Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by CFlo Team. If you also belong to the team, you can get access from here

CFlo Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

CFlo Interview Questions, Process, and Tips

Updated 28 Jul 2024

Top CFlo Interview Questions and Answers

CFlo Interview Experiences

Popular Designations

8 interviews found

Project Engineer Interview Questions & Answers

user image Rajat Bhattacharya

posted on 28 Jul 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Specify a bolt by each way possible
  • Ans. 

    A bolt can be specified by its size, material, thread type, head type, and finish.

    • Size: Specify the diameter and length of the bolt (e.g. 1/4 inch x 2 inches)

    • Material: Specify the material the bolt is made of (e.g. stainless steel, carbon steel)

    • Thread type: Specify the thread pitch and type (e.g. coarse thread, fine thread)

    • Head type: Specify the shape of the bolt head (e.g. hex head, round head)

    • Finish: Specify the fini

  • Answered by AI
  • Q2. How to alignment a equipment
  • Ans. 

    Alignment of equipment involves ensuring all components are properly positioned for optimal performance.

    • Use precision measuring tools such as laser alignment systems

    • Follow manufacturer's guidelines for alignment procedures

    • Check for any wear or damage on components that may affect alignment

    • Adjust bolts or shims as needed to achieve proper alignment

    • Perform regular maintenance checks to ensure alignment is maintained

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why you want to leave your current company
  • Ans. 

    Seeking new challenges and growth opportunities

    • Looking for a new challenge to further develop my skills and knowledge

    • Interested in exploring new technologies and projects

    • Seeking a company with more opportunities for career advancement

    • Current company lacks opportunities for professional growth

    • Want to work in a more collaborative and innovative environment

  • Answered by AI
  • Q2. What is your expected CTC
  • Ans. 

    My expected CTC is based on my experience, skills, and the industry standards.

    • My expected CTC is in line with the market rates for Project Engineers.

    • I have taken into consideration my years of experience and expertise in the field.

    • I am open to negotiation based on the overall compensation package offered by the company.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well for both technical and HR round before appearing.

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (10)

Senior Engineer Interview Questions & Answers

user image Snehasish Bose

posted on 21 Feb 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Assignment 

Details technical round about your previous job role

Round 2 - One-on-one 

(2 Questions)

  • Q1. Personality test,tool test etc
  • Q2. Design tool test

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)

National Head Interview Questions & Answers

user image Sagar Machhindra Chavhan

posted on 28 Jun 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Knowledge about the product and market

Round 3 - Technical 

(1 Question)

  • Q1. Product knowledge , process etc
Round 4 - One-on-one 

(1 Question)

  • Q1. Management round with Department head/ CBO
Round 5 - HR 

(1 Question)

  • Q1. Package negotiation and document work

Interview Preparation Tips

Interview preparation tips for other job seekers - Company offers you a Good I would say very good platform .

National Head Interview Questions asked at other Companies

Q1. How to ensure profitability of the company.
View answer (1)
Round 1 - Technical 

(1 Question)

  • Q1. Basis technical questions and asking the past experience
Round 2 - One-on-one 

(1 Question)

  • Q1. Some management problem solving questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Sime interview. Stay confident and make your basics strong.

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (87)

CFlo interview questions for popular designations

 Assistant Manager

 (2)

 IT Manager

 (1)

 National Head

 (1)

 Project Engineer

 (1)

 QA QC Engineer

 (1)

 Relationship Manager

 (1)

 Senior Engineer

 (1)

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. General basic discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear your basic knowledge and stay confident

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (87)
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2022. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Question regarding Washing Plant operation.
  • Q2. Cyclone types , Pump specifications, Screen usage .
  • Q3. Zone types , product specifications
  • Q4. Viba round with same technical questions. Flow diagram and all

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn the Basic flow chart of Washing Plant operation. Learn the Sub spare parts usage and utility .

Relationship Manager Interview Questions asked at other Companies

Q1. How will you market banking products ? Are you willing to work at the ground level ? What are the challenges of marketing at ground level ? How different is it from other kinds of marketing? What did you learn in mba with respect to marketi... read more
View answer (47)

IT Manager Interview Questions & Answers

user image Anonymous

posted on 11 May 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Overall IT related question.
  • Ans. I can give best performance as Administrator of IT.
  • Answered Anonymously
  • Q2. ERP Implementation.
  • Ans. 

