Upload Button Icon Add office photos

Filter interviews by

Bharat Light & Power Interview Questions and Answers

Updated 29 Aug 2023

Bharat Light & Power Interview Experiences

1 interview found

Data Analyst Interview Questions & Answers

user image Aditya Meena

posted on 29 Aug 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is SCADA, what is transformer motor
  • Ans. 

    SCADA stands for Supervisory Control and Data Acquisition, used to monitor and control industrial processes. A transformer motor is a type of electric motor used to drive transformers.

    • SCADA is a system used to remotely monitor and control industrial processes

    • It collects real-time data from sensors and equipment in the field

    • SCADA systems are commonly used in industries such as power plants, water treatment facilities, a...

  • Answered by AI
  • Q2. Write a program to find if a number is prime
  • Ans. 

    Program to check if a number is prime

    • Iterate from 2 to square root of the number

    • Check if the number is divisible by any number in the range

    • If divisible by any number, it is not prime

    • If not divisible by any number, it is prime

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why you want this job
  • Q2. Have you worked in a team before

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

Skills evaluated in this interview

Data Analyst Interview Questions asked at other Companies

Q1. Suppose there is a room in the office and X people enter room throughout the day, Y people leave throughout the day [continuously people are entering the room, some are staying there, and rest are going out] .. so tell me the code to calcul... read more
View answer (11)

Interview questions from similar companies

I applied via Company Website and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Dfig system,power electronics equipments and usage,resume justification,power system transient,power flow,yaw,pitch system,generators,motors thermal loading of generators,capability curve

Interview Preparation Tips

Interview preparation tips for other job seekers - Good experience of knowledge development in interview only

I applied via Approached by Company and was interviewed before Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About solar technical
  • Q2. About communication skills
  • Q3. About your knowledge

Interview Preparation Tips

Topics to prepare for UTL Solar Sales Executive interview:
  • Solar installations
  • solar designs
Interview preparation tips for other job seekers - Pls prepared for technical query related to solar fields.

I applied via Naukri.com and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. What is the previous work experience.?
  • Ans. 

    I have 5 years of experience in sales, working for a leading technology company.

    • Worked as a Sales Executive for XYZ Technology for 5 years

    • Managed a portfolio of key accounts and consistently exceeded sales targets

    • Developed and maintained strong relationships with clients, resulting in repeat business

    • Collaborated with cross-functional teams to develop and implement effective sales strategies

    • Provided excellent customer s...

  • Answered by AI
  • Q2. What is your achievements?
  • Ans. 

    I have achieved consistent sales growth, exceeding targets by 20% for three consecutive years.

    • Consistently exceeded sales targets by 20% for three consecutive years

    • Developed and implemented effective sales strategies resulting in increased revenue

    • Built and maintained strong relationships with key clients, leading to repeat business

    • Received multiple awards for top sales performance

  • Answered by AI
  • Q3. How will be you achieve the target
  • Ans. 

    I will achieve the target by implementing a strategic sales plan, building strong relationships with clients, and consistently meeting and exceeding sales goals.

    • Developing a comprehensive sales strategy that includes identifying target markets, setting sales goals, and creating a plan to reach those goals.

    • Building and maintaining strong relationships with clients by providing excellent customer service, understanding t...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident to answer the question
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Apr 2024.

Round 1 - HR 

(2 Questions)

  • Q1. About work culture
  • Q2. About technical
Round 2 - Technical 

(1 Question)

  • Q1. Related to Transformer
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I appeared for an interview in Jul 2024.

Round 1 - Technical 

(10 Questions)

  • Q1. Can you tell me about yourself?
  • Q2. What are your responsibilities in the plant?
  • Ans. 

    As a Senior Engineer in the plant, my responsibilities include overseeing operations, managing projects, ensuring compliance with regulations, and leading a team of engineers.

    • Overseeing day-to-day operations in the plant

    • Managing projects related to plant upgrades or expansions

    • Ensuring compliance with safety and environmental regulations

    • Leading and mentoring a team of engineers

    • Troubleshooting technical issues and implem

  • Answered by AI
  • Q3. Why is tan delta testing conducted in power transformers?
  • Ans. 

