I applied via Company Website and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Which IS code used in estimate
  • Ans. 

    IS code used in estimate is IS 1200: Part 1

    • IS 1200: Part 1 is the Indian Standard code used for measurement and estimation of building works

    • It provides guidelines for the preparation of detailed estimates, measurement of works, and calculation of quantities

    • The code covers various aspects such as earthwork, concrete work, brickwork, plastering, flooring, etc.

    • It helps in ensuring uniformity and accuracy in estimating the

  • Answered by AI
  • Q2. Minimum thickness of slab
  • Ans. 

    The minimum thickness of a slab depends on various factors such as the load it needs to support, the type of material used, and the span of the slab.

    • The minimum thickness of a slab is determined by the structural engineer based on the design requirements and load calculations.

    • For residential buildings, the minimum slab thickness is typically around 4 inches (10 cm) for interior slabs and 6 inches (15 cm) for exterior s...

  • Answered by AI
  • Q3. Density of steel
  • Ans. 

    The density of steel is approximately 7.85 grams per cubic centimeter.

    • The density of steel is a measure of how much mass is contained in a given volume.

    • It is commonly expressed in grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

    • The density of steel can vary depending on the specific type and composition of the steel.

    • For example, the density of carbon steel is typically around 7.85 g/cm³.

    • Stainles...

  • Answered by AI
  • Q4. What is the development length
  • Ans. 

    Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.

    • It is the length of the bar that is embedded in the concrete

    • It ensures proper bond between the reinforcement and the concrete

    • Development length depends on factors like bar diameter, concrete strength, and bond strength

    • It is calculated using empirical formulas or specified in design codes

    • E...

  • Answered by AI

Billing Engineer Interview Questions asked at other Companies

Q1. What is Escalation and what is the significance of this? What is the formula to determine Escalation.
View answer (9)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2018. There were 2 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What is Your Current Sallary.
  • Ans. 

    I am currently earning $60,000 per year.

    • My current salary is $60,000 per year.

    • I am satisfied with my current salary.

    • I believe my salary reflects my experience and qualifications.

  • Answered by AI
  • Q2. Expected salary
  • Q3. Negotiable sallary how much you negotiate.
  • Q4. Yourself Introduction.
  • Q5. About Your projects, experience and some technical question . I.e. procedure of work , productivity of workman and how to start your activities etc.

Interview Preparation Tips

You should be confident don't be nervous and Give your best.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before May 2017.

Interview Questionnaire 

4 Questions

  • Q1. Good discussion with accounts team
  • Q2. Having good discussion with team
  • Q3. Good discussion for salary and others
  • Q4. Good company for working
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Interview Questionnaire 

2 Questions

  • Q1. Type of pile , why we provide pile,pile dia , lvup vup svup type questions
  • Ans. 

    Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.

    • Types of piles include driven piles, bored piles, and screw piles.

    • Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.

    • The diameter of a pile is determined based on the load it needs to support and the soil conditions.

    • LVUP (Large...

  • Answered by AI
  • Q2. Mostly we use two types of pile (1) friction pile (2)end bearing pile

Interview Preparation Tips

Interview preparation tips for other job seekers - Please read MORTH AN

I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. *How many year experience do have
  • Q2. How long did you work in your previous company and what did you do?
  • Q3. What do you expect For your next job

Interview Preparation Tips

Interview preparation tips for other job seekers - This is MNC company, after sales service are a bit low,

Interview Questionnaire 

6 Questions

  • Q1. Percentage of steel in pile
  • Ans. 

    The percentage of steel in a pile varies depending on the type and design of the pile.

    • The percentage of steel in a pile can range from 0% to over 90%.

    • The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.

    • Steel piles typically have a higher percentage of steel than other types of piles.

    • The percentage of steel in a pile can also affect its

  • Answered by AI
  • Q2. Pile built-up above cut off level as per IS code
  • Ans. 

