Upload Button Icon Add office photos

Filter interviews by

Atos SAP PP Consultant Interview Questions and Answers

Updated 27 Apr 2022

Atos SAP PP Consultant Interview Experiences

1 interview found

SAP PP Consultant Interview Questions & Answers

user image VIVEK KUMAR SINGH

posted on 27 Apr 2022

I applied via Approached by Company and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Production process flow Master data Type of Bom Planning strategy MRP Run
Round 3 - HR 

(1 Question)

  • Q1. Shift CTC discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Business process you should very well

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. What is BOM usage
  • Q2. What are Group and group counter
  • Q3. What is item category in bom
  • Q4. What is document item
  • Q5. What is Document management system
  • Q6. What is MD05 and MD04

Interview Preparation Tips

Interview preparation tips for other job seekers - Do lean the concepts and view the screens on what are the fields provided in those fields
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic questions about PP related??
Round 2 - Technical 

(1 Question)

  • Q1. Question on implementation and interfaces??
Round 3 - HR 

(1 Question)

  • Q1. General discussions and documents sharing??

Interview Preparation Tips

Interview preparation tips for other job seekers - If you candidature is processed in Capgemini, don't wait for the offer letter. Instead of that look for new oppertunity.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Implementation Projects handled
  • Ans. 

    Handled multiple implementation projects in SAP PP

    • Managed end-to-end implementation of SAP PP module for a manufacturing company

    • Successfully implemented SAP PP for a pharmaceutical company, streamlining their production process

    • Handled customization and configuration of SAP PP module for a food processing company

    • Provided training and support to end-users during and after implementation

  • Answered by AI
  • Q2. Master Data & Applications

Interview Preparation Tips

Interview preparation tips for other job seekers - Fine & Good Interview .
Connected Online
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. PP production process flow Co product By product Difference In Bom how to create Bill of material of non stock items Important views of material master What is master data T code for demand management Prod...
  • Ans. 

    Questions related to SAP PP Consultant role including production process flow, BOM creation, material master views, demand management, production execution, and MRP run differences.

    • PP production process flow involves planning, execution, and monitoring of production processes.

    • Co-product and by-product are two types of secondary products produced during the main production process.

    • Non-stock items can be included in BOM ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear basic concepts
Practice on SAP server
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Company Website and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(29 Questions)

  • Q1. What should be considered during performance analysis with ST03 transaction, Total time or average time ?
  • Ans. 

    Average time should be considered during performance analysis with ST03 transaction.

    • Average time gives a more accurate representation of overall performance compared to total time.

    • Total time can be skewed by outliers or extreme values, while average time provides a more balanced view.

    • For example, if there are a few long-running processes that significantly impact total time, focusing on average time can help identify o

  • Answered by AI
  • Q2. How to minimize the downtime during an SAP upgrade with SUM?
  • Ans. 

    Minimize downtime during SAP upgrade with SUM by using parallel processing, proper planning, and testing.

    • Utilize parallel processing to speed up the upgrade process

    • Properly plan and schedule the upgrade during off-peak hours to minimize impact on users

    • Perform thorough testing in a non-production environment before the actual upgrade

    • Use SAP EarlyWatch Alert to identify potential issues before the upgrade

    • Implement SAP Sy...

  • Answered by AI
  • Q3. Where are R3trans and R3load processes are used during SAP upgrade using SUM?
  • Ans. 

    R3trans and R3load processes are used during SAP upgrade using SUM for data migration and transport.

    • R3trans is used for transporting data between systems during the upgrade process.

    • R3load is used for loading data into the upgraded system.

    • R3trans and R3load are part of the Software Update Manager (SUM) tool used for SAP upgrades.

  • Answered by AI
  • Q4. What are the differences in SUM 1.0 and SUM 2.0 ? Why can we not use SUM 2.0 for SAP JAVA systems ?
  • Ans. 

    SUM 2.0 is an updated version of SUM 1.0 with improved features. SUM 2.0 cannot be used for SAP JAVA systems due to compatibility issues.

    • SUM 2.0 has enhanced functionalities and better performance compared to SUM 1.0

    • SUM 2.0 is not compatible with SAP JAVA systems because it lacks support for certain Java-specific components and processes

    • Using SUM 2.0 for SAP JAVA systems can lead to errors and issues during the upgrade

  • Answered by AI
  • Q5. What steps are needed if the maintenance planner is not green?
  • Ans. 

    Check prerequisites, resolve issues, update software components, check system status, and re-run maintenance planner.

    • Check if all prerequisites are met before running maintenance planner

    • Resolve any issues or errors that are causing the maintenance planner to not be green

    • Update software components if necessary

    • Check the system status to ensure it is stable and running properly

    • Re-run the maintenance planner after addressi

  • Answered by AI
  • Q6. What are the difference in steps when you generate the stack.xml file from maintenance planner for Java system vs ABAP system.
  • Q7. What are delta Merge in SAP HANA?
  • Ans. 

    Delta Merge in SAP HANA is a process where data from delta storage is merged into main storage to optimize performance.

    • Delta merge is a process in SAP HANA where data from delta storage is merged into main storage to optimize performance.

    • It helps in reducing the size of delta storage and improving query performance.

    • Delta merge is triggered automatically by SAP HANA based on certain conditions like memory consumption or...

  • Answered by AI
  • Q8. What are the reasons of Delta merge not running properly and how to make them work?
  • Ans. 

    Delta merge may not run properly due to incorrect configuration, insufficient resources, or system errors.

    • Check the configuration settings for delta merge to ensure they are correct

    • Ensure that there are enough resources (memory, CPU, disk space) available for delta merge to run smoothly

    • Monitor system logs for any errors or issues that may be preventing delta merge from running properly

    • Restart the system or the relevant...

