Filter interviews by
I was interviewed in Aug 2023.
The number of lighting watt 1 circuits will depend on the specific requirements of the project.
The number of lighting watt 1 circuits needed will be determined by the lighting design plan.
Factors such as the size of the space, type of lighting fixtures, and desired lighting levels will influence the number of circuits.
For example, a large commercial building may require multiple lighting watt 1 circuits to adequately i...
posted on 11 Sep 2021
I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.
I am highly skilled in draughting and 3D modelling.
I have extensive experience in using CAD software for draughting and 3D modelling.
I am proficient in creating detailed technical drawings and 3D models.
I have successfully completed several projects involving complex draughting and 3D modelling tasks.
I am knowledgeable about industry standards and best practices in draughting and 3D modelling.
I continuously update my s...
posted on 23 Oct 2021
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 25 Mar 2022
I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.
posted on 2 May 2021
posted on 10 May 2022
I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.
Piping code and welder qualifications test
Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.
Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.
Both piping code and welder qualifications test are important in ensu...
posted on 6 Dec 2017
Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.
Optimize processes to eliminate inefficiencies and reduce wasted time
Utilize technology tools to automate repetitive tasks and streamline workflows
Delegate tasks to team members to distribute workload and free up time for higher priority tasks
Set clear priorities and focus on important tasks to avoid wasting
posted on 14 Jul 2017
I was interviewed before Jul 2016.
posted on 22 Jul 2021
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
The question is incomplete and does not make sense.
The question is missing important information.
It is unclear what the question is asking for.
There is no context provided for the question.
Without more information, it is impossible to answer the question.
The M-5 to M-25 ratio is a measure used in civil engineering to determine the strength of concrete mixtures.
The M-5 to M-25 ratio refers to the ratio of cement, sand, and aggregate in a concrete mixture.
The ratio indicates the compressive strength of the concrete after 28 days of curing.
For example, an M-20 concrete mix has a ratio of 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate by volume.
T...
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Senior Engineer
148
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
96
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
63
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Punj Lloyd
Simplex Infrastructures
Nagarjuna Construction Company