Collins Aerospace Interview Questions
I applied via Job Portal and was interviewed in Oct 2023. There were 3 interview rounds.
C is a procedural programming language while C++ is a multi-paradigm programming language with support for object-oriented programming.
C is a procedural programming language, while C++ supports both procedural and object-oriented programming.
C does not support classes and objects, while C++ does.
C does not have features like inheritance, polymorphism, and encapsulation which are supported in C++.
C++ has additional feat...
Rule of 5 in C++ states that if a class needs to define any of the following functions, it should explicitly define all of them: destructor, copy constructor, copy assignment operator, move constructor, move assignment operator.
Rule of 5 helps in managing resources and preventing memory leaks in C++ classes.
If a class needs to define any of the mentioned functions, it should define all of them to ensure proper resource...
I applied via Naukri.com and was interviewed before Jan 2022. There was 1 interview round.
I applied via Campus Placement
Yes, I have knowledge on Do 178B/C standards for software development in airborne systems.
Familiar with the software development process outlined in Do 178B/C
Understand the importance of software verification and validation in aviation
Experience in implementing software requirements and testing in compliance with Do 178B/C standards
Test cases for a requirement
Verify the system behavior meets the requirement
Test positive and negative scenarios
Check boundary conditions
Validate input data
Ensure proper error handling
Top trending discussions
Some of the top questions asked at the Collins Aerospace interview for experienced candidates -
The duration of Collins Aerospace interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 25 interviews
Interview experience
based on 745 reviews
Rating in categories
Lead Engineer
514
salaries
| ₹6 L/yr - ₹21.5 L/yr |
Senior Leader Engineer
419
salaries
| ₹9.8 L/yr - ₹30 L/yr |
Associate Engineer
379
salaries
| ₹4 L/yr - ₹13 L/yr |
Design Engineer
215
salaries
| ₹4.1 L/yr - ₹12 L/yr |
Lead Software Engineer
198
salaries
| ₹6.2 L/yr - ₹19.2 L/yr |
Boeing
AIRBUS
Tata Lockheed Martin Aerostructures
Raytheon