I applied via Company Website and was interviewed in Aug 2021. There was 1 interview round.
The company's future planning involves expanding its services and increasing its customer base.
The company plans to invest in new technology to improve its services.
It aims to expand its operations to new regions and countries.
The company plans to increase its workforce to meet the growing demand for its services.
It also plans to focus on customer satisfaction and retention by providing quality services.
The company is ...
In the next 5 years, I aim to enhance my skills, take on leadership roles, and contribute to innovative HVAC solutions.
Pursue advanced certifications in HVAC technology to stay updated with industry standards.
Aim for a supervisory position to lead a team of technicians and improve operational efficiency.
Engage in continuous learning through workshops and seminars to adopt new technologies.
Contribute to sustainable prac...
Top trending discussions
posted on 29 Nov 2022
I applied via Naukri.com and was interviewed before Nov 2021. There were 2 interview rounds.
Improved efficiency of production line at XYZ manufacturing plant
Implemented lean manufacturing principles to reduce waste and increase productivity
Introduced automation in certain processes to reduce manual labor and increase accuracy
Optimized supply chain management to ensure timely delivery of raw materials
Trained and empowered employees to identify and solve problems on the production line
Implemented a continuous i...
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
posted on 11 Apr 2022
I applied via Company Website and was interviewed before Aug 2023. There was 1 interview round.
Online coding test. Duration was 4 hours. Only one question was given. I had implement 4 APIs. Question was related to DP.
I applied via Job Portal and was interviewed in Jul 2024. There were 2 interview rounds.
I am a Senior Engineer with 10+ years of experience in designing and implementing complex systems.
10+ years of experience in engineering
Specialize in designing and implementing complex systems
Strong problem-solving skills
Experience with various programming languages such as Java, Python, and C++
Designed and implemented a cloud-based data analytics platform for real-time monitoring of industrial equipment performance.
Led a team of 5 engineers in developing the platform from scratch
Utilized AWS services such as Lambda, S3, and DynamoDB for data storage and processing
Implemented machine learning algorithms for predictive maintenance
Integrated with existing industrial IoT devices for data collection
Achieved 20% r...
I appeared for an interview before Apr 2024, where I was asked the following questions.
The refrigeration cycle is a thermodynamic process that removes heat from a designated area to lower its temperature.
1. Evaporation: Refrigerant absorbs heat from the environment, turning from liquid to gas.
2. Compression: The gas is compressed, increasing its pressure and temperature.
3. Condensation: The hot gas releases heat to the surroundings, condensing back into a liquid.
4. Expansion: The liquid refrigerant expan...
Chillers and VRF systems differ in design, application, and efficiency, with various compressor types influencing performance.
Chillers are centralized cooling systems, while VRF systems are decentralized and allow for individual zone control.
Chillers typically use water or refrigerant to cool large buildings, e.g., centrifugal chillers for commercial use.
VRF systems use refrigerant as the cooling medium and can simulta...
COP measures efficiency in heating/cooling systems; heat load calculations determine required capacity for HVAC systems.
COP (Coefficient of Performance) is the ratio of useful heating or cooling provided to the energy consumed.
Heat load calculations assess the thermal energy needed to maintain desired indoor temperatures.
Types of PCBs (Printed Circuit Boards) in VRF (Variable Refrigerant Flow) systems include control P...
Assistant Manager
690
salaries
| ₹8.7 L/yr - ₹15 L/yr |
Senior Engineer
338
salaries
| ₹4 L/yr - ₹10 L/yr |
Deputy Manager
276
salaries
| ₹13.1 L/yr - ₹23 L/yr |
AC Technician
197
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Safety Officer
156
salaries
| ₹2.2 L/yr - ₹6 L/yr |
OPPO
LG Electronics
Bajaj Electricals
Voltas