Upload Button Icon Add office photos

CBRE

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Clear (1)

CBRE Associate Software Engineer Interview Questions and Answers

Updated 15 Oct 2023

CBRE Associate Software Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in Sep 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Aptitude Test 

Normal reasoning question

Round 3 - Coding Test 

Anticlockwise printed array rotation

Round 4 - Group Discussion 

Human Intelligent and Artificial Intelligent

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Related to QA/QC and IS standards

Interview Preparation Tips

Interview preparation tips for other job seekers - Strong base required to crack return test
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. Tell ur self ur from ur student u ug pg
  • Ans. 

    I am a software developer with a background in undergraduate and postgraduate studies.

    • I completed my undergraduate degree in Computer Science at XYZ University.

    • I pursued my postgraduate studies in Software Engineering at ABC Institute.

    • I have a strong foundation in programming languages such as Java, Python, and C++.

    • I have experience working on various projects during my studies, including a web application for a local

  • Answered by AI
  • Q2. Last u have book reding r movies watching
  • Q3. Work experience
  • Q4. U hope that u would be a right person for hering you in the job
  • Q5. Even disciplined towards senior attocities

Interview Preparation Tips

Topics to prepare for DLF Software Developer interview:
  • Computer Operating
  • Planning
  • Full Stack
  • Multimedia
  • Extension
  • Business Development
  • Clearing
  • Add
  • Multimedia Framework
  • work f
Interview preparation tips for other job seekers - Update your resume tailor your cover act kindly to everyone send follow up emails keep track of the jobs you apply tolearn job keywords
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Dressing and personality

Round 2 - Technical 

(1 Question)

  • Q1. Site questions and finishing work

Senior Engineer Interview Questions & Answers

DLF user image MRITUNJAY KUMAR

posted on 15 Mar 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Structure work going on at site
  • Ans. 

    The structure work at the site involves the construction of a new building using steel beams and concrete columns.

    • Steel beams are being used for the framework of the building

    • Concrete columns are being installed to support the structure

    • The construction process includes pouring concrete, welding steel beams, and erecting walls

  • Answered by AI
  • Q2. Survey related questions
  • Q3. Planning related
  • Q4. About Relocation nearby site
  • Q5. Manage site works
  • Ans. 

    Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.

    • Coordinate with contractors and subcontractors to ensure work is completed on time and within budget

    • Monitor progress of construction activities and address any issues that may arise

    • Ensure compliance with safety regulations and quality standards

    • Communicat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready with your portfolio,and manage

I applied via Campus Placement and was interviewed in Jun 2021. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Tell me about concrete technology?
  • Ans. 

    Concrete technology is the study of the properties and behavior of concrete, including its composition, production, and application.

    • Concrete is a composite material made up of cement, water, aggregates, and often other additives.

    • It is widely used in construction for its strength, durability, and versatility.

    • Concrete technology involves understanding the chemical reactions and physical properties of concrete.

    • It includes...

  • Answered by AI
  • Q2. Tell me about yourself?
  • Q3. So I was very scared I somehow gave an introduction in English and then they ask me another question
  • Q4. Your favourite subject
  • Ans. 

    My favorite subject is computer science.

    • I enjoy studying algorithms and data structures.

    • I find programming languages fascinating and love exploring their features.

    • I am passionate about software development and enjoy solving complex problems.

    • I am interested in artificial intelligence and machine learning.

    • I enjoy learning about computer networks and cybersecurity.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Then I said a lot I got very positive about what I answer then they ask my family background I said my parents occupation is farmers and I am come from financially poor family and then they got very emotional because my situation was like being emotional they are finally told me that you you are very smart don't give up such preserver as honesty and effort never give up and six days after the interview I got a call from their HR and they ask for family information and immediately my result come on on college email in my class attend interview Six student and me and one girl passed in the interview my parents and I were very happy I got the directly position of senior Executive Engineer in Godrej company
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via LinkedIn and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. How do you design metro line for new station
  • Ans. 

    Designing a metro line for a new station involves planning routes, considering passenger flow, and ensuring connectivity.

    • Conduct a feasibility study to determine the need for a new station

    • Consider factors such as population density, traffic patterns, and potential future growth

    • Plan the route to optimize connectivity with existing stations and transportation hubs

    • Design the station layout to accommodate passenger flow an...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. How do you learn about our company
  • Q2. What should one do in tough times
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Sql related questions
Contribute & help others!
anonymous
You can choose to be anonymous

CBRE Interview FAQs

How many rounds are there in CBRE Associate Software Engineer interview?
CBRE interview process usually has 4 rounds. The most common rounds in the CBRE interview process are Resume Shortlist, Aptitude Test and Coding Test.

Recently Viewed

INTERVIEWS

Schlumberger

No Interviews

INTERVIEWS

SirionLabs

No Interviews

INTERVIEWS

MakeMyTrip

No Interviews

INTERVIEWS

Infogain

No Interviews

LIST OF COMPANIES

Dr Lal PathLabs

Locations

INTERVIEWS

Dr Lal PathLabs

No Interviews

INTERVIEWS

VDX.TV

No Interviews

INTERVIEWS

Dr Lal PathLabs

No Interviews

INTERVIEWS

Johnson Controls

No Interviews

INTERVIEWS

ZS Technologies

No Interviews

Tell us how to improve this page.

CBRE Associate Software Engineer Interview Process

based on 2 interviews

Interview experience

3.5
  
Good
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 352 Interviews
NoBroker Interview Questions
3.2
 • 233 Interviews
DLF Interview Questions
3.9
 • 74 Interviews
Colliers India Interview Questions
3.9
 • 63 Interviews
K Raheja Corp Interview Questions
4.3
 • 46 Interviews
Knight Frank Interview Questions
4.0
 • 44 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
View all
CBRE Associate Software Engineer Salary
based on 47 salaries
₹4 L/yr - ₹8 L/yr
At par with the average Associate Software Engineer Salary in India
View more details

CBRE Associate Software Engineer Reviews and Ratings

based on 6 reviews

4.3/5

Rating in categories

4.3

Skill development

4.5

Work-life balance

4.2

Salary

4.1

Job security

4.3

Company culture

3.3

Promotions

4.3

Work satisfaction

Explore 6 Reviews and Ratings
Assistant Manager
1.6k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Facility Executive
628 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Facility Manager
518 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Facility Manager
504 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
487 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare CBRE with

JLL

4.1
Compare

Colliers India

3.9
Compare

Knight Frank

4.0
Compare

Cushman & Wakefield

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent