Filter interviews by
Planning of raw material and BOP parts is crucial for efficient procurement and production.
Forecasting demand and estimating required quantities
Identifying reliable suppliers and negotiating contracts
Ensuring timely delivery and quality control
Maintaining inventory levels and optimizing storage space
Collaborating with production and engineering teams to ensure compatibility
Monitoring market trends and adjusting strateg
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
MHR is the rate calculated by dividing the total overhead costs by the total machine hours. Costing norms refer to the standard costs set for different activities.
MHR is calculated as Total Overhead Costs / Total Machine Hours
Costing norms are predetermined standards for costs of different activities
MHR helps in determining the cost of using machines for production
Costing norms help in setting benchmarks for cost contr
Major defects in plastic parts and their countermeasures
Major defects in plastic parts include warping, sink marks, flash, and short shots
Countermeasures for warping include adjusting mold temperature and cooling time
Sink marks can be reduced by increasing injection pressure and temperature
Flash can be prevented by optimizing clamping force and using proper mold design
Short shots can be avoided by ensuring proper mater
Nothing all the questions are same
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 3 interview rounds.
Costing of sheet metal and aluminium involves various factors such as material cost, labor cost, tooling cost, and overhead cost.
Material cost is the cost of raw material used in manufacturing the product.
Labor cost includes the cost of wages, benefits, and other expenses related to the workforce.
Tooling cost includes the cost of tools and equipment used in the manufacturing process.
Overhead cost includes the cost of u...
posted on 13 Aug 2023
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2022. There were 2 interview rounds.
P2P cycle stands for Procure to Pay cycle, which is the process of obtaining goods or services from a supplier and paying for them.
P2P cycle involves requisitioning, purchasing, receiving, and paying for goods or services.
It starts with creating a purchase requisition, followed by supplier selection and purchase order creation.
Goods or services are then received, inspected, and accepted.
Finally, invoices are matched wi...
Yes, I am proficient in Excel and Outlook. I also have experience with other softwares.
Proficient in Excel for data analysis and reporting
Skilled in Outlook for communication and scheduling
Familiar with software like SAP, AutoCAD, and SolidWorks
Experience with CRM systems like Salesforce
posted on 22 Feb 2022
posted on 10 Feb 2022
I applied via Job Fair and was interviewed before Feb 2021. There were 2 interview rounds.
5S is a methodology for organizing a workplace, especially a shared workplace, to improve efficiency and effectiveness by eliminating waste.
Sort - separate needed tools, parts, and instructions from unneeded materials
Set in order - neatly arrange and identify parts and tools for ease of use
Shine - clean and inspect work area and equipment regularly
Standardize - establish schedules and methods for maintaining the workpl...
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM involves all employees in the maintenance process
Focuses on preventing breakdowns and improving overall equipment efficiency
Includes activities such as cleaning, inspection, lubrication, and training of operators
Example: Implementing TPM can lead to reduced downtime and increased productivi
I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 3 interview rounds.
Assistant Manager
57
salaries
| ₹4 L/yr - ₹7.5 L/yr |
Senior Engineer
50
salaries
| ₹3.1 L/yr - ₹6.8 L/yr |
Production Engineer
40
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Quality Engineer
34
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Engineer
31
salaries
| ₹2.2 L/yr - ₹4.3 L/yr |
Ag Industries
Toyoda Gosei Minda
Global Autotech
Ralson Tyres Limited