Filter interviews by
I applied via Company Website
Pipeline reletive questions
Interval is a period of time or space between two points.
Interval is used to measure the duration between two events or points in time.
In civil engineering, interval is used to determine the frequency of inspections or maintenance of structures.
For example, the interval between two bridge inspections may be every 2 years.
Interval can also refer to the distance between two points in space, such as the interval between t...
Gasket aviator is used to prevent leakage between two surfaces.
It is a type of gasket used in aviation industry.
It is placed between two surfaces to prevent leakage of fluids or gases.
It is made up of materials like rubber, silicone, or metal.
It is used in aircraft engines, hydraulic systems, and fuel systems.
It helps in maintaining the pressure and temperature of the system.
A pump house is a building that houses pumps and other equipment used to pump and distribute water or other fluids.
Pump houses are commonly found in water treatment plants, sewage treatment plants, and irrigation systems.
They typically contain pumps, valves, pipes, and other equipment necessary for pumping and distributing fluids.
Pump houses may also include control systems and monitoring equipment to ensure proper ope...
Chemical treatment in water plant is the process of adding chemicals to water to remove impurities and make it safe for consumption.
Chemicals like chlorine, alum, and lime are added to water to remove impurities.
Chlorine is added to kill bacteria and viruses.
Alum is added to remove suspended particles.
Lime is added to adjust the pH level of water.
Chemical treatment is an important step in water purification process.
It ...
I was interviewed in Feb 2017.
posted on 3 May 2017
I was interviewed before May 2016.
I was interviewed in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes, which is 2 fishes.
To make the red fishes 98%, subtract 1% (2 fishes) from 99% (198 fishes).
To find the number of fishes to be removed, divide the difference by 1% (2 fishes).
Therefore, 50 fishes have to be removed to make the red fishes 98%.
I was interviewed in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes to find the number of red fishes.
Subtract the number of red fishes from 200 to find the number of non-red fishes.
Calculate 2% of the total number of fishes to find the desired number of red fishes.
Subtract the desired number of red fishes from the current number of red fishes to find the number of fishes to be removed.
posted on 28 Jun 2017
I was interviewed in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes to find out how many fishes represent 1%.
Multiply the result by 2 to find out how many fishes represent 2%.
Subtract the result from 200 to find out how many fishes represent 98%.
I was interviewed in Jul 2017.
Yes, I am a fresher with no past working experience.
I am a recent graduate looking to gain experience in the field.
I have completed internships or projects during my studies.
I am eager to learn and grow in a professional environment.
I was responsible for conducting market research, creating social media content, and assisting with event planning.
Conducted market research to identify trends and opportunities
Created engaging social media content to increase brand awareness
Assisted in planning and executing events to promote company products/services
I am a recent graduate with a degree in Computer Science and a passion for coding and problem-solving.
Recent graduate with a degree in Computer Science
Passionate about coding and problem-solving
Strong communication and teamwork skills
Experience with programming languages such as Java, Python, and C++
I applied via Approached by Company and was interviewed in Jul 2017. There were 5 interview rounds.
I applied via Other and was interviewed in Jan 2018. There were 5 interview rounds.
based on 1 interview
Interview experience
Civil Site Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Construction Management
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager Civil
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Huawei Technologies
Z X Learning
Evision Technoserve
Cogoport