    Pile built-up above cut off level as per IS code

    • IS code specifies the maximum allowable pile length above cut off level

    • Pile length above cut off level should not exceed 3 times the pile diameter

    • Built-up pile above cut off level can cause structural instability and failure

  • Answered by AI
  • Q3. Pile vertical tolerance as per IS code
  • Ans. 

    Vertical tolerance for piles as per IS code

    • As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm

    • This tolerance is applicable for both driven and cast-in-situ piles

    • The tolerance is measured at the top of the pile and at intervals of 3m along the length

    • If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken

  • Answered by AI
  • Q4. Pile concrete consumption +- tolerance
  • Ans. 

    Pile concrete consumption tolerance depends on various factors.

    • Pile diameter and length

    • Concrete mix design

    • Placement method

    • Quality control measures

    • Environmental conditions

    • Tolerance typically ranges from 5-10% of estimated consumption

    • Regular monitoring and adjustment of concrete consumption is necessary

  • Answered by AI
  • Q5. Unit weight of steel
  • Ans. 

    Unit weight of steel is 7850 kg/m³

    • The unit weight of steel is the weight of a specific volume of steel

    • It is measured in kilograms per cubic meter (kg/m³)

    • The unit weight of steel is 7850 kg/m³

    • This value may vary slightly depending on the composition and manufacturing process of the steel

  • Answered by AI
  • Q6. Contractor MB related

I applied via Naukri.com and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How much cement used for making 1m³ concrete
  • Ans. 

    The amount of cement used for making 1m³ of concrete varies depending on the desired strength and type of concrete.

    • The cement content typically ranges from 300 to 400 kg/m³ for general-purpose concrete.

    • For high-strength concrete, the cement content can be as high as 500 kg/m³ or more.

    • The water-cement ratio also affects the amount of cement required.

    • Admixtures and additives may be used to modify the properties of the co...

  • Answered by AI
  • Q2. 360 kg
  • Q3. How much steel used for 1m³ concreting
  • Ans. 

    The amount of steel used for 1m³ concreting varies depending on the type of concrete and the structural requirements.

    • The steel used in concrete is typically in the form of reinforcing bars (rebar) or welded wire mesh.

    • The amount of steel required for 1m³ of concrete depends on the structural requirements and the type of concrete being used.

    • For example, a standard reinforced concrete slab may require 70-100 kg of steel p...

  • Answered by AI
  • Q4. This answer given by a formula & some thumbrules of this answer

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic knowledge is the best knowledge.....interviewer asked so much questions to ask but I'm ready to give his answers .It lasted for about 30 minutes.Luckily I was able to answer most of the questions correctly. I tried to give my best. My advice is to stay calm & should apply presence of mind.

Interview Questionnaire 

11 Questions

  • Q1. Structural welding codes, Bridge welding codes
  • Q2. Process piping works
  • Ans. 

    Process piping works involve the installation, inspection, and maintenance of pipes used in industrial processes.

    • Process piping works include the design, fabrication, and installation of pipes for conveying fluids or gases in industrial settings.

    • QA QC engineers ensure that the piping systems meet the required standards and specifications.

    • Inspection and testing of process piping is done to check for leaks, pressure, and...

  • Answered by AI
  • Q3. Bolts tightening procedure
  • Ans. 

    Bolts tightening procedure involves following a specific torque value and sequence to ensure proper fastening of bolts.

    • Check the torque value specified in the design or manual

    • Use a torque wrench to tighten the bolts to the specified value

    • Tighten the bolts in a specific sequence to ensure even distribution of load

    • Recheck the torque value after tightening all bolts

    • Record the torque value and sequence for future reference

  • Answered by AI
  • Q4. Bolts testing and torqueing sequences.
  • Q5. Hydrotest and pneumatic test for piping
  • Ans. 

    Hydrotest and pneumatic test are methods used to test the integrity of piping systems.

    • Hydrotest involves filling the piping system with water and pressurizing it to a specified level for a set duration.

    • Pneumatic test involves filling the piping system with compressed air or nitrogen and pressurizing it to a specified level for a set duration.

