I applied via Company Website and was interviewed in Aug 2023. There was 1 interview round.
IS code used in estimate is IS 1200: Part 1
IS 1200: Part 1 is the Indian Standard code used for measurement and estimation of building works
It provides guidelines for the preparation of detailed estimates, measurement of works, and calculation of quantities
The code covers various aspects such as earthwork, concrete work, brickwork, plastering, flooring, etc.
It helps in ensuring uniformity and accuracy in estimating the
The minimum thickness of a slab depends on various factors such as the load it needs to support, the type of material used, and the span of the slab.
The minimum thickness of a slab is determined by the structural engineer based on the design requirements and load calculations.
For residential buildings, the minimum slab thickness is typically around 4 inches (10 cm) for interior slabs and 6 inches (15 cm) for exterior s...
The density of steel is approximately 7.85 grams per cubic centimeter.
The density of steel is a measure of how much mass is contained in a given volume.
It is commonly expressed in grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).
The density of steel can vary depending on the specific type and composition of the steel.
For example, the density of carbon steel is typically around 7.85 g/cm³.
Stainles...
Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.
It is the length of the bar that is embedded in the concrete
It ensures proper bond between the reinforcement and the concrete
Development length depends on factors like bar diameter, concrete strength, and bond strength
It is calculated using empirical formulas or specified in design codes
E...
Top trending discussions
posted on 5 Feb 2024
I applied via Company Website and was interviewed in Jan 2024. There were 2 interview rounds.
Summary question and also some coding of alphabet
Rate analysis of variation items in contract involves calculating the cost impact of changes in scope or specifications.
Rate analysis involves determining the cost of materials, labor, and equipment for the variation items.
It helps in evaluating the impact of changes on the overall project budget.
Factors like quantity, rates, and specifications are considered in the analysis.
Examples of variation items include changes ...
Tax deduction in RA BILL
Tax deduction is applicable on certain items in a RA bill
The deduction amount varies based on the item and tax laws
Examples of items with tax deduction include TDS, GST, and service tax
Price escalation refers to the increase in the cost of goods or services over time.
It is a common phenomenon in the construction industry where the cost of materials and labor increases over time.
Price escalation can be caused by various factors such as inflation, changes in market demand and supply, and changes in government policies.
It is important for billing engineers to take price escalation into account when esti...
The volume of a trapezoidal shape can be calculated using its height and the lengths of its parallel sides.
The formula for calculating the volume of a trapezoidal shape is (1/2) x height x (length of parallel side 1 + length of parallel side 2)
The height is the perpendicular distance between the parallel sides
For example, if the trapezoidal shape has a height of 5 units, a length of parallel side 1 of 8 units, and a le...
Wastage for concrete and steel depends on various factors such as site conditions, workmanship, and design.
Wastage for concrete can range from 2% to 10% depending on the quality of workmanship and site conditions.
Wastage for steel can range from 2% to 5% depending on the design and fabrication process.
Factors such as improper handling, cutting, and bending can also contribute to wastage.
Proper planning and management c...
Variation for extra items is a common occurrence in construction projects.
Extra items may include additional work, materials, or changes in design.
The variation may be initiated by the client or due to unforeseen circumstances.
The billing engineer must accurately document and price the extra items.
The variation may require approval from the client and/or consultant before proceeding.
Examples of extra items include addi...
An account engineer manages financial accounts while a billing engineer handles billing and invoicing.
Account engineers manage financial accounts and ensure that all financial transactions are recorded accurately.
Billing engineers handle billing and invoicing processes, ensuring that customers are billed correctly and payments are received on time.
While both roles involve financial management, account engineers focus o...
posted on 8 May 2023
I applied via Campus Placement and was interviewed before May 2022. There were 3 interview rounds.
posted on 31 Mar 2021
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Jun 2021. There was 1 interview round.
I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.
The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.
Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process
Discussed the importance of reconciliation in ensuring accurate billing and payment
Described the process of rate analysis and how ...
posted on 16 Nov 2023
I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.
Gk , aptitude and technical
Billing is the process of generating invoices for goods or services provided.
Billing involves calculating costs, creating invoices, and sending them to customers.
It is important for tracking revenue and ensuring timely payment.
Examples of billing software include QuickBooks, FreshBooks, and Zoho Invoice.
based on 1 review
Rating in categories
Civil Site Engineer
8
salaries
| ₹1.1 L/yr - ₹4.6 L/yr |
Site Engineer
5
salaries
| ₹3 L/yr - ₹4.2 L/yr |
Senior Engineer
4
salaries
| ₹4.6 L/yr - ₹6.6 L/yr |
Accountant
4
salaries
| ₹2.5 L/yr - ₹4.4 L/yr |
Engineer
3
salaries
| ₹3 L/yr - ₹3 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures