Upload Button Icon Add office photos

Filter interviews by

Birla Cement Production Supervisor Interview Questions and Answers

Updated 9 Nov 2021

Birla Cement Production Supervisor Interview Experiences

1 interview found

I applied via Birla Cement Plant Satna Website and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What is your qualifications
  • Ans. I have completed diploma in mechanical engineering from satna
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - I need supervisor post set under

Interview questions from similar companies

Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. About my experience and I work in my area
  • Q2. About myself in my knowledge
Round 3 - Aptitude Test 

Mechanical Engineering field

Round 4 - Technical 

(2 Questions)

  • Q1. Mechanical technical in question
  • Q2. Question about in cement plant
Interview experience
3
Average
Difficulty level
-
Process Duration
2-4 weeks
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

GK mathematics general science

Round 3 - Technical 

(1 Question)

  • Q1. Mass transfer heat transfer opration process handling
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Company profile & productivity?
  • Q2. Your product explain & quality ?
  • Ans. 

    Our product is a high-quality, innovative solution that meets the needs of our target market.

    • Our product is designed to be user-friendly and efficient.

    • We use top-of-the-line materials and technology to ensure durability and performance.

    • Customer feedback and satisfaction are key factors in our product development process.

  • Answered by AI
  • Q3. Send the product my important time period ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Pay roll job & nearest home town area ,
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Which type of pc firing
  • Ans. 

    PC firing refers to the type of firing system used in a power plant's boiler to ignite the fuel.

    • PC firing stands for Pulverized Coal firing, where coal is ground into fine powder before being injected into the boiler combustion chamber

    • It is a common method used in coal-fired power plants to efficiently burn coal and generate steam for electricity production

    • Other types of firing systems include fluidized bed combustion

  • Answered by AI
  • Q2. Witch type of cooler house
  • Ans. 

    The type of cooler house depends on the specific requirements of the production process, such as air flow, temperature control, and size.

    • Cooling towers for large-scale industrial production

    • Air conditioning units for smaller production facilities

    • Evaporative coolers for energy-efficient cooling solutions

    • Refrigeration units for temperature-sensitive production processes

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Witch stage of preheater
  • Ans. 

    The preheater stage in cement production is the calciner stage.

    • The preheater typically consists of several stages including the cyclones and the calciner.

    • The calciner stage is where the raw materials are heated to high temperatures before entering the rotary kiln.

    • The calciner stage helps to reduce the energy consumption in the rotary kiln by preheating the raw materials.

    • An example of a preheater configuration is a 4-st

  • Answered by AI
  • Q2. How much capacity
  • Ans. 

    Capacity planning is crucial for ensuring optimal production output and resource utilization.

    • Capacity planning involves assessing current production capacity and forecasting future needs.

    • Factors to consider include equipment capabilities, workforce availability, and production demand.

    • Examples of capacity planning tools include production scheduling software and simulation models.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Regarding previous company work.

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Basics about cement industry
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. What is the benefits bonus or pf
  • Ans. 

    Benefits, bonus, and PF (Provident Fund) are important components of an employee's compensation package.

    • Benefits typically include health insurance, retirement plans, paid time off, and other perks provided by the employer.

    • Bonuses are additional payments given to employees based on performance, company profits, or other criteria.

    • Provident Fund (PF) is a mandatory retirement savings scheme in India, where both the emplo...

  • Answered by AI
  • Q2. What is the salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Production planning
  • Q2. Manpower handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Ok
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. What made you think you will be employed? Ans: I have the right insights needed for the job
  • Q2. Hope you won't quit a month after being employed? Ans: No,I won't
  • Q3. What made you apply for this job? Ans: I really want to help this company grow.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always appear neat and be a reserved person.
Always work smart

Tell us how to improve this page.

Interview Questions from Similar Companies

UltraTech Cement Interview Questions
4.2
 • 542 Interviews
JK Cement Interview Questions
4.1
 • 245 Interviews
Grasim Industries Interview Questions
4.0
 • 205 Interviews
ACC Interview Questions
3.9
 • 185 Interviews
Shree Cement Interview Questions
3.8
 • 151 Interviews
Infra.Market Interview Questions
4.2
 • 109 Interviews
Ambuja Cements Interview Questions
3.9
 • 107 Interviews
JSW Cement Interview Questions
4.1
 • 102 Interviews
Nuvoco Vistas Interview Questions
4.1
 • 90 Interviews
View all

Birla Cement Production Supervisor Reviews and Ratings

based on 1 review

1.0/5

Rating in categories

3.0

Skill development

4.0

Work-life balance

3.0

Salary

4.0

Job security

4.0

Company culture

4.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
62 salaries
unlock blur

₹5.3 L/yr - ₹16 L/yr

Sales Officer
52 salaries
unlock blur

₹1.5 L/yr - ₹5.1 L/yr

Senior Executive
25 salaries
unlock blur

₹4.5 L/yr - ₹10.5 L/yr

Deputy Manager
15 salaries
unlock blur

₹5.8 L/yr - ₹16 L/yr

Sales Executive
15 salaries
unlock blur

₹2.3 L/yr - ₹8 L/yr

Explore more salaries
Compare Birla Cement with

UltraTech Cement

4.2
Compare

ACC

3.9
Compare

Ambuja Cements

3.9
Compare

Shree Cement

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview