I applied via Approached by Company and was interviewed before Oct 2021. There were 2 interview rounds.
Top trending discussions
posted on 30 Aug 2021
I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.
posted on 4 May 2019
posted on 25 Oct 2017
I appeared for an interview before Oct 2016.
Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 15 Nov 2020
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
The duration and machinery requirement for dumping and compacting one lakh cum of soil.
The duration depends on the capacity of the machinery and the number of machines used.
The type of soil and the site conditions also affect the duration.
On average, it takes around 30-45 days to complete the task.
The machinery required includes excavators, bulldozers, dump trucks, and compactors.
Minor bridges are usually shorter and have a lower weight capacity than major bridges.
Major bridges are typically longer and have a higher weight capacity than minor bridges.
Minor bridges are often used for pedestrian or bike traffic, while major bridges are used for vehicles and heavy machinery.
Major bridges may require more maintenance and have a higher construction cost than minor bridges.
Examples of major bridges i...
posted on 12 Nov 2020
I applied via Company Website and was interviewed in May 2020. There were 3 interview rounds.
MPLS is a protocol used for efficient packet forwarding. It uses labels to identify paths instead of IP addresses.
MPLS stands for Multiprotocol Label Switching
Labels are assigned to packets at the ingress router
Labels are used to identify the path a packet should take through the network
Labels are swapped at each MPLS router along the path
The last MPLS router removes the label and forwards the packet based on the IP ad...
Route reflector is a BGP feature that allows a router to advertise routes to its clients without requiring full mesh connectivity.
Route reflector reduces the number of iBGP peerings required in a network.
It helps in scaling the network by reducing the number of updates and processing required.
Route reflector can be configured in a hierarchical manner to further reduce the number of iBGP peerings.
It is commonly used in ...
posted on 21 Mar 2023
I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.
based on 2 interviews
Interview experience
Anonymously discuss salaries, work culture, and many more
Get Ambitionbox App
based on 41 reviews
Rating in categories
Bangalore / Bengaluru
3-8 Yrs
Not Disclosed
Service Engineer
15
salaries
| ₹2.3 L/yr - ₹5.3 L/yr |
Design Engineer
11
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Project Engineer
10
salaries
| ₹2.8 L/yr - ₹4.8 L/yr |
Vendor Development Engineer
9
salaries
| ₹2.2 L/yr - ₹3.8 L/yr |
Graduate Engineer Trainee (Get)
7
salaries
| ₹2 L/yr - ₹2.5 L/yr |
GMR Group
Essar Projects India
Hindustan Construction Company
IL&FS Engineering and Construction