Filter interviews by
I applied via Campus Placement and was interviewed in May 2021. There were 3 interview rounds.
Industry 4.0 is the fourth industrial revolution that integrates advanced technologies like IoT, AI, and ML to automate and optimize manufacturing processes.
Industry 4.0 is a term used to describe the current trend of automation and data exchange in manufacturing technologies.
IoT (Internet of Things) refers to the network of physical devices, vehicles, and other objects that are embedded with sensors, software, and con...
Pink people is not a commonly used term and has no specific meaning.
There is no known definition or context for pink people.
It is possible that the interviewer was testing your ability to handle unexpected or nonsensical questions.
You can politely ask for clarification or context if you are unsure how to answer.
Avoid making assumptions or giving a random answer without any basis.
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Jan 2020. There were 3 interview rounds.
MHr stands for Man-Hour. Costing is done by calculating the total number of man-hours required for a task and multiplying it by the cost per hour.
MHr stands for Man-Hour, which is a unit of measurement for the amount of work performed by an individual in one hour.
Costing is done by determining the total number of man-hours required for a specific task or project.
The cost per hour is then multiplied by the total number ...
I do not have the current pricing information for ADC 12 & plastic resins.
I apologize, but I do not have the current pricing information for ADC 12 & plastic resins.
I would need to conduct research or consult with a colleague who has access to this information.
Pricing for these materials can fluctuate frequently based on market demand and other factors.
Costing of plastic and casting parts involves analyzing material costs, production processes, and overhead expenses.
Analyze the material costs by considering the type and quantity of plastic or casting material required.
Evaluate the production processes involved in manufacturing the parts, including molding or casting techniques.
Consider the labor costs, machine costs, and energy costs associated with the production pr...
To determine the machine and tool cost for a plastic part.
Analyze the dimensions and material of the plastic part
Identify the required tolerances and surface finish
Consider the production volume and lead time
Research the available machines and their capabilities
Calculate the tooling cost based on the chosen machine
Consider the maintenance and operating costs of the machine
I applied via Referral and was interviewed in Oct 2018. There were 5 interview rounds.
I am drawn to your organisation's commitment to innovation and employee development. I expect opportunities for growth and a supportive work culture.
I am impressed by the company's track record of innovation and success in the industry.
I value the emphasis on employee development and growth opportunities within the organisation.
I am looking for a supportive work culture that values teamwork and collaboration.
I expect c...
I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
I faced a defect in plastic commodity related to poor quality control during the manufacturing process.
The defect was in the form of cracks and breakages in the plastic products.
It was caused by inadequate monitoring and supervision during the molding and cooling stages.
The defect resulted in a high number of rejected products and customer complaints.
To address the issue, we implemented stricter quality control measure...
I applied via Company Website and was interviewed in Aug 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Nov 2021. There were 3 interview rounds.
based on 7 reviews
Rating in categories
Assistant Manager
570
salaries
| ₹3.5 L/yr - ₹12 L/yr |
Engineer
278
salaries
| ₹2 L/yr - ₹8 L/yr |
Deputy Manager
274
salaries
| ₹6.6 L/yr - ₹15 L/yr |
Quality Engineer
159
salaries
| ₹1.5 L/yr - ₹6.5 L/yr |
Production Engineer
148
salaries
| ₹1.5 L/yr - ₹6.5 L/yr |
JBM Group
Subros
Ceat Tyres
UNO Minda