Filter interviews by
Be the first one to contribute and help others!
posted on 26 Nov 2024
General knowledge questions
posted on 16 Dec 2023
I applied via LinkedIn and was interviewed in Nov 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
I have experience parallelizing transformers by splitting them across multiple devices to minimize latency.
I have utilized frameworks like TensorFlow and PyTorch to parallelize transformers.
I approach splitting transformers by dividing the input data into chunks and distributing them across devices.
I optimize communication overhead by minimizing data transfer between devices.
I leverage techniques like data parallelism ...
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
Joins are used to combine rows from two or more tables based on a related column between them.
Types of joins include INNER JOIN, LEFT JOIN, RIGHT JOIN, and FULL JOIN.
INNER JOIN returns rows when there is at least one match in both tables.
LEFT JOIN returns all rows from the left table and the matched rows from the right table.
RIGHT JOIN returns all rows from the right table and the matched rows from the left table.
FULL ...
posted on 15 May 2024
Supply chain management
Machines have various functions and important parts that work together to perform specific tasks efficiently.
Basic functions include processing, moving, cutting, shaping, and assembling materials
Important parts may include motors, gears, sensors, controllers, and actuators
Examples: CNC machines process materials with precision, conveyor belts move items along a production line
Basic functions in Excel include data entry, formatting, calculations, and data analysis.
Data entry: Entering text, numbers, and formulas into cells.
Formatting: Changing font styles, colors, and cell alignment.
Calculations: Using formulas for addition, subtraction, multiplication, and division.
Data analysis: Sorting, filtering, and creating charts to analyze data.
Functions: Using built-in functions like SUM, AVERAGE, a
Proper Excel sheets can be made by organizing data, using formulas, formatting cells, and creating charts.
Organize data into rows and columns for easy readability
Use formulas to perform calculations and automate tasks
Format cells for better presentation and to highlight important information
Create charts to visualize data and trends
Technical issues in the field during sales include network connectivity problems, software glitches, hardware malfunctions, and data security breaches.
Network connectivity issues leading to inability to process transactions
Software glitches causing delays in generating invoices or processing orders
Hardware malfunctions such as POS system failures or printer issues
Data security breaches resulting in loss of customer inf
posted on 19 Sep 2024
There are mainly four grades of bitumen commonly used in construction: VG-10, VG-20, VG-30, and VG-40.
VG-10: Suitable for low-traffic roads
VG-20: Suitable for medium-traffic roads
VG-30: Suitable for high-traffic roads
VG-40: Suitable for heavy-duty traffic areas like airports and container terminals
The compressive strength of cement mortar cube at 3 days is typically around 20-25 MPa.
Compressive strength of cement mortar cube is an important parameter to assess its quality and durability
The strength of cement mortar increases with age, so 3 days is an early testing point
Typical compressive strength values for cement mortar cubes at 3 days range from 20-25 MPa
I applied via Walk-in
Shutting down a process involves terminating a program or application running on a computer system.
Use task manager or command line to end the process
Ensure all unsaved work is saved before shutting down
Consider any dependencies or impact on other processes
posted on 26 Sep 2024
Overall equipment effectiveness (OEE) is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying availability, performance, and quality rates.
It helps identify areas for improvement in production processes.
Example: If a machine has an availability of 90%, performance of 95%, and quality of 98%, the OEE would be 83.7%.
posted on 6 Jan 2024
I applied via Company Website and was interviewed in Dec 2023. There were 3 interview rounds.
Any problem discussion new project implementation
The worker should plan their work method by considering the tasks at hand, resources available, safety measures, and efficiency.
Identify the tasks that need to be completed
Allocate resources such as tools and materials
Follow safety protocols to prevent accidents
Plan the sequence of tasks for optimal efficiency
Problem discussion new project implementation
based on 3 reviews
Rating in categories
Architect
4
salaries
| ₹2.8 L/yr - ₹4 L/yr |
TriGeo Technologies
Balaji Enterprises
Jayasree Techno Solutions
Builtwell Solutions