Upload Button Icon Add office photos

Filter interviews by

CDS Infra Projects Interview Questions, Process, and Tips

Updated 11 Jan 2025

Top CDS Infra Projects Interview Questions and Answers

View all 7 questions

CDS Infra Projects Interview Experiences

Popular Designations

8 interviews found

Assistant Manager Interview Questions & Answers

user image sanjay kashyap

posted on 30 Sep 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. How much zone in surveying engineering
  • Ans. 

    Zone in surveying engineering refers to a specific area designated for surveying purposes.

    • A zone in surveying engineering typically refers to a specific area on the Earth's surface that is being surveyed.

    • Zones are often defined by coordinates or boundaries to help organize and manage surveying data.

    • For example, the UTM (Universal Transverse Mercator) system divides the Earth into zones for easier mapping and navigation

  • Answered by AI
  • Q2. Which zone your work
  • Q3. What is the leastcount of totalstation & autolevel
  • Ans. 

    The least count of a total station is typically 1 second, while the least count of an auto level is usually 0.2mm.

    • Total station least count is usually 1 second

    • Auto level least count is typically 0.2mm

  • Answered by AI
  • Q4. What you convert coordinate into lat long
  • Ans. 

    Coordinates can be converted into latitude and longitude using mathematical formulas and tools like GPS.

    • Use mathematical formulas to convert coordinates into lat long

    • Utilize tools like GPS to accurately determine lat long

    • Consider the Earth's shape and curvature when converting coordinates

  • Answered by AI
  • Q5. 62 meter structure width & angel is 23॰ what skew lenght for structure
  • Ans. 

    To calculate the skew length for a structure with a 62 meter width and 23 degree angle, trigonometry can be used.

    • Use trigonometry to calculate the skew length

    • Skew length = width / sin(angle)

    • Substitute the values: Skew length = 62 / sin(23)

    • Calculate the skew length using a calculator

  • Answered by AI

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (87)

Interview Questions & Answers

user image Anonymous

posted on 1 Apr 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Mar 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

Aptitude test like a resioninng types.where interviewer want to know about technical things.

Round 3 - Group Discussion 

In group discussion.we share the knowledge about any topic

Round 4 - HR 

(1 Question)

  • Q1. In hr round interviewer want to know about the knowledge of candidates and there past experience.and there career goals.
Round 5 - One-on-one 

(1 Question)

  • Q1. In one or one round interviewer asked to candidates about the salary expectation.and job timings.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good service has to be given to the customer Every month we have to achieve the target every month we have to achieve the kpi
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Where do you see in next 5 years?
Round 2 - Aptitude Test 

1hr, quite simple normal mathematics questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Quite simple

Software Engineer Interview Questions asked at other Companies

Q1. Bridge and torch problem : Four people come to a river in the night. There is a narrow bridge, but it can only hold two people at a time. They have one torch and, because it's night, the torch has to be used when crossing the bridge. Person... read more
View answer (196)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Why are you interested in our organisation.
  • Ans. 

    I am interested in your organisation because of its reputation for innovation and commitment to sustainability.

    • I admire your company's track record of developing cutting-edge technologies.

    • I am impressed by your dedication to environmental responsibility, as demonstrated by your recent sustainability initiatives.

    • I believe that your organisation offers a dynamic and collaborative work environment that aligns with my care

  • Answered by AI
Round 2 - Group Discussion 

Ask questions one by one

Interview Preparation Tips

Interview preparation tips for other job seekers - For lab technician or junior engineer or assistant engineer must have minimum one work knowledge properly.one of these soil testing, cement testing,wmm&GSB, CTSB, bituminous or bitumen, concrete etc

Assistant Engineer Interview Questions asked at other Companies

Q1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less than 5 Meter cube.
View answer (9)

CDS Infra Projects interview questions for popular designations

 Assistant Engineer

 (1)

 Highway Engineer

 (1)

 Logistics Executive

 (1)

 Software Engineer

 (1)

 Structural Engineer

 (1)

 Assistant Manager

 (1)

 Foreman

 (1)

I applied via Company Website and was interviewed before Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. Sir vacancy for the job in your company Civil Highway Engineer
  • Q2. Linkdin is a very good platform
  • Q3. Thank you for CDS INFRA PROJECT LTD
  • Q4. I really enjoyed working in Chadas Infra Project
  • Q5. I love working in CDS Infra Project

Interview Preparation Tips

Topics to prepare for CDS Infra Projects Highway Engineer interview:
  • Highway Engineer
Interview preparation tips for other job seekers - Hello Sir, i am writing to apply for 'highways civil Sr. Engineering' post in your company and responsibilities seems exciting and career goals. i would like to bring your attention to my key strengths for the job role: # 10th Passed From HBSE Board #12th Passed From HBSE Boar # Diploma civil engineer (2016) #B.Tech civil engineer (2017-19) #M.Tech.(19-2021) #Interest and knowledge in highways #5 years of Experience. For more information, i have attend my resume for your consideration thank you for your valuable time . i am always reachable on my email and phone number . Sincerely Mohit Chauhan XXXXX XXXXX

Highway Engineer Interview Questions asked at other Companies

Q1. What is the density of soil in embankment layer.
View answer (7)

Get interview-ready with Top CDS Infra Projects Interview Questions

I applied via Company Website and was interviewed in Nov 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Asking about company work
  • Q2. What facilities are available in the company, what kind of work do you like, that's all I have told
  • Q3. How do you like my answer?

