i
Brick&Bolt
Filter interviews by
QC fundamentals in footing concrete ensure quality and durability of the structure.
Proper mix design to achieve desired strength and durability
Thorough testing of materials before and during construction
Proper placement and compaction of concrete to avoid voids and weak spots
Regular inspection and monitoring of curing process
Adherence to relevant codes and standards for construction
Common plumbing materials include PVC pipes, copper pipes, PEX tubing, fittings, and valves.
PVC pipes
Copper pipes
PEX tubing
Fittings
Valves
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.
Friction loss due to pipe roughness
Elevation change between inlet and outlet
Velocity head due to fluid velocity
Losses from fittings like elbows, tees, and valves
AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.
Filters - to remove dust and particles from the air
Coils - for heating or cooling the air
Fans - to circulate the air
Dampers - to control the flow of air
Humidifiers/dehumidifiers - to adjust the humidity levels
Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.
Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.
They are more energy efficient compared to other types of blowers.
Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.
Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.
Primary pump is the main pump in a system, while secondary pump is a backup pump.
Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.
Examples: In a heating system, the primary pump circulates hot water throug...
AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.
AHU valve connection is essential for regulating the flow of air in an air handling unit.
Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.
Properly connected valves ensure efficient operation of the AHU system.
Examples of AHU valves include damper val
Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.
Flow rate: Determine the required flow rate of chilled water in the system.
Pressure drop: Calculate the pressure drop to ensure efficient operation.
Material: Select appropriate pipe material based on temperature and pressure requirements.
Insulation: Insulate the pipes to prevent heat gain or loss.
System desi...
The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.
Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.
The connection may also include electrical wiring for power supply and control signals.
Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system
posted on 7 May 2024
I applied via LinkedIn and was interviewed in Apr 2024. There were 3 interview rounds.
posted on 28 Dec 2023
I applied via Approached by Company and was interviewed in Jul 2023. There were 4 interview rounds.
The current market labour rate and material price can vary depending on location, demand, and supply.
Labour rates can be influenced by factors such as skill level, experience, and union agreements.
Material prices can fluctuate due to changes in raw material costs, transportation expenses, and market demand.
It is important to regularly monitor market trends and industry news to stay informed about labour rates and mater
posted on 22 Nov 2022
Details about work responsibilities and Work experience improvement
I have achieved significant milestones in my career as a Project Engineer.
Successfully completed a complex construction project within the given timeline and budget.
Implemented innovative strategies to improve project efficiency and reduce costs.
Received recognition for outstanding problem-solving skills and ability to handle challenging situations.
Led a team of engineers and technicians to successfully deliver multipl...
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
The project lifecycle is the series of phases a project goes through from initiation to completion.
Initiation: Define project goals, scope, and stakeholders
Planning: Create a detailed project plan, schedule, and budget
Execution: Implement the project plan and deliver the project
Monitoring and Controlling: Track progress, manage changes, and ensure quality
Closing: Finalize all project activities and hand off deliverable
Model reviews typically include checking for accuracy, completeness, consistency, and compliance with standards.
Checking accuracy of dimensions and specifications
Ensuring completeness of all required components and features
Verifying consistency in design and documentation
Confirming compliance with industry standards and regulations
The typical deliverables of a project engineer include design drawings, technical specifications, project schedules, cost estimates, and progress reports.
Design drawings: detailed plans and schematics for construction or manufacturing
Technical specifications: detailed requirements for materials, equipment, and processes
Project schedules: timelines for completing tasks and milestones
Cost estimates: budget projections fo...
I applied via Referral and was interviewed in May 2022. There was 1 interview round.
posted on 19 Dec 2023
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
The density of cement is around 1440 kg/m³.
Density of cement is the mass per unit volume of cement.
It is measured in kg/m³ or g/cm³.
The density of cement varies depending on the type of cement used.
For example, the density of Portland cement is around 1440 kg/m³.
The density of lightweight cement is around 1000 kg/m³.
based on 1 interview
Interview experience
Site Engineer
33
salaries
| ₹3 L/yr - ₹5.2 L/yr |
Project Manager
28
salaries
| ₹4 L/yr - ₹7.5 L/yr |
Sales Manager
26
salaries
| ₹6 L/yr - ₹10.5 L/yr |
Technical Consultant
23
salaries
| ₹6 L/yr - ₹9 L/yr |
Civil Site Engineer
19
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
LivSpace
Houzz
Urban Company
HomeLane