Bharat Aluminium Company (BALCO)
10+ Ethics Group Interview Questions and Answers
Q1. How you take online plc? Define communication protocol.
Online PLC can be taken through various methods. Communication protocol is a set of rules for data exchange between devices.
Online PLC can be taken through remote access software or web-based interfaces.
Communication protocol defines the format and rules for data exchange between devices.
Common communication protocols for PLCs include Modbus, Profibus, and Ethernet/IP.
These protocols specify how data is transmitted, addressed, and verified for error-free communication.
For exa...read more
Q2. What is the Elastic modulus of steel?
The elastic modulus of steel is a measure of its stiffness and ability to withstand deformation under stress.
The elastic modulus of steel is typically around 200 GPa (Gigapascals).
It is a material property that describes the ratio of stress to strain in a material.
Steel is known for its high elastic modulus, which allows it to resist bending and stretching.
The elastic modulus of steel can vary depending on factors such as alloy composition and heat treatment.
Knowing the elast...read more
Q3. Methods of performance management & which is the most suitable
Performance management methods include goal setting, feedback, performance reviews, and 360-degree feedback. The most suitable method depends on the organization's culture and goals.
Goal setting: Establishing clear and measurable objectives for employees to work towards.
Feedback: Providing regular feedback on performance to help employees improve.
Performance reviews: Formal evaluations of an employee's performance against set goals and expectations.
360-degree feedback: Gather...read more
Q4. How can Manage manpower?
Manpower can be managed by proper planning, delegation, communication, training, and motivation.
Plan ahead to determine manpower needs and allocate resources accordingly
Delegate tasks effectively based on individual strengths and skills
Maintain open communication channels to address any issues or concerns
Provide training and development opportunities to enhance skills and knowledge
Motivate employees through recognition, rewards, and a positive work environment
Q5. How find problems causes?
Identifying problem causes involves analyzing data, conducting tests, and using problem-solving techniques.
Analyze data to identify patterns or trends that may be causing the problem.
Conduct tests or experiments to isolate potential causes and confirm hypotheses.
Use problem-solving techniques such as root cause analysis or fishbone diagrams to systematically identify and address the underlying issues.
Consider factors such as design flaws, material defects, human error, or ext...read more
Q6. How you do maintenance of a ac motor.
Maintenance of an AC motor involves regular inspection, cleaning, lubrication, and replacement of worn-out parts.
Inspect the motor for any signs of wear and tear, such as frayed wires or damaged bearings.
Clean the motor regularly to prevent dust and debris from accumulating and causing damage.
Lubricate the motor's moving parts to reduce friction and extend its lifespan.
Replace any worn-out parts, such as belts or bearings, to prevent further damage to the motor.
Ensure that th...read more
Q7. Tel about boiler parts and process
Boiler parts include burner, combustion chamber, heat exchanger, controls, and safety devices. The process involves heating water to generate steam for various applications.
Boiler parts: burner, combustion chamber, heat exchanger, controls, safety devices
Process: heating water to generate steam
Applications: power generation, heating systems, industrial processes
Q8. What is civil engineering
Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure projects.
Involves designing and constructing buildings, bridges, roads, dams, and other structures
Focuses on ensuring structures are safe, functional, and sustainable
Requires knowledge of materials, construction techniques, and project management
Involves collaboration with architects, contractors, and government agencies
Examples include the construction of ...read more
Q9. method of aluminium extraction from ore
Aluminium is extracted from its ore bauxite by electrolysis.
Bauxite is first purified to produce alumina
Alumina is then dissolved in molten cryolite
Electrolysis is carried out using carbon electrodes
Aluminium is produced at the cathode and oxygen at the anode
Q10. RCC design grade of concrete
RCC design grade of concrete refers to the strength of the concrete mix used in reinforced concrete construction.
RCC design grade is denoted by a number followed by 'M' (e.g. M20, M30, etc.)
Higher grade concrete (e.g. M30) is used for structures requiring higher strength like bridges and high-rise buildings
Lower grade concrete (e.g. M20) is used for general construction purposes like residential buildings
Q11. Nigosiation of salary
Negotiating salary is a common practice during the hiring process to ensure fair compensation for your skills and experience.
Research industry standards and average salaries for your position to have a benchmark for negotiation.
Highlight your qualifications, experience, and unique skills that make you a valuable asset to the company.
Be prepared to discuss your salary expectations and be willing to negotiate within a reasonable range.
Consider other benefits or perks that may b...read more
Q12. What is marginal Costing
Marginal costing is a technique of cost accounting which deals with the ascertainment of marginal cost and its use in decision making.
It is a method of cost accounting that focuses on the variable costs of production.
It helps in determining the contribution margin of a product or service.
It is useful in making short-term decisions such as pricing, make or buy, etc.
It does not take into account fixed costs while calculating the cost of production.
It is also known as variable c...read more
Q13. Working culture of company
The working culture of the company is collaborative, innovative, and focused on continuous learning and development.
Encourages teamwork and open communication
Promotes creativity and thinking outside the box
Provides opportunities for training and growth
Values work-life balance
Recognizes and rewards employees for their contributions
Q14. Work planning of job
Work planning of job involves creating a detailed schedule and timeline for completing tasks and projects.
Identify project goals and objectives
Break down tasks into smaller components
Estimate time and resources needed for each task
Create a timeline with deadlines for each task
Assign responsibilities to team members
Regularly review and adjust the plan as needed
Q15. What about safety?
Safety is a top priority in all aspects of operations to ensure the well-being of employees and customers.
Implementing and enforcing safety protocols and procedures
Providing regular safety training for employees
Conducting safety inspections and audits
Promoting a safety culture among staff
Ensuring compliance with safety regulations and standards
Q16. What is slump test
Slump test is a method to measure the workability of concrete by determining the consistency and stiffness of the mix.
Slump test involves filling a cone-shaped mold with concrete, then removing the mold and measuring how much the concrete slumps or settles.
The amount of slump indicates the workability of the concrete mix - higher slump means more workable mix.
Slump test helps in ensuring that the concrete mix has the right consistency for proper placement and compaction.
It is...read more
Q17. What is slum test
Slum test is a method used to assess the quality of concrete by observing the flow of concrete through a standard slump cone.
Slump test is performed by filling a slump cone with freshly mixed concrete, then lifting the cone and measuring the amount of slump or settlement of the concrete.
The result of the slump test indicates the workability of the concrete mixture, with different slumps corresponding to different levels of workability.
A higher slump value indicates a more wor...read more
Q18. M30 grade concrete ratio
M30 grade concrete ratio is 1:1:2 (cement:sand:aggregate)
M30 grade concrete has a ratio of 1:1:2 for cement:sand:aggregate
This means for every part of cement, there is an equal part of sand and double the part of aggregate
For example, for 1 cubic meter of M30 concrete, you would need 1 part cement, 1 part sand, and 2 parts aggregate
Interview Process at Ethics Group
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month