i
CFlo
Filter interviews by
A bolt can be specified by its size, material, thread type, head type, and finish.
Size: Specify the diameter and length of the bolt (e.g. 1/4 inch x 2 inches)
Material: Specify the material the bolt is made of (e.g. stainless steel, carbon steel)
Thread type: Specify the thread pitch and type (e.g. coarse thread, fine thread)
Head type: Specify the shape of the bolt head (e.g. hex head, round head)
Finish: Specify the fini
Alignment of equipment involves ensuring all components are properly positioned for optimal performance.
Use precision measuring tools such as laser alignment systems
Follow manufacturer's guidelines for alignment procedures
Check for any wear or damage on components that may affect alignment
Adjust bolts or shims as needed to achieve proper alignment
Perform regular maintenance checks to ensure alignment is maintained
Seeking new challenges and growth opportunities
Looking for a new challenge to further develop my skills and knowledge
Interested in exploring new technologies and projects
Seeking a company with more opportunities for career advancement
Current company lacks opportunities for professional growth
Want to work in a more collaborative and innovative environment
My expected CTC is based on my experience, skills, and the industry standards.
My expected CTC is in line with the market rates for Project Engineers.
I have taken into consideration my years of experience and expertise in the field.
I am open to negotiation based on the overall compensation package offered by the company.
Details technical round about your previous job role
Knowledge about the product and market
CFlo interview questions for popular designations
I applied via Naukri.com and was interviewed before Apr 2022. There was 1 interview round.
I applied via Referral and was interviewed before May 2022. There were 2 interview rounds.
ERP implementation involves the process of integrating and deploying an enterprise resource planning system.
ERP implementation involves analyzing business requirements and selecting the appropriate ERP system.
It includes data migration, system configuration, and customization.
Training and change management are crucial for successful ERP implementation.
Post-implementation support and continuous improvement are necessary...
I applied via LinkedIn and was interviewed before Jan 2022. There was 1 interview round.
Top trending discussions
posted on 16 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.
The 7 tools of production planning are Gantt charts, PERT charts, flowcharts, histograms, Pareto charts, scatter diagrams, and control charts.
Gantt charts help in scheduling and tracking progress
PERT charts help in identifying critical path and dependencies
Flowcharts help in visualizing the process flow
Histograms help in analyzing frequency distribution
Pareto charts help in identifying the most significant factors
Scatt...
Planning is the process of deciding what to do and how to do it, while process planning is the detailed planning of specific processes.
Planning involves setting goals, objectives, and strategies to achieve them.
Process planning involves breaking down the overall plan into specific steps and determining the resources needed for each step.
Planning is more high-level and strategic, while process planning is more detailed ...
based on 6 interviews
Interview experience
Service Engineer
20
salaries
| ₹2.7 L/yr - ₹4.5 L/yr |
Project Engineer
11
salaries
| ₹2.8 L/yr - ₹3.7 L/yr |
Mechanical Engg. Design
8
salaries
| ₹2.5 L/yr - ₹4 L/yr |
Maintenance Engineer
7
salaries
| ₹2.6 L/yr - ₹4 L/yr |
Regional Service Engineer
7
salaries
| ₹3.2 L/yr - ₹3.7 L/yr |
Metso
TKIL
McNally Bharat Engineering
TIL