Filter interviews by
I appeared for an interview in Jan 2025.
I applied via Naukri.com and was interviewed in Jul 2024. There were 2 interview rounds.
It was easy and i was able to answer all the texhnical and managerial questions
I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Referral and was interviewed before Apr 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in May 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Feb 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Feb 2023. There were 3 interview rounds.
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM involves empowering operators to take ownership of equipment maintenance.
It focuses on preventing breakdowns and improving overall equipment efficiency.
TPM includes activities such as autonomous maintenance, planned maintenance, and continuous improvement.
Example: Implementing TPM in a manu...
I applied via Job Fair and was interviewed before Apr 2023. There were 3 interview rounds.
Why playing football in India
Loading method in Tezpur involves manual loading of goods onto trucks.
Manual loading of goods onto trucks is common in Tezpur.
Workers use hand carts or forklifts to load goods onto trucks.
Loading process may vary depending on the type of goods being transported.
Oil unloading in storage involves safely transferring oil from a delivery vehicle to storage tanks.
Ensure proper safety measures are in place during unloading process
Use appropriate equipment such as pumps and hoses for efficient transfer
Monitor the quantity and quality of oil being unloaded
Follow environmental regulations for handling and storage of oil
Train staff on proper procedures for oil unloading
I applied via Naukri.com and was interviewed in Dec 2022. There were 2 interview rounds.
Missing parts are stored separately for easy tracking and reordering.
Missing parts are kept in a designated area or bin.
Each missing part is labeled with a description and quantity.
The store manager regularly checks the missing parts inventory and orders replacements as needed.
Keeping track of missing parts helps to ensure customer satisfaction and prevent delays in repairs or assembly.
based on 1 interview
Interview experience
Accountant
14
salaries
| ₹2.8 L/yr - ₹4.2 L/yr |
QA Officer
9
salaries
| ₹2.2 L/yr - ₹4 L/yr |
QC Chemist
7
salaries
| ₹1.8 L/yr - ₹6.1 L/yr |
Accounts Officer
6
salaries
| ₹3.9 L/yr - ₹4.8 L/yr |
Production Chemist
6
salaries
| ₹2.1 L/yr - ₹3.5 L/yr |
Dabur
Himalaya Wellness
Patanjali Ayurved
Emami