Filter interviews by
I applied via Company Website and was interviewed before May 2022. There was 1 interview round.
The steps for making a house include planning, foundation, framing, electrical and plumbing, insulation, drywall, flooring, and finishing.
Plan the design and layout of the house
Lay the foundation and build the frame
Install electrical and plumbing systems
Add insulation and drywall
Install flooring and finish with paint or wallpaper
I applied via Walk-in and was interviewed before Jun 2021. There were 2 interview rounds.
Good and easy asked basic questions
Stress is the force applied to an object, while strain is the deformation or change in shape that occurs due to stress.
Stress is an external force applied to an object, while strain is the internal response of the object to that force.
Stress is measured in units of force per unit area, while strain is measured in units of length per unit length.
Stress can cause strain, but strain can also occur without stress if the ob...
I applied via Recruitment Consultant and was interviewed before Jul 2020. There was 1 interview round.
I appeared for an interview in Sep 2017.
A rectifier is an electrical device that converts alternating current (AC) to direct current (DC).
Rectifiers are commonly used in power supplies to convert AC voltage to DC voltage.
They are made up of diodes, which allow current to flow in only one direction.
Rectifiers can be half-wave or full-wave, depending on the type of diode configuration used.
Examples of rectifiers include bridge rectifiers, vacuum tube rectifier
Rectifier is a device that converts alternating current (AC) to direct current (DC) and can be half or full wave.
A rectifier is an electrical device that converts AC to DC.
A half-wave rectifier only allows one half of the AC waveform to pass through, resulting in pulsating DC.
A full-wave rectifier allows both halves of the AC waveform to pass through, resulting in smoother DC.
Rectifiers are commonly used in power suppl...
Bharat Electronics interview questions for designations
Top trending discussions
I applied via Campus Placement and was interviewed before Sep 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed in Dec 2023. There were 2 interview rounds.
About your self like study and your experience previous company
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
Check camera app, restart phone, clear cache, check for updates, check hardware.
Check if camera app is working properly
Restart the phone and try again
Clear cache of camera app
Check for software updates
Check if there is any physical damage to the camera
Check if the camera module is properly connected to the motherboard
FQC online is responsible for conducting quality checks during the manufacturing process.
FQC stands for Final Quality Control.
It involves checking the quality of products during the manufacturing process.
FQC online ensures that the products meet the required standards and specifications.
It helps in identifying and rectifying any defects or issues in the products before they are shipped to customers.
Examples of FQC onli...
I applied via Company Website and was interviewed in Jan 2024. There were 2 interview rounds.
Maintenance refers to the process of keeping equipment, machinery, or systems in good working condition. There are different types of maintenance depending on the approach and objectives.
Preventive maintenance involves regularly scheduled inspections, cleaning, and servicing to prevent breakdowns and extend the lifespan of equipment.
Corrective maintenance is performed after a failure or breakdown occurs, aiming to rest...
based on 5 interviews
Interview experience
based on 56 reviews
Rating in categories
Project Engineer
1.6k
salaries
| ₹2.7 L/yr - ₹8 L/yr |
Engineer Trainee
745
salaries
| ₹1 L/yr - ₹5.6 L/yr |
Deputy Engineer
465
salaries
| ₹6 L/yr - ₹16 L/yr |
Graduate Apprentice Trainee
274
salaries
| ₹0.4 L/yr - ₹5.1 L/yr |
Senior Engineer
264
salaries
| ₹9 L/yr - ₹19 L/yr |
Flex
Foxconn
ECIL
TE Connectivity