Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There were 3 interview rounds.
Startup code sequence refers to the order in which code is executed when a program is launched.
Startup code sequence typically involves initializing variables, setting up memory, and executing any necessary setup functions.
Examples of startup code sequence include setting up hardware registers in embedded systems, initializing global variables in C programs, and loading configuration files in web applications.
Yes, I am willing to work on weekends if necessary to meet project deadlines or address urgent issues.
I understand that sometimes working on weekends may be required in order to meet project deadlines or address urgent issues.
I am committed to delivering high-quality work and am willing to put in extra hours when needed.
I am flexible with my schedule and can adjust my plans to accommodate weekend work if necessary.
I will address conflicts by promoting open communication, active listening, and facilitating constructive discussions.
Encourage open communication among team members to address conflicts early on
Practice active listening to understand all perspectives involved
Facilitate constructive discussions to find mutually beneficial solutions
Establish clear team norms and guidelines for conflict resolution
Seek input from team mem...
Seeking new challenges and opportunities for growth in a more innovative and dynamic environment.
Looking for new challenges and opportunities for growth
Interested in working in a more innovative and dynamic environment
Seeking career advancement and professional development
Seeking new challenges and opportunities for growth in a different environment.
Looking for new challenges and opportunities for growth
Interested in working with different technologies or industries
Seeking a better work-life balance or company culture
Wanting to expand skill set or take on more responsibilities
Relocation to a new area
posted on 17 Jan 2024
I was interviewed in Dec 2023.
Reasoning, enlish , appitude
I was interviewed in Mar 2023.
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There were 2 interview rounds.
A limit switch is a device that is used to detect the presence or absence of an object within a certain range of motion.
Limit switches are commonly used in industrial applications to control machinery and equipment.
They consist of an actuator that is mechanically linked to a set of contacts, which are opened or closed depending on the position of the actuator.
Limit switches can be used to stop the motion of a machine w...
Types of cooling used in dies include water cooling, air cooling, and oil cooling.
Water cooling: uses water to remove heat from the die
Air cooling: uses air to cool the die
Oil cooling: uses oil to dissipate heat from the die
Material and hrc of die parts are crucial for determining the durability and performance of the parts.
Material selection for die parts depends on factors like strength, wear resistance, and thermal conductivity.
Common materials used for die parts include tool steels like H13, D2, and A2.
Hardness of die parts is typically measured using Rockwell Hardness Scale (HRC).
Higher HRC values indicate greater hardness and wear r...
Breakdown in dies on machine can be due to wear and tear, misalignment, overheating, or material defects.
Wear and tear from continuous use can lead to cracks or breakage in the dies.
Misalignment of the dies can cause them to wear unevenly or break prematurely.
Overheating of the dies can weaken their structure and lead to failure during operation.
Material defects in the dies, such as impurities or weak spots, can cause ...
posted on 14 Dec 2024
I applied via Recruitment Consulltant and was interviewed before Dec 2023. There was 1 interview round.
posted on 11 Sep 2023
I applied via Naukri.com and was interviewed in Mar 2023. There were 4 interview rounds.
Basic aptitude questions
I applied via Approached by Company and was interviewed in Jul 2022. There were 3 interview rounds.
posted on 1 Dec 2022
Minimum resources should be utilized to achieve maximum output in production engineering.
Efficient use of resources is crucial for maximizing output
Optimizing processes and reducing waste can lead to increased productivity
Automation and technology can help streamline production and reduce resource usage
Continuous improvement and monitoring can identify areas for further optimization
Examples: Lean manufacturing, Six Sig
Quality Engineer
10
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Assistant Manager
4
salaries
| ₹4.6 L/yr - ₹6.5 L/yr |
Executive Accountant
4
salaries
| ₹1.7 L/yr - ₹4.5 L/yr |
Senior Executive Finance & Accounts
4
salaries
| ₹4.2 L/yr - ₹5.4 L/yr |
Purchase Coordinator
4
salaries
| ₹1 L/yr - ₹3 L/yr |
Caparo Engineering India
Marelli
Enco Engineers Combine
Seoyon E-hwa Automotive