    • Both tests are used to ensure that the piping system can withstand the expecte...

  • Answered by AI
  • Q6. Able to refer codes and procedures.
  • Q7. Painting knowledge
  • Q8. Able to repair painted surface area.
  • Q9. Clients and inspection agency
  • Q10. Clients faced interviews.
  • Q11. Job training

Interview Questionnaire 

6 Questions

  • Q1. Tell me about yourself
  • Q2. What is your current role and responsibilities.
  • Q3. How you follow your dwm.
  • Ans. 

    I follow my dwm by regularly reviewing and updating my work plan.

    • I create a detailed work plan at the beginning of each project

    • I regularly review my progress and adjust my plan as needed

    • I prioritize tasks based on their importance and urgency

    • I communicate with my team to ensure we are all on the same page

    • I track my time and make adjustments to my schedule as needed

  • Answered by AI
  • Q4. What is 7 qc and core tools ...
  • Ans. 

    7 QC and Core Tools are quality control methodologies used in manufacturing and service industries.

    • 7 QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.

    • Core tools include APQP, PPAP, FMEA, MSA, and SPC.

    • These tools help in identifying and solving quality-related issues, improving processes, and reducing defects.

    • They are widely used in industries...

  • Answered by AI
  • Q5. What u Know about quality management system.
  • Ans. 

    Quality management system is a set of policies, processes, and procedures required for planning and execution of quality control.

    • It ensures that products or services meet customer requirements and expectations.

    • It involves continuous improvement and monitoring of processes.

    • ISO 9001 is a widely recognized standard for quality management systems.

    • It includes activities such as quality planning, quality control, and quality...

  • Answered by AI
  • Q6. Reason for job change

Electrical OHE Engineer Interview Questions & Answers

KEC International user image Mahesh Meena

posted on 9 Sep 2020

I applied via Company Website and was interviewed in Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

8 Questions

  • Q1. Da eraction. Bracket
  • Q2. Earth eraction bracket eraction
  • Q3. Goyrod eraction
  • Q4. Bracket adjustment
  • Q5. Torlly chaking
  • Q6. Mast eraction
  • Q7. Acc wair
  • Q8. Conterwate

Interview Preparation Tips

Interview preparation tips for other job seekers - Da bracket goyrod counterwate erection

Buildwell Construction Interview FAQs

How many rounds are there in Buildwell Construction interview?
Buildwell Construction interview process usually has 1 rounds. The most common rounds in the Buildwell Construction interview process are Technical.
What are the top questions asked in Buildwell Construction interview?

Some of the top questions asked at the Buildwell Construction interview -

  1. Which IS code used in estim...read more
  2. What is the development len...read more
  3. Minimum thickness of s...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Buildwell Construction interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 691 Interviews
Tata Projects Interview Questions
4.3
 • 398 Interviews
KEC International Interview Questions
4.1
 • 286 Interviews
Tata Technologies Interview Questions
3.7
 • 247 Interviews
TCE Interview Questions
3.8
 • 239 Interviews
View all

Buildwell Construction Reviews and Ratings

based on 9 reviews

4.5/5

Rating in categories

4.5

Skill development

3.9

Work-Life balance

3.9

Salary & Benefits

3.8

Job Security

3.9

Company culture

3.9

Promotions/Appraisal

3.9

Work Satisfaction

Explore 9 Reviews and Ratings
Civil Site Engineer
8 salaries
unlock blur

₹1.1 L/yr - ₹4.6 L/yr

Site Engineer
5 salaries
unlock blur

₹3 L/yr - ₹4.2 L/yr

Senior Engineer
4 salaries
unlock blur

₹4.6 L/yr - ₹6.6 L/yr

Accountant
4 salaries
unlock blur

₹2.5 L/yr - ₹4.4 L/yr

Engineer
3 salaries
unlock blur

₹3 L/yr - ₹3 L/yr

Explore more salaries
Compare Buildwell Construction with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.3
Compare

Megha Engineering & Infrastructures

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview