Filter interviews by
I applied via Walk-in and was interviewed before Apr 2019. There were 3 interview rounds.
SOP preparation includes a detailed description of procedures, safety measures, and quality control measures.
Detailed procedures for each step of the process
Safety measures to be followed during the process
Quality control measures to ensure consistency and accuracy
Equipment and materials required for the process
Training requirements for personnel involved in the process
BPCR stands for Biological Product Deviation Reporting. It is a system used to report any deviations in the manufacturing process of biological products.
BPCR is required by the FDA for all licensed biological products
It is used to report any deviations in the manufacturing process that may affect the safety, purity, or potency of the product
Deviation reports must be submitted within 45 days of discovery
Examples of devi...
I applied via Naukri.com and was interviewed before Dec 2023. There were 2 interview rounds.
Yes, I calculated the quantity of electrical work.
Yes, I calculated the quantity of electrical work based on the project specifications and requirements.
I used relevant formulas and measurements to accurately determine the quantity of electrical work needed.
For example, I calculated the amount of wiring, fixtures, and equipment required for a specific project.
I also took into account factors such as labor costs and tim...
I am looking for a competitive salary that reflects my experience and skills in the industry.
I expect a salary that is in line with industry standards for an Assistant Manager Estimation Engineer position.
I am open to negotiation based on the responsibilities and expectations of the role.
I value fair compensation for my expertise and contributions to the team.
I am looking for a salary package that includes benefits suc...
I applied via LinkedIn and was interviewed before Dec 2022. There were 3 interview rounds.
Chandak Group interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
I appeared for an interview before Feb 2024.
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
posted on 27 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
A structured approach to work enhances efficiency, collaboration, and project success.
Define clear objectives: Establish what needs to be achieved, e.g., project milestones.
Plan and prioritize tasks: Use tools like Gantt charts to visualize timelines.
Collaborate effectively: Regular team meetings to discuss progress and challenges.
Monitor progress: Use KPIs to track performance and make adjustments as needed.
Review and...
I appeared for an interview in Nov 2024.
based on 9 interviews
Interview experience
based on 101 reviews
Rating in categories
Assistant Manager
32
salaries
| ₹5.2 L/yr - ₹10 L/yr |
Site Engineer
18
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Deputy Manager
14
salaries
| ₹7.2 L/yr - ₹13 L/yr |
Manager
11
salaries
| ₹11.5 L/yr - ₹14 L/yr |
Civil Site Engineer
10
salaries
| ₹3 L/yr - ₹6 L/yr |
Omaxe
Runwal Group
Mahindra Lifespace Developers
Realty Assistant