    Tan delta testing is conducted in power transformers to assess the insulation condition and detect any potential faults.

    • Tan delta testing helps in evaluating the insulation quality of power transformers.

    • It can detect any potential issues such as moisture, contamination, or aging of insulation materials.

    • By measuring the tan delta value, engineers can assess the dielectric losses in the transformer.

    • Regular tan delta test...

  • Answered by AI
  • Q4. What is a vector group?
  • Ans. 

    A vector group is a method used to represent the phase relationship between the primary and secondary windings of a transformer.

    • Vector group indicates the connection of transformer windings and the phase shift between them.

    • It is represented by a combination of letters and numbers, such as Yd1, Dyn11, etc.

    • Different vector groups have different phase relationships, affecting the transformer's performance and operation.

    • Ve...

  • Answered by AI
  • Q5. What should be considered when erecting an IDT (Inverter duty Transformer)?
  • Ans. 

    Considerations when erecting an IDT (Inverter duty Transformer)

    • Ensure the transformer is designed for inverter duty applications

    • Properly size the transformer based on the inverter's output power

    • Consider the harmonic content of the inverter's output when selecting the transformer

    • Provide adequate ventilation and cooling for the transformer to handle the increased heat generated by the inverter

    • Ensure proper grounding and ...

  • Answered by AI
  • Q6. What is the star-delta connection in power transformers?
  • Ans. 

    Star-delta connection is a method used in power transformers to reduce starting current and improve efficiency.

    • Star-delta connection involves connecting the primary windings of the transformer in a star configuration during starting, and then switching to a delta configuration during normal operation.

    • This method helps in reducing the starting current drawn by the transformer, which is beneficial for the power system.

    • It...

  • Answered by AI
  • Q7. What types of conductors are used in high-tension (HT) lines, and what are their current capacities?
  • Ans. 

    High-tension (HT) lines use different types of conductors with varying current capacities.

    • Types of conductors used in HT lines include aluminum, steel, and composite materials

    • Aluminum conductors are commonly used due to their lightweight and high conductivity

    • Steel conductors are used for their strength and durability

    • Composite conductors are a newer technology that offer a balance of strength and conductivity

    • Current cap...

  • Answered by AI
  • Q8. What is the distance between poles in 33KV high tension lines?
  • Ans. 

    The distance between poles in 33KV high tension lines is typically around 50-60 meters.

    • The distance between poles in high tension lines is determined by factors such as terrain, voltage level, and local regulations.

    • In general, the distance can range from 50 to 60 meters for 33KV high tension lines.

    • This distance is important to ensure proper support and insulation of the conductors between poles.

  • Answered by AI
  • Q9. What is the process of laying LT cables?
  • Ans. 

    The process of laying LT cables involves planning, trenching, laying the cables, jointing, testing, and backfilling.

    • Plan the route and depth of the trench for laying the cables.

    • Excavate the trench to the required depth and width.

    • Lay the cables in the trench, ensuring proper alignment and support.

    • Joint the cables together using appropriate connectors.

    • Test the cables for continuity and insulation resistance.

    • Backfill the ...

  • Answered by AI
  • Q10. What is the process for attaching modules?
  • Ans. 

    The process for attaching modules involves identifying connection points, aligning the modules, securing them in place, and testing for functionality.

    • Identify connection points on both modules

    • Align the modules properly to ensure a secure fit

    • Secure the modules in place using appropriate fasteners or connectors

    • Test the functionality of the attached modules to ensure proper connection

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why do you want to change jobs?
  • Ans. 

    Seeking new challenges and opportunities for growth in a more innovative environment.

    • Desire for new challenges and opportunities

    • Seeking growth and advancement

    • Looking for a more innovative work environment

  • Answered by AI
  • Q2. What can you share about your family?
  • Ans. 

    I come from a close-knit family of four, including my parents and younger sister.

    • My parents have always been supportive of my career choices and encouraged me to pursue my passion for engineering.

    • I have a younger sister who is currently studying computer science at university, following in my footsteps.

    • We enjoy spending quality time together, whether it's going on family vacations or simply having dinner at home.

