Filter interviews by
I applied via Company Website and was interviewed before Aug 2023. There were 2 interview rounds.
I have a proven track record of improving quality standards, reducing defects, and implementing efficient processes.
I have X years of experience in quality management roles
I have successfully implemented quality improvement initiatives at my previous company, resulting in a X% decrease in defects
I am skilled in data analysis and root cause analysis, allowing me to identify and address quality issues effectively
I handle criticism by listening attentively, reflecting on the feedback, and using it as an opportunity for growth.
Listen actively to understand the criticism
Reflect on the feedback to see if there is validity to it
Use criticism as a learning opportunity to improve
Stay calm and professional in response to criticism
Seek clarification if needed to fully understand the criticism
I have been interested in quality for over 10 years, starting with my education in quality management.
Studied quality management in college
Worked on quality improvement projects in previous roles
Attended seminars and workshops on quality assurance
I am motivated by the opportunity to improve quality processes and drive continuous improvement in the organization.
Passion for ensuring products/services meet high quality standards
Desire to implement quality management systems and processes
Drive to lead teams in achieving quality objectives
Excitement for problem-solving and root cause analysis
Goal of contributing to overall business success through quality excellence
Top trending discussions
I applied via Campus Placement and was interviewed before Sep 2022. There were 5 interview rounds.
Reasoning and general awareness written exam,about 30 percent were out
Topic discussed for atleast 15 minutes ,about 20 percent were selected from it
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
I applied via Campus Placement
Predicted month end target based on 35% work completed in first 10 days.
Assuming the employee works at a consistent pace throughout the month
Calculate the remaining work as 65% of the total work
Divide the remaining work by the remaining days in the month
Add the result to the 35% already completed
This gives the predicted month end target
For example, if the total work is 100 units, and 35 units are completed in the first...
I applied via Walk-in and was interviewed in May 2021. There were 3 interview rounds.
I appeared for an interview before Jun 2016.
Yesterday was a productive day filled with meetings and project work.
Attended a team meeting in the morning
Worked on a project proposal in the afternoon
Had a networking event in the evening
The letters on a keyboard are placed in a specific layout called QWERTY, which was designed to prevent typewriter jams.
The QWERTY layout was developed by Christopher Sholes in 1873 for typewriters.
The layout was designed to separate commonly used letters to reduce the likelihood of jamming.
The arrangement of letters was based on the frequency of their use in the English language.
The QWERTY layout became popular and was
An air conditioner is a device that cools and dehumidifies the air in a room or building.
Air conditioners work by removing heat and moisture from the air.
They use a refrigeration cycle to cool the air.
Air conditioners can be used for both residential and commercial purposes.
They come in different types such as window units, split systems, and central air conditioning systems.
Air conditioners improve indoor air quality ...
I appeared for an interview in Aug 2017.
I applied via Recruitment Consultant and was interviewed before Apr 2020. There were 3 interview rounds.
Quality control is a process that ensures products or services meet specified requirements and standards.
Quality control involves monitoring and inspecting products or services to identify defects or deviations from standards.
It includes setting quality standards, establishing inspection procedures, and conducting tests to ensure compliance.
Quality control aims to prevent defects, improve customer satisfaction, and mai...
based on 1 interview
Interview experience
Assistant Manager
125
salaries
| ₹9 L/yr - ₹21 L/yr |
Senior Engineer
82
salaries
| ₹6.5 L/yr - ₹12 L/yr |
Engineer
61
salaries
| ₹3.6 L/yr - ₹8.8 L/yr |
Deputy Manager
55
salaries
| ₹12 L/yr - ₹25 L/yr |
Area Sales Manager
53
salaries
| ₹7.2 L/yr - ₹23.2 L/yr |
Vivo
OPPO
Dell
LG Electronics