    ERP implementation involves the process of integrating and deploying an enterprise resource planning system.

    • ERP implementation involves analyzing business requirements and selecting the appropriate ERP system.

    • It includes data migration, system configuration, and customization.

    • Training and change management are crucial for successful ERP implementation.

    • Post-implementation support and continuous improvement are necessary...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for CFlo IT Manager interview:
  • Administration
Interview preparation tips for other job seekers - Concept should be clear in your applies post.

IT Manager Interview Questions asked at other Companies

Q1. What are the components of Project Management triangle?
View answer (2)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Jan 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Types of welding and fabrication process. IS codes of materials. Drawing related questions.
  • Q2. Knowledge about different types of measurement instruments.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Environment for work. All team members are very helpful.

QA QC Engineer Interview Questions asked at other Companies

Q1. wha is your response ?, if material will purchase from any factory then what will u do that ? , how many hours can u do work in a day?, do u know all plant calibration?, how the borrow area will select ?, how u manage your junior in work pe... read more
View answer (3)

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Basic e.m subjects

Interview Preparation Tips

Interview preparation tips for other job seekers - good
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 7 tools of production planning
  • Ans. 

    The 7 tools of production planning are Gantt charts, PERT charts, flowcharts, histograms, Pareto charts, scatter diagrams, and control charts.

    • Gantt charts help in scheduling and tracking progress

    • PERT charts help in identifying critical path and dependencies

    • Flowcharts help in visualizing the process flow

    • Histograms help in analyzing frequency distribution

    • Pareto charts help in identifying the most significant factors

    • Scatt...

  • Answered by AI
  • Q2. Difference between planning and process planning
  • Ans. 

    Planning is the process of deciding what to do and how to do it, while process planning is the detailed planning of specific processes.

    • Planning involves setting goals, objectives, and strategies to achieve them.

    • Process planning involves breaking down the overall plan into specific steps and determining the resources needed for each step.

    • Planning is more high-level and strategic, while process planning is more detailed ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please refer industrial engineering

CFlo Interview FAQs

How many rounds are there in CFlo interview?
CFlo interview process usually has 2-3 rounds. The most common rounds in the CFlo interview process are Technical, Resume Shortlist and One-on-one Round.
How to prepare for CFlo interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at CFlo. The most common topics and skills that interviewers at CFlo expect are Construction Equipment, ERP, Analytical, Interpersonal Skills and Report Writing.
What are the top questions asked in CFlo interview?

Some of the top questions asked at the CFlo interview -

  1. Specify a bolt by each way possi...read more
  2. How to alignment a equipm...read more
  3. What is your expected ...read more

Tell us how to improve this page.

CFlo Interview Process

based on 6 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 731 Interviews
Metso Outotec Interview Questions
4.3
 • 65 Interviews
TKIL Interview Questions
4.2
 • 58 Interviews
TIL Interview Questions
3.6
 • 7 Interviews
Terex Interview Questions
3.8
 • 7 Interviews
View all

CFlo Reviews and Ratings

based on 155 reviews

4.5/5

Rating in categories

4.3

Skill development

4.3

Work-life balance

4.0

Salary

4.5

Job security

4.4

Company culture

4.1

Promotions

4.2

Work satisfaction

Explore 155 Reviews and Ratings
Service Engineer
20 salaries
unlock blur

₹2.7 L/yr - ₹4.5 L/yr

Project Engineer
11 salaries
unlock blur

₹2.8 L/yr - ₹3.7 L/yr

Mechanical Engg. Design
8 salaries
unlock blur

₹2.5 L/yr - ₹4 L/yr

Maintenance Engineer
7 salaries
unlock blur

₹2.6 L/yr - ₹4 L/yr

Regional Service Engineer
7 salaries
unlock blur

₹3.2 L/yr - ₹3.7 L/yr

Explore more salaries
Compare CFlo with

Metso

4.3
Compare

TKIL

4.2
Compare

McNally Bharat Engineering

4.1
Compare

TIL

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview