Budgeting is the process of creating a financial plan for a project or organization.
It involves estimating the costs of various activities and resources required for the project.
It helps in allocating resources effectively and efficiently.
It also involves monitoring and controlling the expenses to ensure that they stay within the budget.
Budgeting is an important aspect of project management as it helps in achieving pro...
Mode of measurement codes are used to identify the method of measurement used for a particular project.
Mode of measurement codes are typically used in construction and engineering projects.
They are used to identify the type of measurement used, such as linear feet or cubic yards.
These codes are important for ensuring consistency and accuracy in project measurements.
Examples of mode of measurement codes include LF for l...
Mode measurement can be done using various methods depending on the type of work.
Shuttering can be measured using square feet or square meters.
Brick work can be measured using cubic feet or cubic meters.
Plaster can be measured using square feet or square meters.
Painting can be measured using square feet or square meters.
Measurement can also be done using laser distance meters or digital measuring tapes.
Accuracy and pre...
posted on 2 Feb 2022
I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 4 Jan 2025
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
Project management process involves initiating, planning, executing, monitoring, and closing a project.
Initiating: Define project scope, objectives, and stakeholders.
Planning: Create a detailed project plan, including timelines, resources, and budget.
Executing: Implement the project plan and manage resources effectively.
Monitoring: Track project progress, identify risks, and make necessary adjustments.
Closing: Finalize...
Risk management involves identifying, assessing, and prioritizing risks, as well as developing mitigation plans to minimize their impact.
Identify potential risks by conducting a thorough risk assessment
Assess the likelihood and impact of each risk on the project
Prioritize risks based on their severity and potential impact
Develop a mitigation plan for each identified risk, including strategies to minimize or eliminate t...
Long lead items can be tracked by creating a detailed schedule, monitoring progress regularly, and communicating with suppliers.
Create a detailed schedule outlining the delivery dates of long lead items
Regularly monitor the progress of long lead items to ensure they are on track
Communicate effectively with suppliers to address any delays or issues
Utilize project management software to track and manage long lead items
Safety is the practice of preventing accidents, injuries, and illnesses in the workplace to protect employees and assets.
Safety is important to ensure the well-being of employees and prevent accidents.
It helps in maintaining a positive work environment and employee morale.
Safety measures can reduce costs associated with accidents and injuries.
Compliance with safety regulations is essential to avoid legal issues and pen...
Pressure in fire hydrant pipe is determined by factors like water flow rate, pipe diameter, and elevation difference.
Pressure in fire hydrant pipe is directly related to the flow rate of water through the pipe.
The diameter of the pipe also affects the pressure, with larger diameter pipes resulting in lower pressure loss.
Elevation difference between the hydrant and the point of discharge can impact the pressure in the p...
NRC stands for National Register of Citizens.
NRC is a register containing names of all genuine Indian citizens in the state of Assam, India.
It was first prepared in 1951 and is now being updated to identify illegal immigrants.
The NRC process involves verifying the citizenship status of individuals based on documents like birth certificates, land records, etc.
posted on 25 Mar 2023
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
The area of projects and types of projects I have worked on vary greatly.
I have worked on projects in various industries including construction, healthcare, and technology.
Types of projects I have worked on include software development, building construction, and medical equipment installation.
I am adaptable and able to quickly learn about new industries and project types.
I have experience working on both small and lar
posted on 2 Feb 2022
I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
Baseline schedules should be updated regularly to reflect changes in project scope, timeline, and resources.
Baseline schedules should be updated at key project milestones or when significant changes occur.
Regular updates ensure that the schedule remains accurate and reflects the current status of the project.
Updates should be communicated to all stakeholders to keep them informed of any changes.
Examples of changes that...
Crashing of schedule is a technique used in project management to shorten the project duration by adding more resources.
Crashing involves adding more resources to critical path activities to reduce the overall project duration.
It is typically used when there is a need to meet a deadline or when there are financial incentives for early completion.
Crashing may increase project costs due to the additional resources requir...
I applied via Approached by Company and was interviewed in May 2023. There were 3 interview rounds.
Yes, activity control measures are put in place to ensure the safety of employees and prevent accidents.
Implementing proper training programs for employees on safety procedures
Regular inspections and audits to identify potential hazards
Enforcing the use of personal protective equipment (PPE)
Establishing clear protocols for reporting incidents and near misses
Implementing emergency response plans and drills
Monitoring and
Site hazards are potential sources of harm or danger present at a specific location.
Site hazards can include physical hazards such as uneven terrain, slippery surfaces, or exposed electrical wires.
Chemical hazards like toxic substances or flammable materials are also common on sites.
Biological hazards such as mold, bacteria, or viruses can pose risks to health.
Other hazards may include ergonomic risks from improper lif...
Work at height control measures involve identifying hazards, implementing safety protocols, providing training, and using appropriate equipment.
Identify potential hazards such as unstable surfaces, unprotected edges, and falling objects
Implement safety protocols like using guardrails, safety nets, and personal fall arrest systems
Provide training on proper use of equipment, emergency procedures, and hazard recognition
Us...
posted on 19 May 2021
I applied via Company Website and was interviewed before May 2020. There were 4 interview rounds.
based on 4 reviews
Rating in categories
Assistant Manager
1.6k
salaries
| ₹3.8 L/yr - ₹10.6 L/yr |
Facility Executive
637
salaries
| ₹2.2 L/yr - ₹6.3 L/yr |
Assistant Facility Manager
515
salaries
| ₹3.8 L/yr - ₹10.1 L/yr |
Facility Manager
490
salaries
| ₹5 L/yr - ₹14.4 L/yr |
Deputy Manager
480
salaries
| ₹4.6 L/yr - ₹13 L/yr |
JLL
Colliers India
Knight Frank
Cushman & Wakefield