  • Answered by AI
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Knowledge about composite blade manufacturing
  • Q2. Knowledge about cost saving initiatives

Interview Preparation Tips

Interview preparation tips for other job seekers - Soft skills are more important
Focus on safety,quality cost aspects
Round 1 - Technical 

(1 Question)

  • Q1. Power bi, sap, automation, dashboard development
Round 2 - HR 

(1 Question)

  • Q1. Hr questions...general information related to project. Tools and skills etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go for this company... they changes the role after joining.. this happened with me as well as with somw other people.

Assistant Manager Interview Questions & Answers

Goldi Solar user image Kripanath Vishwakarma

posted on 14 Mar 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(3 Questions)

  • Q1. Details of previous employment details
  • Q2. Salary details And educational details
  • Ans. We give personal salary structure and shared my personal educational details
  • Answered by Kripanath Vishwakarma
  • Q3. Experience related
  • Ans. We provided proper working experience in hr at the time of hr round interviews
  • Answered by Kripanath Vishwakarma
Round 2 - Technical 

(2 Questions)

  • Q1. Process related all stap basic details
  • Q2. We given all details of the process of Solar module manufacturing related
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Fabrication procedure of Heat exchanger?
  • Ans. 

    The fabrication procedure of a heat exchanger involves designing, assembling, and welding together various components to create a system for transferring heat between two fluids.

    • Designing the layout and dimensions of the heat exchanger based on the specific requirements and operating conditions

    • Selecting the appropriate materials for the heat exchanger components to ensure compatibility with the fluids and temperature r...

  • Answered by AI
  • Q2. Information about material of construction?
  • Ans. 

    Material of construction refers to the type of material used to build a structure or object.

    • Material of construction can impact the durability, strength, and cost of a project.

    • Common materials include steel, concrete, wood, and plastic.

    • The choice of material depends on factors such as the intended use, budget, and environmental conditions.

    • For example, steel is often used in high-rise buildings for its strength, while w...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good atmosphere to work.

Bharat Light & Power Interview FAQs

How many rounds are there in Bharat Light & Power interview?
Bharat Light & Power interview process usually has 3 rounds. The most common rounds in the Bharat Light & Power interview process are Resume Shortlist, Technical and HR.
How to prepare for Bharat Light & Power interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Bharat Light & Power. The most common topics and skills that interviewers at Bharat Light & Power expect are Javascript, Python, Computer science, Front End and GCP.
What are the top questions asked in Bharat Light & Power interview?

Some of the top questions asked at the Bharat Light & Power interview -

  1. What is SCADA, what is transformer mo...read more
  2. Write a program to find if a number is pr...read more

Tell us how to improve this page.

Bharat Light & Power Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

UTL Solar Interview Questions
3.5
 • 43 Interviews
Senvion Interview Questions
4.0
 • 19 Interviews
M E Energy Interview Questions
4.1
 • 17 Interviews
Gautam Solar Interview Questions
4.0
 • 16 Interviews
LM Wind Power Interview Questions
4.0
 • 13 Interviews
ZunRoof Tech Interview Questions
2.7
 • 8 Interviews
View all

Bharat Light & Power Reviews and Ratings

based on 17 reviews

2.4/5

Rating in categories

2.6

Skill development

2.6

Work-life balance

2.2

Salary

1.8

Job security

2.5

Company culture

2.2

Promotions

2.1

Work satisfaction

Explore 17 Reviews and Ratings
Data Scientist
15 salaries
unlock blur

₹4.9 L/yr - ₹14 L/yr

Associate Software Developer
7 salaries
unlock blur

₹4.5 L/yr - ₹6.2 L/yr

Associate Data Scientist
7 salaries
unlock blur

₹5.5 L/yr - ₹11.9 L/yr

Data Analyst
7 salaries
unlock blur

₹4.1 L/yr - ₹9 L/yr

Software Engineer
6 salaries
unlock blur

₹3.3 L/yr - ₹6.5 L/yr

Explore more salaries
Compare Bharat Light & Power with

UTL Solar

3.5
Compare

Danfoss Power Solutions

4.1
Compare

LM Wind Power

4.0
Compare

Senvion

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview