I applied via Referral and was interviewed before Jan 2020. There were 3 interview rounds.
The standard MDD (Maximum Dry Density) of subgrade soil varies depending on the specific project requirements and soil characteristics.
The standard MDD of subgrade soil is determined through laboratory tests.
It is influenced by factors such as soil type, compaction method, moisture content, and compaction effort.
Different soil types have different standard MDD values.
For example, the standard MDD of a sandy soil may be...
TCS stands for Tata Consultancy Services.
TCS is an Indian multinational IT services and consulting company.
It is one of the largest IT service providers in the world.
TCS offers a wide range of services including software development, infrastructure management, and consulting.
The company has a strong presence in the highway engineering sector, providing technology solutions for transportation and infrastructure projects...
The quantity of soil in embankment or subgrade can be determined using the method of average end area.
The method of average end area involves taking cross-sectional measurements at regular intervals along the embankment or subgrade.
The cross-sectional measurements are used to calculate the area of each section.
The average area is then multiplied by the length of the embankment or subgrade to determine the volume of soi...
The test to determine FDD of soil is called the Falling Head Permeability Test.
Falling Head Permeability Test is used to determine the coefficient of permeability of soil.
It involves measuring the time taken for water to flow through a soil sample under a constant head.
The test is conducted using a permeameter, which consists of a cylindrical tube with a soil sample and a falling head of water.
The coefficient of permea...
IRC recommends 8-10 passes of vibro roller for full compaction.
IRC (Indian Road Congress) recommends 8-10 passes of vibro roller for full compaction.
The number of passes may vary depending on factors such as soil type, moisture content, and thickness of the layer.
In some cases, additional passes may be required to achieve the desired level of compaction.
It is important to conduct regular tests to ensure that the desire...
The question is asking about the number of passes of different types of vibro rollers for highway construction.
6 passes of vibro roller 1P
6 passes of vibro roller 1MV
6 passes of vibro roller 1V
6 passes of vibro roller 2P
Top trending discussions
posted on 16 Jan 2025
I applied via Recruitment Consulltant and was interviewed before Jan 2024. There was 1 interview round.
Construction process of Underground Metro Station involves excavation, tunneling, structural work, and finishing.
Excavation of the site to create space for the station and tunnels
Tunneling to create passages for trains and passengers
Structural work including building the station walls, platforms, and support structures
Installation of electrical, mechanical, and safety systems
Finishing touches such as flooring, lighting
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Apr 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
posted on 25 Mar 2023
I applied via Newspaper Ad and was interviewed in Feb 2023. There were 3 interview rounds.
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
I applied via Walk-in
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.
Check for leaks in the system
Inspect the compressor for damage or wear
Check the electrical connections and wiring
Monitor the pressure and temperature readings
Clean or replace air filters
Check the oil level and quality
Inspect the belts and pulleys for wear or damage
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
Civil Engineer
28
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Junior Engineer
17
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Accounts Officer
14
salaries
| ₹3.6 L/yr - ₹6 L/yr |
Mechanical Engineer
12
salaries
| ₹2.4 L/yr - ₹3.2 L/yr |
Junior Engineer Civil
10
salaries
| ₹2.4 L/yr - ₹3 L/yr |
The Louis Berger Group
Nesma & Partners
El Seif Engineering Contracting
Perkins