Filter interviews by
I applied via Referral and was interviewed in Dec 2021. There were 3 interview rounds.
IC and SI engines are types of internal combustion engines used in vehicles and machinery.
IC engine stands for internal combustion engine, which uses fuel combustion to generate power.
SI engine stands for spark ignition engine, which uses a spark plug to ignite the fuel-air mixture.
IC engines are commonly used in cars, trucks, and motorcycles.
SI engines are commonly used in gasoline-powered vehicles.
Both types of engin...
I applied via Referral and was interviewed in Dec 2021. There were 3 interview rounds.
IC engine is an internal combustion engine while CI engine is a compression ignition engine.
IC engine works on the principle of internal combustion of fuel while CI engine works on the principle of compression ignition of fuel.
IC engine is commonly used in cars, motorcycles, and small aircraft while CI engine is commonly used in heavy-duty vehicles like trucks and buses.
IC engine uses spark plugs to ignite the fuel whi...
Top trending discussions
posted on 18 Jul 2024
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.
To ensure successful delivery from project conception to execution, I would focus on clear communication, detailed planning, proactive problem-solving, and regular monitoring.
Establish clear project goals and objectives
Create a detailed project plan with timelines and milestones
Regularly communicate with stakeholders to ensure alignment and address any issues
Proactively identify and address potential risks and challeng...
I have over 5 years of technical experience in project management, construction, and engineering design.
Managed multiple construction projects from initiation to completion
Proficient in AutoCAD and other design software
Experience in creating project schedules and budgets
Knowledge of construction materials and methods
Collaborated with cross-functional teams to ensure project success
posted on 23 Sep 2024
I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.
Hydrostatic testing is a common method used to test the integrity of DI and HDPE pipes by pressurizing them with water.
Hydrostatic testing involves filling the pipe with water and pressurizing it to a specified level to check for leaks or weaknesses.
DI (Ductile Iron) pipes are typically tested at 1.5 times their working pressure, while HDPE (High-Density Polyethylene) pipes are tested at 1.25 times their working pressu...
posted on 8 Jul 2024
Pump head is calculated by adding the static head, friction head, and velocity head.
Calculate the static head by measuring the vertical distance between the pump centerline and the highest point of the system.
Calculate the friction head by considering the pipe length, diameter, roughness, and flow rate.
Calculate the velocity head by using the formula: V^2 / (2g), where V is the velocity of the fluid and g is the accele...
To operate the fire alarm system, follow these steps: activate the alarm, evacuate the building, and wait for emergency responders.
Activate the fire alarm by pulling the nearest alarm pull station or pressing the alarm button.
Evacuate the building immediately using the nearest exit and do not use elevators.
Wait for emergency responders to arrive and provide them with any relevant information about the situation.
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
The project involves managing the development of a new mobile application for a retail company.
Coordinating with the development team to ensure timely delivery of the app
Creating and managing project timelines and milestones
Collaborating with stakeholders to gather requirements and feedback
Monitoring and controlling project budget and resources
posted on 10 Jun 2024
posted on 8 Jun 2023
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
Project management process involves initiating, planning, executing, monitoring, and closing a project.
Initiating: Define project scope, objectives, and stakeholders.
Planning: Create a detailed project plan, schedule, and budget.
Executing: Implement the project plan and manage resources.
Monitoring: Track progress, identify issues, and make adjustments.
Closing: Finalize project deliverables and evaluate project success.
I have expertise in using various planning software such as Microsoft Project, Asana, and Trello to effectively manage projects.
Proficient in creating project plans, assigning tasks, and tracking progress using planning software
Skilled in resource allocation, budget management, and timeline scheduling within the software
Experience in generating reports, Gantt charts, and project timelines for stakeholders
Familiar with ...
I applied via Naukri.com and was interviewed in Aug 2022. There were 3 interview rounds.
based on 1 review
Rating in categories
Safety Officer
26
salaries
| ₹2 L/yr - ₹7 L/yr |
Mechanical Engineer
23
salaries
| ₹2.2 L/yr - ₹9 L/yr |
QA QC Engineer
12
salaries
| ₹2.2 L/yr - ₹5.5 L/yr |
Project Engineer
12
salaries
| ₹3.6 L/yr - ₹10 L/yr |
Project Engineer Mechanical
11
salaries
| ₹1.8 L/yr - ₹7 L/yr |
Larsen & Toubro Limited
Thermax Limited
BGR Energy Systems
Voltas