Upload Button Icon Add office photos

Filter interviews by

Badri Rai Construction Senior Site Engineer Interview Questions, Process, and Tips

Updated 11 Oct 2022

Badri Rai Construction Senior Site Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(10 Questions)

  • Q1. What is development length
  • Ans. 

    Development length is the length of reinforcement required to transfer the stress from steel to concrete.

    • It is the minimum length of reinforcement bar required to be embedded in concrete to develop its full strength.

    • It is influenced by the diameter of the bar, the grade of the steel, and the strength of the concrete.

    • It is calculated based on the bond strength between steel and concrete.

    • For example, if the development l...

  • Answered by AI
  • Q2. Minimum thikness of RCC slab
  • Ans. 

    The minimum thickness of an RCC slab depends on various factors such as span, load, and deflection criteria.

    • The minimum thickness of an RCC slab is typically determined by structural engineers based on the span of the slab.

    • The thickness also depends on the load that the slab needs to support. Heavier loads require thicker slabs.

    • Deflection criteria, which refers to the amount of bending or sagging the slab can tolerate,...

  • Answered by AI
  • Q3. How many cement bags in one cubic metre
  • Ans. 

    The number of cement bags in one cubic metre depends on the density of the cement.

    • The density of cement varies between 1,200 to 1,800 kg/m³

    • The weight of one cement bag is usually 50 kg

    • Therefore, the number of cement bags in one cubic metre ranges from 55 to 83 bags

  • Answered by AI
  • Q4. Which dia baar is not provide ld
  • Q5. Density of aggregate.
  • Ans. 

    Density of aggregate is the mass per unit volume of the material.

    • Density is an important property of aggregates used in construction.

    • It is measured in kg/m³ or lb/ft³.

    • The density of different types of aggregates varies depending on their composition.

    • For example, the density of granite aggregate is around 2.7 g/cm³.

    • The density of lightweight aggregates like expanded clay or shale is around 1.5 g/cm³.

  • Answered by AI
  • Q6. Nominal size of concrete cube
  • Ans. 

    The nominal size of a concrete cube is 150 mm.

    • The nominal size of a concrete cube is the length of one side of the cube.

    • It is used to test the compressive strength of concrete.

    • The standard size of a concrete cube is 150 mm, but other sizes can also be used.

    • The cubes are made and cured under controlled conditions before testing.

  • Answered by AI
  • Q7. Weight of 16 mm dia steel in one metre
  • Ans. 

    Weight of 16 mm dia steel in one metre

    • The weight of 16 mm diameter steel rod per metre can be calculated by using the formula D^2/162

    • Here, D is the diameter of the steel rod in millimeters

    • So, the weight of 16 mm diameter steel rod per metre is (16^2)/162 = 1.580 kg/m

  • Answered by AI
  • Q8. Minimum dia of steel used in slab
  • Ans. 

    The minimum diameter of steel used in a slab depends on the span, load, and thickness of the slab.

    • The minimum diameter of steel bars used in a slab is usually 8mm.

    • However, for longer spans and heavier loads, larger diameter bars may be required.

    • The thickness of the slab also affects the minimum diameter of steel used.

    • For example, a 100mm thick slab may require 10mm diameter bars.

    • The minimum diameter of steel used in a

  • Answered by AI
  • Q9. Minimum dia of steel used in column
  • Ans. 

    The minimum diameter of steel used in a column depends on the load it needs to bear and the height of the column.

    • The minimum diameter of steel used in a column is typically 12mm.

    • However, it can vary depending on the load it needs to bear and the height of the column.

    • For taller columns, larger diameter steel bars may be required to ensure structural stability.

    • The diameter of steel used in a column should be specified in...

  • Answered by AI
  • Q10. What is the rasio of M15
  • Ans. 

    The ratio of M15 is 1:2:4 (cement:sand:aggregate) for concrete mix.

    • M15 is a mix of concrete with a compressive strength of 15 N/mm².

    • The ratio of M15 is commonly used for residential construction.

    • The ratio of M15 can be adjusted based on the specific requirements of the project.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My name is md Atique Quadir
I am a civil engineer
I am a hard & intelligent working in my company
I have average knowledge in building construction

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Family details age relationship
  • Q2. Parents Marital status
Round 2 - Group Discussion 

Experience interested work

Interview Preparation Tips

Interview preparation tips for other job seekers - Sincerety good communica
Tion skills
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Site supervisor
  • Q2. No ather cuntry, working form my country
Round 2 - Technical 

(2 Questions)

  • Q1. Work location , company room
  • Q2. No working refareniy
Round 3 - Technical 

(2 Questions)

  • Q1. Full safety work
  • Q2. No question
Round 4 - Technical 

(2 Questions)

  • Q1. No working chemical
  • Q2. Quality my work
Round 5 - Technical 

(2 Questions)

  • Q1. Proper material provided
  • Q2. No question

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes company public sujao
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Design of beam and column
  • Ans. 