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir you are satisfied with my answer then give me job

Logistics Executive Interview Questions asked at other Companies

Q1. Did you work on busy software and advance excel before?. How much rating will you give yourself for advance excel. Did you know tally? Did you work on tally before? How much your is your typing speed on computer?
View answer (4)

Foreman Interview Questions & Answers

user image Niranjan Kumar

posted on 4 Feb 2022

Round 1 - HR 

(3 Questions)

  • Q1. Where do you see yourself in 5 years?
  • Q2. Share details of your previous job.
  • Q3. What are your salary expectations?
Round 2 - Technical 

Interview Preparation Tips

Interview preparation tips for other job seekers - Office management is

Foreman Interview Questions asked at other Companies

Q1. what is tools ?are tou technician what is the power
View answer (4)

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. PSC GIRDERS stressing process.
  • Ans. 

    PSC girders are stressed using hydraulic jacks to induce compressive forces in the concrete.

    • Prestressing is done to counteract the tensile stresses that develop in the concrete due to its own weight and external loads.

    • The stressing process involves placing high-strength steel wires or strands inside the concrete girder before casting it.

    • After the concrete has hardened, the wires are tensioned using hydraulic jacks, whi...

  • Answered by AI
  • Q2. Type of pile
  • Ans. 

    Piles are long cylindrical structures used to transfer loads from the superstructure to the soil.

    • Types of piles include driven piles, cast-in-place piles, and helical piles.

    • Driven piles are installed by hammering or vibrating them into the ground.

    • Cast-in-place piles are formed by drilling a hole and filling it with concrete.

    • Helical piles are screwed into the ground using a hydraulic motor.

    • The type of pile used depends ...

  • Answered by AI
  • Q3. Different between friction and end bearing pile.
  • Ans. 

    Friction piles rely on skin friction for support while end bearing piles rely on the bearing capacity of the soil or rock at the bottom.

    • Friction piles transfer the load to the soil through frictional resistance between the pile surface and the soil.

    • End bearing piles transfer the load to the soil through the bearing capacity of the soil or rock at the bottom of the pile.

    • Friction piles are suitable for cohesive soils whi...

  • Answered by AI
  • Q4. About BBS

Interview Preparation Tips

Interview preparation tips for other job seekers - Be the technical sound, confident about work, and skills and work that you have shown in your resume.

Structural Engineer Interview Questions asked at other Companies

Q1. 1. Find weight and COG of an irrrgular shape. Unit weight of member was given. 2. Calculate force required for COG shift. W load was applied at center of rectangle and we had to calculate forces at all four corners to shift the cog. 3. SFD ... read more
View answer (2)

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Be clear on salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Say confidently what ever it is..

I applied via Company Website and was interviewed in Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Nodejs basics,AWS S3,script file run command,how to catch db timeout
  • Q2. Connect db options,
  • Ans. 

    Connecting to a database has multiple options depending on the type of database and programming language used.

    • For SQL databases, options include using JDBC for Java, ODBC for C++, and ADO.NET for C#.

    • For NoSQL databases, options include using MongoDB's driver for Python or Node.js.

    • ORMs like Hibernate and Entity Framework can also be used to abstract away the database connection details.

    • Connection strings are used to spe...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Db connection attributes need to prepare well

CDS Infra Projects Interview FAQs

How many rounds are there in CDS Infra Projects interview?
CDS Infra Projects interview process usually has 2-3 rounds. The most common rounds in the CDS Infra Projects interview process are HR, Resume Shortlist and Aptitude Test.
How to prepare for CDS Infra Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at CDS Infra Projects. The most common topics and skills that interviewers at CDS Infra Projects expect are Facility Management and Housekeeping Management.
What are the top questions asked in CDS Infra Projects interview?

Some of the top questions asked at the CDS Infra Projects interview -

  1. 62 meter structure width & angel is 23॰ what skew lenght for struct...read more
  2. What is the leastcount of totalstation & autole...read more
  3. What you convert coordinate into lat l...read more

Tell us how to improve this page.

CDS Infra Projects Interview Process

based on 11 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 423 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

CDS Infra Projects Reviews and Ratings

based on 126 reviews

3.5/5

Rating in categories

3.3

Skill development

3.5

Work-life balance

3.3

Salary

3.3

Job security

3.5

Company culture

3.3

Promotions

3.5

Work satisfaction

Explore 126 Reviews and Ratings
Assistant Manager
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Design Engineer
9 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Highway Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Manager
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Software Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare CDS Infra Projects with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview