Upload Button Icon Add office photos

Filter interviews by

Ayana Renewable Power Assistant Manager F Interview Questions and Answers

Updated 9 Jun 2022

Ayana Renewable Power Assistant Manager F Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Experience years they asked
  • Q2. Salary expectation asked
Round 3 - Technical 

(3 Questions)

  • Q1. Accounts and Finance Related questions
  • Q2. Taxation Related questions
  • Q3. Family Background etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep yourself up to date so that you can succeed in every interview.....

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - One-on-one 

(7 Questions)

  • Q1. Barring checking and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and belt clamping take-up up and blumber block top cover open and slue Ba...
  • Ans. 

    Belt clamping take-up pulley up and blumber block top cover open and slue Barring remove and new slue Barring checking and replace and bolts nut tightening sure and top cover fixed and bolts nut tightening sure and belt clamping and tackup pulley down and paper work cancelled and conveyer belt running ok

  • Answered Anonymously
  • Q2. V-scraper replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and v-scraper remove and new v-scraper replace and bolts nut tigh...
  • Q3. Roller changed and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and fream number mark and Roller shift and Roller cut change and walked awa...
  • Q4. Motor replace work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and motor remove and new motor replace and bolts nut tightening sure and ...
  • Ans. 

    Old motor bolts nut open and new motor replace and bolts nut tightening sure and Dayal gauge eliminate process ok and paper work cancelled and conveyer belt running ok

  • Answered Anonymously
  • Q5. Gear box replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and gear box remove and new gear box replace and bolts nut tighten...
  • Ans. 

    Walked away clean and fresh and bolts nut open and old gear box remove and new gear box replace and bolts nut tightening sure and Dayal gauge eliminate process ok paper work cancelled and conveyer belt running ok

  • Answered Anonymously
  • Q6. Conveyer Barring checking and savings greasing work and safety first and all ppes sure and paper work and all pulley checking and savings Greasing sure and paper work cancelled and conveyer belt running o...
  • Q7. Fluid coupling oil replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolt nut open and old clean and fresh and new Oli Pur dropped and bolt...

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the opportunity for growth and advancement
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - HR 

(5 Questions)

  • Q1. Barring checking and replacement work and safety first and paper work and walked away clean and fresh and try out and blumber block top cover open and old slue barring remove and new slue barring fix and n...
  • Q2. V-scraper replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old v-scraper remove and new v-scraper replace and bolt nut tightening sure and ...
  • Q3. Discharge chute replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old discharge chute remove and new discharge chute replace and bolt nut ti...
  • Q4. Motor replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old motor remove and new motor replace and bolt nut tightening sure and dayal guage ...
  • Q5. Gear box replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old gear box replace and bolt nut tightening sure and dayal guage eliminate proce...

Interview Preparation Tips

Topics to prepare for Adani Group Assistant Manager interview:
  • Gear box replacement work
Interview preparation tips for other job seekers - Because of the growth of opportunity and advancement
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. About solar working
  • Q2. About cell vs module

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare with basic knowledge of solar
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. About the TATA POWER
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basic about your family
Round 3 - One-on-one 

(1 Question)

  • Q1. Knowledge related to Your Job
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About On Grid and off grid Solar operation functions
Round 3 - HR 

(1 Question)

  • Q1. Discussed about relocation and salary

Interview Preparation Tips

Interview preparation tips for other job seekers - I have worked in 4 years this company,
I like a company work cultures,
Here we can learn more about solar industries updates,
Work time is flexible.

I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Power plant engineering
  • Q2. Boiler pressure,steam line
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Wind turbines commissioning process and PLC software knowledge,wind turbines termination work
  • Q2. Converter test and DFIG working
  • Ans. 

    Converter test involves testing the performance and efficiency of a converter, while DFIG (Doubly Fed Induction Generator) is a type of generator used in wind turbines.

    • Converter test evaluates the performance of a power converter by analyzing its efficiency, power factor, and voltage regulation.

    • DFIG is a type of generator commonly used in wind turbines to convert mechanical energy into electrical energy.

    • Testing DFIG in...

  • Answered by AI
  • Q3. PLC and other wind software
  • Q4. Power cable termination
  • Q5. Grid charging process

Interview Preparation Tips

Interview preparation tips for other job seekers - You can apply on senvion official portal all details available in Google
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Why do you want to leave your present organisation.
  • Ans. 

    Seeking new challenges and growth opportunities in a different work environment.

    • Desire for professional growth and development

    • Seeking new challenges and opportunities

    • Looking for a change in work environment

    • Want to broaden skill set and experience

    • Seeking better work-life balance

  • Answered by AI

Ayana Renewable Power Interview FAQs

How many rounds are there in Ayana Renewable Power Assistant Manager F interview?
Ayana Renewable Power interview process usually has 3 rounds. The most common rounds in the Ayana Renewable Power interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in Ayana Renewable Power Assistant Manager F interview?

Some of the top questions asked at the Ayana Renewable Power Assistant Manager F interview -

  1. Accounts and Finance Related questi...read more
  2. Taxation Related questi...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

AmbitionBox Interview Questions
4.9
 • 153 Interviews
HCL Infosystems Interview Questions
3.9
 • 141 Interviews
Suzlon Group Interview Questions
4.1
 • 128 Interviews
Webdew Interview Questions
4.5
 • 106 Interviews
Data Entry Interview Questions
4.1
 • 96 Interviews
HyScaler Interview Questions
4.5
 • 90 Interviews
View all
Assistant Manager
33 salaries
unlock blur

₹8 L/yr - ₹18.5 L/yr

Deputy Manager
22 salaries
unlock blur

₹11 L/yr - ₹22 L/yr

Manager
14 salaries
unlock blur

₹10 L/yr - ₹30 L/yr

Senior Manager
14 salaries
unlock blur

₹20.7 L/yr - ₹37.5 L/yr

Senior Officer
10 salaries
unlock blur

₹3.5 L/yr - ₹7 L/yr

Explore more salaries
Compare Ayana Renewable Power with

Adani Green Energy

4.1
Compare

Azure Power

3.9
Compare

Greenko Group

3.8
Compare

ReNew

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview