Filter interviews by
I applied via Walk-in and was interviewed in Nov 2023. There were 4 interview rounds.
Mechanical Engineering field
Top trending discussions
posted on 7 Aug 2023
GK mathematics general science
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
Our product is a high-quality, innovative solution that meets the needs of our target market.
Our product is designed to be user-friendly and efficient.
We use top-of-the-line materials and technology to ensure durability and performance.
Customer feedback and satisfaction are key factors in our product development process.
posted on 15 Jun 2024
PC firing refers to the type of firing system used in a power plant's boiler to ignite the fuel.
PC firing stands for Pulverized Coal firing, where coal is ground into fine powder before being injected into the boiler combustion chamber
It is a common method used in coal-fired power plants to efficiently burn coal and generate steam for electricity production
Other types of firing systems include fluidized bed combustion
The type of cooler house depends on the specific requirements of the production process, such as air flow, temperature control, and size.
Cooling towers for large-scale industrial production
Air conditioning units for smaller production facilities
Evaporative coolers for energy-efficient cooling solutions
Refrigeration units for temperature-sensitive production processes
The preheater stage in cement production is the calciner stage.
The preheater typically consists of several stages including the cyclones and the calciner.
The calciner stage is where the raw materials are heated to high temperatures before entering the rotary kiln.
The calciner stage helps to reduce the energy consumption in the rotary kiln by preheating the raw materials.
An example of a preheater configuration is a 4-st
Capacity planning is crucial for ensuring optimal production output and resource utilization.
Capacity planning involves assessing current production capacity and forecasting future needs.
Factors to consider include equipment capabilities, workforce availability, and production demand.
Examples of capacity planning tools include production scheduling software and simulation models.
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Nov 2023. There was 1 interview round.
I applied via Company Website and was interviewed before Mar 2022. There were 2 interview rounds.
General methametics and basics of chemical engineering
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
394
salaries
| ₹5.3 L/yr - ₹15 L/yr |
Senior Executive
330
salaries
| ₹4.8 L/yr - ₹11 L/yr |
Deputy Manager
241
salaries
| ₹7.5 L/yr - ₹22 L/yr |
Sales Officer
230
salaries
| ₹2.5 L/yr - ₹7.8 L/yr |
Technical Service Engineer
190
salaries
| ₹2.5 L/yr - ₹6.8 L/yr |
UltraTech Cement
Ambuja Cements
ACC
Shree Cement