Filter interviews by
I applied via Job Portal and was interviewed in Apr 2024. There were 2 interview rounds.
My expected CTC is based on my experience, skills, and the industry standards.
My expected CTC is in line with the market rates for my level of experience and expertise.
I have taken into consideration the cost of living in the area where the job is located.
I am open to negotiation based on the overall compensation package offered by the company.
Experienced R&D professional with expertise in product development and innovation.
Over 5 years of experience in research and development
Strong background in product development and innovation
Led successful projects resulting in new product launches
Skilled in data analysis and problem-solving
Proficient in using various research methodologies
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.
Waste water treatment is the process of removing contaminants from wastewater to make it safe for discharge or reuse.
Wastewater is collected from various sources such as households, industries, and agriculture.
The treatment process involves physical, chemical, and biological processes to remove contaminants such as solids, organic matter, and pathogens.
The treated water can be discharged into water bodies or reused for...
I applied via LinkedIn and was interviewed in Jun 2019. There were 3 interview rounds.
BioPetroClean interview questions for popular designations
posted on 6 Apr 2016
I applied via Campus Placement
posted on 6 Apr 2016
I applied via Campus Placement
I applied via Campus Placement
posted on 6 Apr 2016
I applied via Campus Placement
It was easy , like very easy basic math , logical reasoning, English comprehension
It was a bit intense
I applied via Referral and was interviewed before Mar 2023. There were 2 interview rounds.
Condenser area calculation is based on heat transfer requirements and drying time depends on factors like temperature, humidity, and airflow.
Calculate condenser area based on heat transfer requirements and desired cooling capacity
Consider factors like temperature, humidity, and airflow when determining drying time
Use formulas such as Q = U * A * deltaT for heat transfer calculations
Optimize condenser design to maximize
Water is used as a major part of utility due to its abundance, versatility, cost-effectiveness, and environmentally friendly properties.
Abundance: Water is readily available in nature and can be easily sourced for various industrial processes.
Versatility: Water can be used for a wide range of applications such as cooling, cleaning, and as a solvent.
Cost-effectiveness: Water is relatively inexpensive compared to other u...
based on 1 interview
Interview experience
based on 27 reviews
Rating in categories
Process Engineer
45
salaries
| ₹1.9 L/yr - ₹3.6 L/yr |
Electrical Engineer
10
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Site Manager
5
salaries
| ₹5 L/yr - ₹11.5 L/yr |
Project Manager
4
salaries
| ₹7.5 L/yr - ₹7.9 L/yr |
HR Executive
4
salaries
| ₹3.6 L/yr - ₹6 L/yr |
Biocon Limited
Reliance Industries
GAIL
Indian Oil Corporation