i
Brakes India
Filter interviews by
Clear (1)
Our plant has a lean design with emphasis on efficiency and safety.
Our plant layout is optimized for smooth flow of materials and minimal waste.
We have implemented 5S principles to ensure a clean and organized workplace.
Safety is a top priority, with clear markings, safety equipment, and regular training.
We regularly review and improve our design to stay competitive and meet customer needs.
The dripping time in our process is approximately 5-10 minutes.
The dripping time varies depending on the product being manufactured.
We have set a standard range of 5-10 minutes for dripping time.
We regularly monitor the dripping time to ensure it is within the set range.
If the dripping time exceeds the set range, we investigate and make necessary adjustments.
The dripping time is an important factor in ensuring the qual
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jul 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There was 1 interview round.
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Jun 2023. There was 1 interview round.
What are the projects done by you in your current company
I applied via Naukri.com and was interviewed before Jun 2021. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 4 interview rounds.
Trainee
273
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
222
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
201
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
175
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Inspector
142
salaries
| ₹0 L/yr - ₹0 L/yr |
Bosch
TVS Motor
Mahindra & Mahindra
Tata Motors