    Designing beams and columns involves determining the size, material, and layout to support the required loads.

    • Consider the type of structure and the loads it will bear

    • Calculate the required dimensions and reinforcement based on structural analysis

    • Select appropriate materials such as steel or concrete

    • Ensure proper connections and detailing for stability and safety

  • Answered by AI
  • Q2. Condition of limit state of servicibility
  • Ans. 

    Limit state of serviceability refers to the condition where a structure is still functioning properly without any excessive deflection or deformation.

    • Limit state of serviceability ensures that a structure remains usable and safe for occupants.

    • It involves checking factors like deflection, vibration, cracking, and durability.

    • For example, a bridge should not deflect excessively under the weight of traffic to maintain serv...

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Hello what is your name
  • Q2. How much salary you want
Round 2 - HR 

(2 Questions)

  • Q1. Lets discuss about money
  • Q2. Where do you want to go
Round 3 - HR 

(2 Questions)

  • Q1. Where do you from
  • Q2. Are you interested to work

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

Site Engineer Interview Questions & Answers

AECOM user image Babalpreet singh

posted on 2 May 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. DAISCUSS ABOUT TECHNICAL ASPECTS OF CIVIL ENGINEERING AND SOFTWARE SKILLS
  • Q2. CODAL PROVISION OF CONCRETE AND COMMANDS OF SOFTWARE
  • Ans. 

    CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.

    • CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.

    • Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work enviourment is very fabulous
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Slump cone top diameter ?
  • Ans. 

    The top diameter of a slump cone is typically 4 inches.

    • The top diameter of a slump cone is usually 4 inches.

    • The slump cone is used to measure the consistency of fresh concrete.

    • The top diameter of the slump cone affects the flow of the concrete mix.

    • A larger top diameter will result in a higher slump value.

  • Answered by AI
  • Q2. Full from of TMT ?
  • Ans. 

    Thermo-Mechanically Treated

    • TMT stands for Thermo-Mechanically Treated

    • TMT bars are commonly used in construction for reinforcement

    • The process involves heating the steel bars and then rapidly cooling them to increase their strength

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Practical work related question, Civil engineering related question
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Assignment 

Metro project Ugrider casting

Round 3 - HR 

(8 Questions)

  • Q1. All documents well & online functions
  • Q2. Same as above and i ask for my all problems
  • Q3. Proper banck account provide &all documents, and prpoer work all apco group.
  • Q4. Same as above every person good look for job assignment
  • Q5. We work time to time proper give handover give to your partner,
  • Q6. Same as above. ..........
  • Q7. Same as above................. .....................
  • Q8. O ho..............what i se now ............... .......... .

Interview Preparation Tips

Topics to prepare for Apco Infratech Civil Site Supervisor interview:
  • 10th paas
Interview preparation tips for other job seekers - Sir my name peermohamad shaikh site supervisor in mumbai chembur &(I work on offshore Qatar ps4 plant)& Oman also.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Salary discussion and skills realted question.
  • Q2. 24/7 and rotate any across in india
  • Q3. Finally provided offer latter.

Interview Preparation Tips

Interview preparation tips for other job seekers - Site integration and fault management

Badri Rai Construction Interview FAQs

How many rounds are there in Badri Rai Construction Senior Site Engineer interview?
Badri Rai Construction interview process usually has 2 rounds. The most common rounds in the Badri Rai Construction interview process are Resume Shortlist and One-on-one Round.
What are the top questions asked in Badri Rai Construction Senior Site Engineer interview?

Some of the top questions asked at the Badri Rai Construction Senior Site Engineer interview -

  1. How many cement bags in one cubic me...read more
  2. Minimum dia of steel used in col...read more
  3. What is the rasio of ...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 406 Interviews
Tata Technologies Interview Questions
3.6
 • 252 Interviews
TCE Interview Questions
3.8
 • 242 Interviews
Saint-Gobain Interview Questions
4.0
 • 170 Interviews
View all

Fast track your campus placements

View all
Civil Site Engineer
6 salaries
unlock blur

₹3 L/yr - ₹3.6 L/yr

HSE Officer
4 salaries
unlock blur

₹2.5 L/yr - ₹4.4 L/yr

Senior Engineer
3 salaries
unlock blur

₹5.7 L/yr - ₹9.4 L/yr

Civil Engineer
3 salaries
unlock blur

₹3 L/yr - ₹4.2 L/yr

Billing Engineer
3 salaries
unlock blur

₹3 L/yr - ₹5.5 L/yr

Explore more salaries
Compare Badri Rai Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview