Filter interviews by
I applied via Approached by Company and was interviewed in Jul 2022. There were 4 interview rounds.
Top trending discussions
I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.
Ammonia plant discussion
I applied via Recruitment Consulltant and was interviewed before Aug 2023. There was 1 interview round.
Managing tight project deadlines and coordinating with multiple teams to ensure timely completion.
Balancing multiple projects simultaneously
Coordinating with cross-functional teams
Handling unexpected challenges and changes in project scope
I applied via Approached by Company and was interviewed in Mar 2022. There were 3 interview rounds.
Sallary discussion
Leet code
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 3 interview rounds.
Consumption gap analysis involves identifying and understanding the difference between actual and desired levels of consumption.
Identify the desired level of consumption
Determine the actual level of consumption
Calculate the gap by subtracting the actual level from the desired level
Analyze the reasons for the consumption gap
Identify potential solutions to bridge the gap
Inventory gaps in a system refer to discrepancies or shortages in the quantity or availability of items.
Stockouts: When an item is out of stock and unavailable for purchase or use.
Overstocking: When there is an excess of inventory beyond what is needed or can be sold.
Obsolete inventory: Items that are no longer in demand or have become outdated.
Shrinkage: Loss of inventory due to theft, damage, or other reasons.
Lead ti...
I applied via Recruitment Consultant and was interviewed in Aug 2020. There were 5 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There were 3 interview rounds.
To increase plant performance, factors such as maintenance, cleaning, monitoring, and technology upgrades need to be considered.
Regular maintenance of equipment and components
Frequent cleaning of solar panels to ensure maximum sunlight absorption
Continuous monitoring of plant performance to identify and address issues promptly
Investing in technology upgrades to improve efficiency and output
Optimizing system design and
I was interviewed in Dec 2020.
based on 4 reviews
Rating in categories
Quality Engineer
76
salaries
| ₹1.2 L/yr - ₹4.2 L/yr |
Quality Inspector
32
salaries
| ₹1.2 L/yr - ₹3.5 L/yr |
Assistant Manager
31
salaries
| ₹4 L/yr - ₹9.4 L/yr |
Senior Engineer
29
salaries
| ₹2.7 L/yr - ₹6 L/yr |
Production Supervisor
21
salaries
| ₹1.5 L/yr - ₹4.3 L/yr |
Tata Steel
JSW Steel
Hindalco Industries
Reliance Industries