Upload Button Icon Add office photos

Filter interviews by

B M Construction Co Interview Questions, Process, and Tips for Experienced

Updated 8 May 2024

B M Construction Co Interview Experiences for Experienced

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - One-on-one 

(10 Questions)

  • Q1. Tell me about yourself.
  • Q2. Explain your previous experience and how your experience align with this job?
  • Q3. How may machinery you have handled? List out.
  • Ans. 

    I have handled a wide range of machinery including CNC machines, 3D printers, industrial robots, and hydraulic systems.

    • CNC machines

    • 3D printers

    • Industrial robots

    • Hydraulic systems

  • Answered by AI
  • Q4. What is hydraulic system and their schematic diagram?
  • Ans. 

    Hydraulic systems use fluid to transmit power and are commonly used in various mechanical applications.

    • Hydraulic systems use a fluid (usually oil) to transmit power.

    • They consist of a hydraulic pump, valves, cylinders, and hydraulic fluid.

    • Schematic diagrams show the flow of hydraulic fluid and components in the system.

    • Examples of hydraulic systems include hydraulic brakes in cars and hydraulic lifts in construction equi

  • Answered by AI
  • Q5. How hydraulic system is different with pneumatic system?
  • Ans. 

    Hydraulic systems use liquid to transmit power while pneumatic systems use gas.

    • Hydraulic systems use incompressible fluid (usually oil) while pneumatic systems use compressible gas (usually air)

    • Hydraulic systems can handle higher loads and pressures compared to pneumatic systems

    • Pneumatic systems are generally faster in operation compared to hydraulic systems

    • Hydraulic systems are more suitable for heavy-duty application...

  • Answered by AI
  • Q6. How you handle breakdown?
  • Ans. 

    I handle breakdowns by staying calm, assessing the situation, troubleshooting the issue, and implementing a solution.

    • Stay calm and composed to think clearly

    • Assess the situation to understand the root cause

    • Troubleshoot the issue systematically

    • Implement a solution efficiently

    • Document the breakdown and solution for future reference

  • Answered by AI
  • Q7. How you manage vendors and subcontractors?
  • Ans. 

    I manage vendors and subcontractors by establishing clear communication channels, setting expectations, monitoring progress, and resolving any issues promptly.

    • Establish clear communication channels with vendors and subcontractors

    • Set expectations regarding deliverables, timelines, and quality standards

    • Monitor progress regularly to ensure project milestones are being met

    • Resolve any issues or conflicts promptly to prevent...

  • Answered by AI
  • Q8. What is maintenance schedule?
  • Ans. 

    Maintenance schedule is a planned timetable for performing routine maintenance tasks on equipment or machinery.

    • Maintenance schedule outlines when specific maintenance tasks need to be performed

    • It helps in preventing breakdowns and ensuring optimal performance of equipment

    • Examples include regular oil changes for vehicles, annual HVAC system inspections, and monthly filter replacements

  • Answered by AI
  • Q9. Difference between engine oil, gear oil, axle oil and hydraulic oil and their grades?
  • Ans. 

    Engine oil, gear oil, axle oil, and hydraulic oil serve different purposes in a vehicle and have specific grades for optimal performance.

    • Engine oil is used to lubricate internal combustion engines and comes in different grades such as 5W-30 or 10W-40.

    • Gear oil is designed for transmissions, differentials, and transfer cases to reduce friction and wear. Common grades include 75W-90 or 80W-90.

    • Axle oil is specifically form...

  • Answered by AI
  • Q10. Major components of batching plant?
  • Ans. 

    Major components of a batching plant include aggregate bins, conveyor belts, mixers, cement silos, control panels, and water tanks.

    • Aggregate bins for storing different types of aggregates

    • Conveyor belts for transporting materials to the mixer

    • Mixers for mixing the aggregates with cement and water

    • Cement silos for storing cement

    • Control panels for controlling the batching process

    • Water tanks for storing water used in the mix

  • Answered by AI

Top B M Construction Co Senior Engineer Mechanical Interview Questions and Answers

Q1. What is hydraulic system and their schematic diagram?
View answer (1)

Senior Engineer Mechanical Interview Questions asked at other Companies

Q1. Few manufacturing process for sheet metal operations and when to use when in accordance to volume,lead time and cost balancing.
View answer (1)

Interview questions from similar companies

Interview Preparation Tips

Round: TECHNICAL ROUND TEST
Experience: A 45 mins round which consisted of 30 mins of core questions and 15 mins of data structures.  It was a mix of test on our knowledge .

Round: HR Interview
Experience: Most of the questions were based on general knowledge and many of them were from the resume provides by me

General Tips: It is always advisable to be prepared with certain set of general questions which make it easier to answer.
Skill Tips: Focus on your Study.. Revise the subject that you have studied at the time of Interview
Skills: Technical Skills
College Name: IIT MADRAS

Interview Preparation Tips

Round: Test
Experience: Questions were on Aptitude, English, Probability, Permutations andCombinations and Programming (C, C++). NO Group Discussion was held.Candidates were shortlisted on the basis of their test scores.

Round: Technical Interview
Experience: Total time of this round was 45 minutes.First 30 minutes, questions on core programming were asked and in the remaining 15 minutes questions were asked on data structures.

Round: HR Interview
Experience: This was a 5 minute round where questions were put up, some based on the resume and other were general questions.

Skills: Knowledge in MATLAB.
College Name: IIT MADRAS

I was interviewed before Jul 2016.

Interview Preparation Tips

Round: Group Discussion
Duration: 4 hours 5 minutes

Round: Test
Duration: 2 hours 5 minutes

I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About HT/LT,Motor/Feeder & Substation Errection & Commission.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Questions Are Asked.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.

I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical round - depends on your sector and manager . Else no technical questions. Ready to travel . Married or not . Over...

Interview Preparation Tips

Topics to prepare for TCE Senior Engineer interview:
  • Basic
Interview preparation tips for other job seekers - Check out on going projects of your stream, opportunities to learn and grow , do bit of Market survey with respect to salary, job responsibilities . And main important is your team .
All the best

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

B M Construction Co Interview FAQs

How many rounds are there in B M Construction Co interview for experienced candidates?
B M Construction Co interview process for experienced candidates usually has 1 rounds. The most common rounds in the B M Construction Co interview process for experienced candidates are One-on-one Round.
What are the top questions asked in B M Construction Co interview for experienced candidates?

Some of the top questions asked at the B M Construction Co interview for experienced candidates -

  1. What is hydraulic system and their schematic diagr...read more
  2. How hydraulic system is different with pneumatic syst...read more
  3. Difference between engine oil, gear oil, axle oil and hydraulic oil and their g...read more

Tell us how to improve this page.

B M Construction Co Interview Process for Experienced

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.6
 • 258 Interviews
TCE Interview Questions
3.8
 • 248 Interviews
Saint-Gobain Interview Questions
4.0
 • 172 Interviews
AECOM Interview Questions
4.2
 • 115 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
Worley Interview Questions
4.1
 • 110 Interviews
View all

B M Construction Co Reviews and Ratings

based on 11 reviews

4.5/5

Rating in categories

4.4

Skill development

4.6

Work-life balance

4.4

Salary

4.3

Job security

4.4

Company culture

4.3

Promotions

4.2

Work satisfaction

Explore 11 Reviews and Ratings
Site Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Accounts Manager
3 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
3 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Land Surveyor
3 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare B M Construction Co with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview