Filter interviews by
Clear (1)
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Top trending discussions
I applied via Job Portal
I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.
Siemens plc models include S7-1200, S7-1500, S7-300, S7-400, and LOGO!
S7-1200
S7-1500
S7-300
S7-400
LOGO!
SPC stands for Statistical Process Control, a method used to monitor and control processes to ensure they are operating efficiently and within specifications.
SPC involves collecting and analyzing data to identify variations in a process
It helps in detecting and correcting issues before they result in defects
Common tools used in SPC include control charts, histograms, and Pareto charts
To configure a dp dp coupler, set the parameters for communication protocol, baud rate, address, and data format.
Set the communication protocol to match the devices being connected.
Configure the baud rate to ensure proper data transmission speed.
Assign a unique address to the dp dp coupler for identification.
Choose the appropriate data format for the connected devices.
Test the configuration to ensure proper communicati
I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 3 interview rounds.
Maintenance jobs are crucial for ensuring the smooth functioning of equipment and preventing breakdowns.
Maintenance jobs involve regular inspections, cleaning, and repairs of equipment.
They help to identify and fix issues before they become major problems.
Proper maintenance can extend the lifespan of equipment and reduce the need for costly replacements.
Examples of maintenance jobs include oil changes, filter replaceme...
I applied via LinkedIn and was interviewed in Apr 2024. There were 2 interview rounds.
Good and some communication questions were asked
It was very good and asking dsa answers
I was interviewed in Feb 2023.
Approach in chiller refers to the method or strategy used to control the temperature of the chilled water.
Approach in chiller is the temperature difference between the leaving chilled water and the entering chilled water.
A smaller approach indicates better chiller performance.
Approach can be controlled by adjusting the flow rate of the chilled water or the setpoint of the chiller.
Monitoring approach is important to ens
Factors affecting cooling tower efficiency include water quality, air flow, temperature differentials, and fouling.
Water quality - Impurities in water can reduce heat transfer efficiency.
Air flow - Proper air flow is essential for heat exchange.
Temperature differentials - Larger differentials between hot and cold water improve efficiency.
Fouling - Buildup of scale or debris can decrease efficiency.
based on 3 interviews
1 Interview rounds
based on 20 reviews
Rating in categories
Production Officer
159
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
90
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
68
salaries
| ₹0 L/yr - ₹0 L/yr |
Officer
58
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
54
salaries
| ₹0 L/yr - ₹0 L/yr |
Apollo Tyres
Ceat Tyres
MRF Tyres
JK Tyres