Upload Button Icon Add office photos

Birla Cement

Compare button icon Compare button icon Compare

Filter interviews by

Birla Cement Maintenance Engineer Interview Questions and Answers

Updated 4 Oct 2020

Birla Cement Maintenance Engineer Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Apr 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. About quality of cement maintenance of blower and belt conveyor
  • Q2. PH of water also asked
  • Q3. To control residues in classifier
  • Ans. 

    To control residues in classifier

    • Regular cleaning of the classifier is necessary to control residues

    • Adjusting the airflow and feed rate can also help in controlling residues

    • Using proper filter media can prevent the buildup of residues

    • Implementing a preventive maintenance program can help in early detection and control of residues

  • Answered by AI
  • Q4. Type of bearing
  • Ans. 

    Bearings are used to reduce friction between two moving parts. There are several types of bearings available.

    • Types of bearings include ball bearings, roller bearings, plain bearings, and fluid bearings.

    • Ball bearings are the most common type and are used in many applications, including automotive and industrial machinery.

    • Roller bearings are used in heavy-duty applications, such as conveyor belts and large motors.

    • Plain b...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always keep updated your job functional area good words of technical

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Tell me the difference between one way slab and two way slab
  • Ans. 

    One way slab is supported on two opposite sides only, while two way slab is supported on all four sides.

    • One way slab is designed to carry loads along one direction only

    • Two way slab is designed to carry loads along both directions

    • One way slab is generally used in buildings with rectangular or square shapes

    • Two way slab is commonly used in buildings with irregular shapes or where the spans are almost equal

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just one random question from HOD about cement properties and you're in.

Interview Questionnaire 

8 Questions

  • Q1. Briefly explain about Mines crusher?
  • Ans. 

    Mines crusher is a machine used to break down large rocks into smaller pieces for easier transport and processing.

    • Mines crusher is commonly used in mining operations to reduce the size of ore and other materials.

    • It works by applying pressure to the material to break it down into smaller pieces.

    • Different types of crushers are used depending on the type of material being crushed, such as jaw crushers, cone crushers, and ...

  • Answered by AI
  • Q2. What is PESO ? and explain different forms related to explosives?
  • Ans. 

    PESO refers to different forms of explosives: Primary, Secondary, Emulsion, and Oxidizer.

    • Primary explosives are sensitive and used to initiate other explosives.

    • Secondary explosives are less sensitive and used for blasting.

    • Emulsion explosives are a mixture of oxidizers and fuels.

    • Oxidizers are chemicals that provide oxygen for combustion.

  • Answered by AI
  • Q3. What is stripping ratio?
  • Ans. 

    Stripping ratio is the ratio of overburden to ore or coal.

    • It is used in mining to determine the amount of waste that needs to be removed to extract a given amount of ore or coal.

    • A high stripping ratio indicates that a lot of waste needs to be removed before the desired mineral can be extracted.

    • For example, a stripping ratio of 3:1 means that for every 3 units of waste material removed, 1 unit of ore or coal can be extr

  • Answered by AI
  • Q4. What is angle of repose?
  • Ans. 

    Angle of repose is the maximum angle at which a material can be piled up without slumping or sliding down.

    • It is the steepest angle at which a sloping surface formed of a particular loose material is stable.

    • It is influenced by the size, shape, and surface properties of the particles, as well as the moisture content and packing density.

    • Examples include sand dunes, piles of gravel, and heaps of coal.

    • It is important in fie...

  • Answered by AI
  • Q5. Reasons behind the Dump failure?
  • Ans. 

    Dump failure can occur due to various reasons such as hardware failure, software bugs, power failure, etc.

    • Hardware failure such as disk failure or memory failure

    • Software bugs or corruption in the dump file

    • Power failure during the dump process

    • Insufficient disk space for the dump file

    • Incompatibility issues with the operating system or drivers

    • Malware or virus infection

    • Human error such as accidentally deleting the dump fil

  • Answered by AI
  • Q6. How you get Machine and Dumper TPH?
  • Ans. 

    Machine and Dumper TPH can be calculated by measuring the weight of material moved in a certain time period.

