Upload Button Icon Add office photos

Dalmia Bharat Cement

Compare button icon Compare button icon Compare

Filter interviews by

Dalmia Bharat Cement Production Supervisor Interview Questions and Answers

Updated 15 Dec 2023

Dalmia Bharat Cement Production Supervisor Interview Experiences

1 interview found

Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. About my experience and I work in my area
  • Q2. About myself in my knowledge
Round 3 - Aptitude Test 

Mechanical Engineering field

Round 4 - Technical 

(2 Questions)

  • Q1. Mechanical technical in question
  • Q2. Question about in cement plant

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
2-4 weeks
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

GK mathematics general science

Round 3 - Technical 

(1 Question)

  • Q1. Mass transfer heat transfer opration process handling
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Company profile & productivity?
  • Q2. Your product explain & quality ?
  • Ans. 

    Our product is a high-quality, innovative solution that meets the needs of our target market.

    • Our product is designed to be user-friendly and efficient.

    • We use top-of-the-line materials and technology to ensure durability and performance.

    • Customer feedback and satisfaction are key factors in our product development process.

  • Answered by AI
  • Q3. Send the product my important time period ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Pay roll job & nearest home town area ,
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Which type of pc firing
  • Ans. 

    PC firing refers to the type of firing system used in a power plant's boiler to ignite the fuel.

    • PC firing stands for Pulverized Coal firing, where coal is ground into fine powder before being injected into the boiler combustion chamber

    • It is a common method used in coal-fired power plants to efficiently burn coal and generate steam for electricity production

    • Other types of firing systems include fluidized bed combustion

  • Answered by AI
  • Q2. Witch type of cooler house
  • Ans. 

    The type of cooler house depends on the specific requirements of the production process, such as air flow, temperature control, and size.

    • Cooling towers for large-scale industrial production

    • Air conditioning units for smaller production facilities

    • Evaporative coolers for energy-efficient cooling solutions

    • Refrigeration units for temperature-sensitive production processes

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Witch stage of preheater
  • Ans. 

    The preheater stage in cement production is the calciner stage.

    • The preheater typically consists of several stages including the cyclones and the calciner.

    • The calciner stage is where the raw materials are heated to high temperatures before entering the rotary kiln.

    • The calciner stage helps to reduce the energy consumption in the rotary kiln by preheating the raw materials.

    • An example of a preheater configuration is a 4-st

  • Answered by AI
  • Q2. How much capacity
  • Ans. 

    Capacity planning is crucial for ensuring optimal production output and resource utilization.

    • Capacity planning involves assessing current production capacity and forecasting future needs.

    • Factors to consider include equipment capabilities, workforce availability, and production demand.

    • Examples of capacity planning tools include production scheduling software and simulation models.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About heat treatment process
  • Q2. About casting process
  • Q3. Mechanical metallurgy

Interview Preparation Tips

Topics to prepare for India Cements Production Engineer interview:
  • Welding Metallurgy
Interview preparation tips for other job seekers - I am fresher and hardworker.My integrated to do any technical of job in company.Flexibility and adaptability to work in any environment.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Basics about cement industry
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Production planning
  • Q2. Manpower handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Ok
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. What made you think you will be employed? Ans: I have the right insights needed for the job
  • Q2. Hope you won't quit a month after being employed? Ans: No,I won't
  • Q3. What made you apply for this job? Ans: I really want to help this company grow.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always appear neat and be a reserved person.
Always work smart

Interview Questionnaire 

2 Questions

  • Q1. Why do u want to leave the present company??
  • Q2. How much do u want money?
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

General methametics and basics of chemical engineering

Round 2 - Technical 

(2 Questions)

  • Q1. Fluid dynamics heat transfer material balance
  • Q2. Plant safety and quality control
Round 3 - HR 

(1 Question)

  • Q1. Personal details and general HR questions

Dalmia Bharat Cement Interview FAQs

How many rounds are there in Dalmia Bharat Cement Production Supervisor interview?
Dalmia Bharat Cement interview process usually has 4 rounds. The most common rounds in the Dalmia Bharat Cement interview process are Resume Shortlist, HR and Aptitude Test.
What are the top questions asked in Dalmia Bharat Cement Production Supervisor interview?

Some of the top questions asked at the Dalmia Bharat Cement Production Supervisor interview -

  1. Mechanical technical in quest...read more
  2. Question about in cement pl...read more

Tell us how to improve this page.

Dalmia Bharat Cement Production Supervisor Interview Process

based on 1 interview

Interview experience

2
  
Poor
View more

Interview Questions from Similar Companies

UltraTech Cement Interview Questions
4.2
 • 551 Interviews
JK Cement Interview Questions
4.1
 • 251 Interviews
Grasim Industries Interview Questions
4.0
 • 205 Interviews
ACC Interview Questions
3.9
 • 187 Interviews
Shree Cement Interview Questions
3.8
 • 155 Interviews
Ambuja Cements Interview Questions
3.9
 • 108 Interviews
Star Cement Interview Questions
4.0
 • 64 Interviews
HIL Limited Interview Questions
4.1
 • 61 Interviews
View all
Dalmia Bharat Cement Production Supervisor Salary
based on 6 salaries
₹2 L/yr - ₹3.6 L/yr
17% less than the average Production Supervisor Salary in India
View more details

Dalmia Bharat Cement Production Supervisor Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

4.9

Skill development

3.0

Work-life balance

3.0

Salary

4.0

Job security

4.9

Company culture

4.9

Promotions

4.9

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
394 salaries
unlock blur

₹5.3 L/yr - ₹15 L/yr

Senior Executive
330 salaries
unlock blur

₹4.8 L/yr - ₹11 L/yr

Deputy Manager
241 salaries
unlock blur

₹7.5 L/yr - ₹22 L/yr

Sales Officer
230 salaries
unlock blur

₹2.5 L/yr - ₹7.8 L/yr

Technical Service Engineer
190 salaries
unlock blur

₹2.5 L/yr - ₹6.8 L/yr

Explore more salaries
Compare Dalmia Bharat Cement with

UltraTech Cement

4.2
Compare

Ambuja Cements

3.9
Compare

ACC

3.9
Compare

Shree Cement

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview