Filter interviews by
I applied via AmbitionBox and was interviewed in Mar 2023. There were 2 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed in Jun 2022. There was 1 interview round.
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
Rejection control is essential to maintain PPM (parts per million) levels within acceptable limits.
Implementing quality control measures to reduce rejection rates
Regularly monitoring rejection rates and analyzing root causes
Training employees on proper procedures to minimize rejections
Utilizing statistical process control tools to track rejection trends
Collaborating with suppliers to improve quality of incoming materia
Implementing a new standard tooling inspection process to ensure quality and efficiency.
Develop a detailed checklist of all required tooling inspections
Train technicians on the new inspection process
Regularly review and update the inspection standards based on feedback and results
Utilize digital tools for easier tracking and documentation
Implement a system for reporting and addressing any issues found during inspection
Maintaining 5S on the shop floor involves organizing, cleaning, standardizing, and sustaining a workspace for efficiency and safety.
Sort: Remove unnecessary items and organize tools and materials in designated locations.
Set in order: Arrange items so they are easily accessible and clearly labeled.
Shine: Regularly clean and inspect the workspace to ensure cleanliness and safety.
Standardize: Implement consistent processe...
Kaizen implementation involves continuous improvement in processes and systems.
Kaizen focuses on small, incremental changes to improve efficiency and quality.
Involves all employees in identifying and implementing improvements.
Encourages a culture of continuous learning and innovation.
Examples: implementing a 5S system, setting up regular improvement workshops, using visual management tools.
I applied via Referral and was interviewed before Aug 2022. There were 4 interview rounds.
About reasoning, and about work experience
I applied via Walk-in and was interviewed in Sep 2022. There were 4 interview rounds.
Technical language and reseoning aptitude test
Row mill area and process circuit maintenance
Grinding row mill work process circuit maintenance working time
The grinding row mill work process involves crushing and grinding materials to a fine powder
The circuit maintenance involves checking and repairing any faults in the circuit
Working time varies depending on the workload and maintenance needs
Regular maintenance is crucial to ensure the mill operates efficiently and safely
I applied via Naukri.com and was interviewed before Jun 2023. There was 1 interview round.
I am currently handling a portfolio of 50 customers.
I have experience managing a diverse range of customers in various industries.
I prioritize building strong relationships with each customer to ensure their needs are met.
I regularly communicate with customers to provide updates on products or services.
I track customer feedback and address any issues or concerns promptly.
For example, in my previous role, I managed a po...
Distributor retail counter network, etc
I applied via Naukri.com and was interviewed in Apr 2023. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Nov 2020. There were 2 interview rounds.
Drawing of starter for star delta and
A Lpbs wiring, load cell colour code connection
Motor overcurrent faults can be caused by various factors.
Overloading
Short circuits
Ground faults
Mechanical binding
Voltage imbalance
Inadequate cooling
Excessive starting
Inadequate wire size
Inadequate protection
Motor design flaws
Electrical faults in motors can include short circuits, open circuits, insulation breakdown, and overloading.
Short circuits occur when there is a direct connection between the motor windings, causing excessive current flow.
Open circuits happen when there is a break in the electrical path, preventing current from flowing.
Insulation breakdown occurs when the insulation material surrounding the motor windings deteriorates...
S1 duty refers to a continuous duty cycle of a motor or machine.
S1 duty means that the motor or machine can run continuously without any rest or cooling breaks.
It is typically used for applications where the load is constant and the motor or machine does not need to be turned off.
Examples of S1 duty applications include conveyor belts, pumps, and fans.
S1 duty is also known as continuous duty.
It is important to ensure t...
Some of the top questions asked at the Birla White ITI Technician interview -
based on 1 interview
Interview experience
Sales Executive
112
salaries
| ₹2.5 L/yr - ₹5.3 L/yr |
Assistant Manager
57
salaries
| ₹6.4 L/yr - ₹14.1 L/yr |
Territory Sales Incharge
38
salaries
| ₹5 L/yr - ₹9.7 L/yr |
Senior Officer
32
salaries
| ₹6.5 L/yr - ₹9.6 L/yr |
Senior Sales Officer
30
salaries
| ₹5.8 L/yr - ₹10.5 L/yr |
Nuvoco Vistas
Infra.Market
Jaquar
JSW Cement