Filter interviews by
I applied via Walk-in and was interviewed in Mar 2020. There was 1 interview round.
Short selling, put options, and hedging are some strategies for a bear market run in derivatives.
Short selling involves selling borrowed securities in anticipation of a price decline.
Put options give the holder the right to sell an asset at a predetermined price, providing protection against market downturns.
Hedging involves taking offsetting positions to minimize potential losses.
Using derivatives like futures contrac...
I have managed assets for multiple fund houses including ABC Investments and XYZ Asset Management.
Managed assets for ABC Investments
Managed assets for XYZ Asset Management
Possess experience in managing assets for various other fund houses
TOPS stands for Total Portfolio Solution. It is a comprehensive investment management approach that aims to optimize portfolio performance.
TOPS is a strategy used by portfolio managers to maximize returns and minimize risks.
It involves diversifying investments across different asset classes, such as stocks, bonds, and commodities.
Portfolio managers use various techniques, including asset allocation and risk management,...
I appeared for an interview before Apr 2024, where I was asked the following questions.
Material grades determine the properties and suitability of materials for specific engineering applications.
Material grades indicate mechanical properties like strength, ductility, and hardness.
For example, steel grades like ASTM A36 are used for structural applications due to their strength.
Different grades can affect corrosion resistance; for instance, stainless steel grades like 304 and 316 are used in food processi...
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 2 interview rounds.
Approximately 6.2 bags of cement are used for 1 cubic meter of M:25 concrete.
M:25 concrete mix ratio is 1:1:2 (1 part cement, 1 part sand, 2 parts aggregate)
1 cubic meter of concrete requires 1440 kg of cement (density of cement = 1440 kg/m^3)
1 bag of cement typically weighs 50 kg
Therefore, 1440 kg / 50 kg = 28.8 bags of cement are needed for 1 cubic meter of concrete
Rounded off, approximately 6.2 bags of cement are us
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
Water cement ratio is a crucial factor in determining the strength and durability of concrete.
A lower water cement ratio results in a stronger and more durable concrete mix.
The water cement ratio is typically specified in concrete mix designs.
For example, a water cement ratio of 0.5 means that for every 1 kg of cement,
M:25 is the ratio of cement, sand, and aggregate in concrete mix. 1 cubic meter of M:25 concrete requires approximately 7 cement bags.
M:25 represents the ratio of cement:sand:aggregate in concrete mix
For 1 cubic meter of M:25 concrete, approximately 7 cement bags are required
The ratio M:25 means 1 part cement, 2.5 parts sand, and 3.5 parts aggregate
Balaji Associates interview questions for popular designations
I applied via Walk-in and was interviewed before Oct 2019. There was 1 interview round.
Proper protection measures must be taken when working with HT/LT lines and transformers.
Ensure proper grounding and earthing of the system
Use appropriate types of conductors for the specific application
Perform regular cable testing to ensure safety and reliability
Implement safety protocols and procedures for working with high voltage equipment
Use personal protective equipment (PPE) such as gloves, goggles, and insulate...
Top trending discussions
I applied via Referral and was interviewed before Apr 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
I applied via Referral and was interviewed before Mar 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There was 1 interview round.
Triggers are database objects that automatically execute in response to certain events or changes in data.
Triggers are used to enforce business rules or data integrity.
They can be used to audit changes to data.
Triggers can be set to execute before or after an event, such as an insert, update, or delete operation.
They can be defined on tables, views, or schemas.
Examples of triggers include sending an email notification ...
Some of the top questions asked at the Balaji Associates interview -
based on 5 interviews
Interview experience
based on 42 reviews
Rating in categories
Executive Accountant
9
salaries
| ₹1.7 L/yr - ₹3.6 L/yr |
Civil Engineer
7
salaries
| ₹2.5 L/yr - ₹5.4 L/yr |
Team Lead
5
salaries
| ₹2.2 L/yr - ₹2.5 L/yr |
Collections Executive
5
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Back Office Executive
5
salaries
| ₹1.5 L/yr - ₹3.5 L/yr |
TCS
Accenture
Wipro
Cognizant