    • Measure the weight of material moved by the machine or dumper in a certain time period

    • Divide the weight by the time period to get the TPH (tonnes per hour)

    • Repeat the process multiple times to get an average TPH

    • Use a weighbridge or load cell to accurately measure the weight

    • Ensure the machine or dumper is loaded to

  • Answered by AI
  • Q7. What is safety!
  • Ans. 

    Safety is the state of being protected from harm or danger.

    • It involves taking precautions to prevent accidents or injuries.

    • It can be achieved through proper training, equipment, and procedures.

    • Examples include wearing protective gear, following safety protocols, and maintaining equipment.

    • Safety is important in all industries, from construction to healthcare.

    • It is a shared responsibility of both employers and employees.

    • ...

  • Answered by AI
  • Q8. Duties and responsibilities of mines foreman?
  • Ans. 

    Mines foreman is responsible for overseeing the safety, production, and maintenance of a mining operation.

    • Ensuring compliance with safety regulations and protocols

    • Supervising and coordinating the work of miners and other staff

    • Monitoring production levels and ensuring targets are met

    • Maintaining equipment and machinery

    • Preparing reports and maintaining records

    • Training new employees and providing ongoing training to existi

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Test based on basic Mining knowledge

Round 3 - One-on-one 

(1 Question)

  • Q1. Interview questions based on Blasting process and new technology.

Interview Questionnaire 

1 Question

  • Q1. What is your salary expectation -?

I was interviewed in Jul 2020.

Interview Questionnaire 

1 Question

  • Q1. Process parameters, fan flow calculation quality related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Aware about mill specifications
Process parameters flow calculation etc.

Interview Questionnaire 

3 Questions

  • Q1. Tell me about urself,
  • Q2. Site related questions like silo slip form details, piling details.
  • Q3. Achievements in short
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Mar 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

2 rounds of GD
Each one lasted from 5 - 10 min.

Round 3 - HR 

(2 Questions)

  • Q1. Tell us about yourself.
  • Q2. What are your future goals.
Round 4 - Technical 

(3 Questions)

  • Q1. Question from Intership Experience.
  • Q2. Question based on projects.
  • Q3. Questions from favourite subject.

Interview Preparation Tips

Interview preparation tips for other job seekers - For freshers, know whatever you write in your resume. Have your favourite subject ready for interview.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Indeed and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Erection of the cement mill
  • Ans. 

    The erection of a cement mill involves the installation and assembly of the mill equipment and machinery.

    • The cement mill is typically a large cylindrical structure where raw materials are ground into fine powder.

    • The erection process includes the installation of the mill shell, liners, diaphragm, and grinding media.

    • Proper alignment and leveling of the mill components are crucial for efficient operation.

    • Electrical and me...

  • Answered by AI
  • Q2. Procedure of erection
  • Ans. 

    The procedure of erection involves the process of assembling and installing structural components to create a stable and functional structure.

    • Planning and preparation

    • Site preparation and foundation

    • Assembly of structural components

    • Installation of utilities and systems

    • Finishing and testing

    • Final inspection and handover

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Planning of the erection
  • Ans. 

    Planning of the erection involves creating a detailed plan for the construction process.

    • Identify the scope and objectives of the project

    • Determine the sequence of activities and their dependencies

    • Allocate resources and manpower

    • Create a schedule and timeline

    • Consider safety measures and risk management

    • Coordinate with other teams and stakeholders

    • Monitor progress and make adjustments as necessary

  • Answered by AI

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What problem are faced during my career in previous company
  • Q2. Why i am will to change my present job after a longtime
  • Q3. How will i mange manpower

Interview Preparation Tips

Interview preparation tips for other job seekers - stick to your experince if anyone worked with dedication then they will crack interview

Birla Cement Interview FAQs

What are the top questions asked in Birla Cement Maintenance Engineer interview?

Some of the top questions asked at the Birla Cement Maintenance Engineer interview -

  1. To control residues in classif...read more
  2. Type of bear...read more
  3. About quality of cement maintenance of blower and belt conve...read more

Tell us how to improve this page.

Assistant Manager
62 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Sales Officer
50 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Executive
27 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
15 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Sales Executive
15 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Birla Cement with

UltraTech Cement

4.2
Compare

ACC

3.9
Compare

Ambuja Cements

3.9
Compare

Shree Cement

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview