I applied via Campus Placement and was interviewed in Jul 2024. There were 2 interview rounds.
Yes, SCADA stands for Supervisory Control and Data Acquisition. It is a system used for monitoring and controlling industrial processes.
SCADA systems are used in various industries such as power plants, water treatment facilities, and manufacturing plants.
They allow operators to remotely monitor and control processes in real-time.
SCADA systems typically consist of sensors, controllers, and a human-machine interface (HM...
Types of losses in power distribution include resistance losses, core losses, and dielectric losses.
Resistance losses occur due to the resistance of the conductors, leading to heat dissipation.
Core losses occur in transformers due to hysteresis and eddy current losses.
Dielectric losses occur in insulating materials due to polarization and leakage currents.
Power distribution system is a network of electrical components used to deliver electricity from the generation source to the end users.
Power generation at a central location
Transmission of electricity through high voltage lines
Distribution through substations and transformers
Delivery to end users via distribution lines
Utilization by consumers for various applications
I applied via Walk-in and was interviewed in Nov 2024. There were 2 interview rounds.
Dss co ordinator in buisness
7 years in this company
I applied via Campus Placement and was interviewed in Sep 2023. There was 1 interview round.
I applied via Campus Placement and was interviewed in Jun 2023. There were 4 interview rounds.
Firstly aptitude test consisting of common questions on work and time, simple & compound interest etc.
It's a general IT questions not limited to DBMS, OS, and networking but cloud computing basics, saas iaas definations, and the programming.
Bses Rajdhani Power interview questions for popular designations
Types of transformers include power transformers, distribution transformers, autotransformers, isolation transformers, and instrument transformers.
Power transformers are used in high voltage transmission systems to step up or step down voltage levels.
Distribution transformers are used to supply power to residential and commercial areas.
Autotransformers have a single winding and are used for voltage regulation.
Isolation...
I appeared for an interview in Aug 2023.
I applied via Campus Placement and was interviewed before Apr 2023. There was 1 interview round.
I appeared for an interview before Mar 2024, where I was asked the following questions.
I am pursuing an internship to gain practical experience, enhance my skills, and contribute to real-world power distribution projects.
Gain hands-on experience in power distribution systems, such as transformers and circuit breakers.
Learn about industry standards and regulations, like IEEE and NEC, through practical application.
Collaborate with experienced engineers on projects, enhancing teamwork and communication skil...
I applied via Campus Placement and was interviewed before Sep 2022. There were 3 interview rounds.
You should have knowledge of ratio/Boat and Stream/Train Related Questions and others Quantitive aptitude.
Power factor is a measure of how effectively electrical power is being used. A meggar is a type of insulation resistance tester. Different types of meters include analog and digital meters.
Power factor is the ratio of real power to apparent power in an electrical system.
A meggar is used to measure the insulation resistance of electrical equipment.
Types of meters include analog meters, digital meters, and smart meters.
U...
Top trending discussions
Some of the top questions asked at the Bses Rajdhani Power interview for freshers -
The duration of Bses Rajdhani Power interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 8 interviews
Interview experience
based on 600 reviews
Rating in categories
4-5 Yrs
Not Disclosed
5-7 Yrs
Not Disclosed
Assistant Manager
190
salaries
| ₹3 L/yr - ₹11.2 L/yr |
Electrical Engineer
169
salaries
| ₹1.2 L/yr - ₹8.2 L/yr |
Senior Manager
119
salaries
| ₹8.6 L/yr - ₹21 L/yr |
Engineer
102
salaries
| ₹3.2 L/yr - ₹9.5 L/yr |
Manager
98
salaries
| ₹5.5 L/yr - ₹14.2 L/yr |
Suzlon Group
Adani Group
NTPC
Tata Power