Filter interviews by
I applied via Referral and was interviewed before Nov 2023. There was 1 interview round.
Construction process involves planning, designing, procurement, construction, and completion of a project.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating blueprints, obtaining permits, and selecting materials.
Procurement phase involves purchasing materials, hiring contractors, and scheduling deliveries.
Construction phase includes site preparation, fo...
Plastering is a construction procedure used to cover walls and ceilings with a smooth finish.
Prepare the surface by cleaning and dampening it
Apply a base coat of plaster using a trowel
Allow the base coat to dry before applying a finish coat
Smooth and level the finish coat with a float or trowel
Finish by sanding and painting if necessary
Block work procedure involves laying bricks or blocks in a specific pattern to create walls or structures.
Prepare the surface by cleaning and leveling it
Mix mortar according to specifications
Lay the first course of blocks ensuring they are level and plumb
Continue laying subsequent courses, staggering joints for strength
Use a spirit level and string lines for accuracy
Fill joints with mortar and strike off excess
Allow mo...
Tile work procedure involves preparation, layout, cutting, setting, grouting, and finishing.
Preparation of the surface by cleaning and leveling
Layout of tiles to ensure proper alignment and spacing
Cutting tiles to fit around edges and corners
Setting tiles using adhesive or mortar
Grouting to fill in gaps between tiles
Finishing by cleaning off excess grout and sealing the tiles
Waterproofing procedure involves applying materials to prevent water from penetrating a structure.
Inspect the area to identify any existing leaks or damage
Prepare the surface by cleaning and repairing any cracks or holes
Apply waterproofing materials such as membranes, coatings, or sealants
Ensure proper curing and drying time before exposing to water
Test the waterproofing by conducting a water test to check for leaks
False ceiling procedure involves installation of a secondary ceiling below the main ceiling to improve aesthetics, acoustics, and insulation.
Measure the area of the room to determine the amount of materials needed
Prepare the ceiling by cleaning and ensuring it is structurally sound
Install the framework for the false ceiling using metal channels or wooden battens
Attach the ceiling tiles or panels to the framework
Finish ...
Tests are conducted on concrete, soil, and other materials to ensure quality and durability.
Various tests are conducted on concrete to check compressive strength, workability, and durability.
Soil tests are done to determine its composition, moisture content, and bearing capacity.
Different materials like steel, asphalt, and aggregates are tested for their properties and quality.
Non-destructive testing methods like ultra...
The size of the concrete cube is typically 150x150x150 mm, the size of the slump cone is 100 mm, and the percentage of strength obtained varies for different curing periods.
Concrete cube size: 150x150x150 mm
Slump cone size: 100 mm
Percentage of strength obtained varies for 3, 7, 14, and 28 days
Example: Strength obtained at 28 days is typically around 90-95% of the design strength
The number of sample cubes for concrete for 100m^3 depends on the specifications and requirements of the project.
Number of sample cubes typically ranges from 3 to 6 for 100m^3 of concrete.
The number of sample cubes may also depend on the strength grade of the concrete being tested.
It is important to follow relevant standards and guidelines for sampling and testing concrete.
Consulting with a structural engineer or testi...
Top trending discussions
posted on 21 Dec 2024
QMS is adopted to ensure consistent quality, meet customer requirements, and improve processes.
Ensures consistent quality of products or services
Helps meet customer requirements and expectations
Improves processes and efficiency
Reduces risks and errors
Enhances customer satisfaction
Provides a framework for continuous improvement
Design mix procedure involves determining the proportions of materials to create a concrete mix with desired properties.
Identify the required strength and durability of the concrete
Select suitable materials such as cement, aggregates, and water
Calculate the proportions of each material based on mix design methods
Test the mix to ensure it meets specifications
Adjust the mix if necessary to achieve desired properties
posted on 6 Feb 2024
Grade of concrete refers to its strength and durability.
Grade of concrete is determined by its compressive strength.
It is denoted by a number followed by 'M' (e.g. M20, M25).
Higher grade concrete has higher strength and durability.
Different grades of concrete are used for different purposes.
For example, M20 grade is commonly used for residential construction.
Mix design of concrete involves determining the proportions of ingredients to achieve desired properties.
Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures in concrete.
It involves considering factors such as strength, workability, durability, and economy.
Various methods like the ACI method, British method, and DOE method can be used for mix design.
The mix design proces...
PWHT stands for Post Weld Heat Treatment, a process used to reduce residual stresses and improve the mechanical properties of welded joints.
PWHT involves heating the welded component to a specific temperature for a certain period of time, followed by controlled cooling.
The process helps to eliminate hydrogen cracking, improve toughness, and reduce distortion in the welded joint.
Common methods of PWHT include furnace he...
WQT range refers to the range of values for Water Quality Testing in a specific context.
WQT range can vary depending on the parameters being tested, such as pH, turbidity, dissolved oxygen, etc.
For example, the WQT range for pH in drinking water may be 6.5-8.5.
Monitoring and maintaining WQT range is crucial for ensuring safe and clean water supply.
Regular testing and analysis of water samples help in determining if the
LPT acceptance criteria ensure that the test results meet specified requirements.
Test results must meet specified requirements outlined in the acceptance criteria
Acceptance criteria should be clearly defined and documented
Criteria may include specific performance metrics or thresholds
Examples: minimum tensile strength, maximum elongation percentage
posted on 24 Sep 2023
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 29 Jul 2023
I applied via Company Website and was interviewed in Jun 2023. There were 6 interview rounds.
Meetings with the project managers and department head with the clients.
Site validation in specification knowledge and procedures for field work is essential for QA QC Engineers.
Understanding the specifications and requirements for each site is crucial
Following established procedures and protocols for field work
Ensuring that all work is in compliance with industry standards and regulations
Regularly updating knowledge on new technologies and best practices
Documenting all validation processe
posted on 31 Dec 2024
I applied via LinkedIn and was interviewed before Dec 2023. There were 3 interview rounds.
Part-1 consist of General aptitude & Part-2 consist of Technical question related to Civil Engineering
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Interview experience
based on 1 review
Rating in categories
Planning Manager
4
salaries
| ₹50 L/yr - ₹93 L/yr |
Planning Engineer
3
salaries
| ₹2 L/yr - ₹8 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group