I applied via Referral and was interviewed in Jul 2022. There was 1 interview round.
Yes, inventory cost includes GST.
Inventory cost includes the cost of goods as well as any taxes paid on those goods.
GST is a tax on goods and services, so it is included in the inventory cost.
The amount of GST included in the inventory cost depends on the rate of GST applicable to the goods.
For example, if the GST rate is 18%, and the cost of goods is Rs. 100, the inventory cost would be Rs. 118.
Top trending discussions
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
Projects lean knowledge problem solving
I applied via Naukri.com and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Walk-in
Cycle time is the time it takes to complete one cycle of a process. Lead time is the time it takes to fulfill a customer order. Downtime is the time when a machine or process is not operational. Upph stands for Units Per Production Hour.
Cycle time is the time it takes to complete one cycle of a process.
Lead time is the time it takes to fulfill a customer order.
Downtime is the time when a machine or process is not opera...
UPH is calculated by dividing the total number of units produced by the total number of hours worked.
Determine the total number of units produced
Determine the total number of hours worked
Divide the total number of units produced by the total number of hours worked
UPH = Total Units Produced / Total Hours Worked
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Sep 2020. There were 3 interview rounds.
UPPH stands for Units Per Person Hour, a measure of productivity in manufacturing.
UPPH is calculated by dividing the number of units produced by the number of workers and the number of hours worked.
It is commonly used in manufacturing industries to measure productivity and efficiency.
For example, if a factory produces 1000 units in 8 hours with 10 workers, the UPPH would be 12.5 (1000/8/10).
based on 9 reviews
Rating in categories
Project Engineer
1.5k
salaries
| ₹2.7 L/yr - ₹8 L/yr |
Engineer Trainee
730
salaries
| ₹1 L/yr - ₹5.6 L/yr |
Deputy Engineer
542
salaries
| ₹6 L/yr - ₹16 L/yr |
Graduate Apprentice Trainee
282
salaries
| ₹0.4 L/yr - ₹5.1 L/yr |
Contract Engineer
280
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Hindustan Aeronautics
Tata Power
Larsen & Toubro Limited
BHEL