  • Answered by AI
  • Q9. What are the pre-requisites of manual delta merge?
  • Ans. 

    Pre-requisites for manual delta merge include proper system backup, sufficient disk space, and no active users.

    • Ensure system backup is taken before performing manual delta merge.

    • Make sure there is enough disk space available for the merge process.

    • Ensure there are no active users or critical processes running during the merge.

    • Check for any pending updates or patches that may interfere with the merge.

    • Verify that all nece...

  • Answered by AI
  • Q10. What is Strust transaction code? Why are there different PSEs and how are these utilized?
  • Ans. 

    Strust is a transaction code used in SAP for managing SSL server PSEs. Different PSEs are used for different purposes.

    • Strust is used to manage SSL server PSEs in SAP systems

    • Different PSEs are used for different purposes such as encryption, authentication, etc.

    • Examples of PSEs include SSL server PSE, SSL client PSE, SNC PSE, etc.

  • Answered by AI
  • Q11. What steps are needed if a 3rd party system wants to connect with your SAP system? What specific certificates will be needed?
  • Ans. 

    To connect a 3rd party system with SAP, steps include creating RFC destination, configuring communication user, setting up authorizations, and exchanging certificates.

    • Create RFC destination in SAP system

    • Configure communication user in SAP system

    • Set up necessary authorizations for the RFC user

    • Exchange certificates between the 3rd party system and SAP system

  • Answered by AI
  • Q12. What are trusted RFC connections and why are these needed and how to create those?
  • Ans. 

    Trusted RFC connections are secure connections between SAP systems for communication.

    • Trusted RFC connections are used to establish secure communication between SAP systems.

    • These connections are needed to ensure data integrity and confidentiality during data exchange.

    • To create trusted RFC connections, you need to configure the RFC destination in both sending and receiving systems.

    • You also need to maintain the trusted re...

  • Answered by AI
  • Q13. Is it possible to automate the TR movement from DEV to QA? If yes, how?
  • Ans. 

    Yes, it is possible to automate TR movement from DEV to QA.

    • Use transport management system (TMS) in SAP to automate TR movement

    • Set up transport routes and configure TMS to automatically release and import transports

    • Schedule background jobs to move transports at specific times

    • Use transport of copies (TOC) functionality to copy transports between systems

  • Answered by AI
  • Q14. What are label printers? How are these different than usual printers?
  • Ans. 

    Label printers are specialized printers used to print labels for various purposes.

    • Label printers are designed specifically for printing labels, tags, and stickers.

    • They are commonly used in industries like manufacturing, retail, logistics, and healthcare.

    • Label printers use different types of printing technologies such as direct thermal or thermal transfer.

    • Unlike usual printers, label printers are more durable and can ha...

  • Answered by AI
  • Q15. Spool request is successful but still the prints are not coming through, what could be the reason and how to solve it?
  • Q16. There is performance issue between 1 to 2 PM everyday, what could be the reason and how to resolve it?
  • Ans. 

    Possible reasons for performance issue between 1 to 2 PM everyday and how to resolve it

    • Check for any scheduled jobs or backups running during that time causing high system load

    • Monitor system resources like CPU, memory, and disk usage during that time

    • Review system logs for any errors or warnings occurring at that specific time

    • Consider implementing performance tuning measures such as optimizing database queries or increa...

  • Answered by AI
  • Q17. What are different tcodes for traces? What specific information you look for in these tcodes (e.g. STAD) ?
  • Ans. 

    Different tcodes for traces in SAP BASIS and specific information to look for in STAD

    • ST01 - System Trace: Monitor user activities and authorization checks

    • ST05 - Performance Trace: Analyze performance issues

    • ST11 - Display Developer Traces: View developer traces for debugging

    • ST12 - SAP System Trace Configuration: Configure trace settings

    • ST22 - ABAP Dump Analysis: Check for ABAP dumps and errors

  • Answered by AI
  • Q18. How does TMS work in SAP HANA? Similarly how it works in SAP JAVA and why it is used?
  • Ans. 

    TMS in SAP HANA manages transport requests for system changes, similar to SAP JAVA. It ensures controlled deployment of changes.

    • TMS in SAP HANA is used to manage transport requests for system changes, ensuring controlled deployment.

    • It allows for organizing changes into packages, moving them between systems, and tracking changes.

    • TMS in SAP JAVA also serves a similar purpose, managing transport requests for Java-based sy...

  • Answered by AI
  • Q19. What are domain link is SAP ?
  • Ans. 

    Domain link in SAP is a logical link between a domain and a data element.

    • Domain link is used to assign a domain to a data element in SAP.

    • It helps in defining the characteristics and constraints of the data element.

    • Domain link ensures consistency and reusability of domain definitions.

    • Example: Linking a domain 'Material Number' to a data element 'MATNR' in SAP.

  • Answered by AI
  • Q20. Can we add another transport layer between QA and Prod systems?
  • Ans. 

    Yes, it is possible to add another transport layer between QA and Prod systems.

    • Yes, you can add an additional transport layer between QA and Prod systems in SAP by creating a new transport route.

    • This can be achieved by configuring a new transport layer in the landscape configuration.

    • The new transport layer can be used to control the flow of transports between QA and Prod systems separately.

    • This setup allows for better ...

  • Answered by AI
  • Q21. What is the maximum memory a single HANA node can have?
  • Ans. 

    A single HANA node can have a maximum memory of 24 TB.

    • A single HANA node can have a maximum memory of 24 TB.

    • The memory capacity of a HANA node can vary depending on the hardware configuration.

    • For example, a HANA node with 2 TB RAM per socket can have up to 12 sockets, resulting in a total memory capacity of 24 TB.

  • Answered by AI
  • Q22. Can ECC on HANA have scaleout scenario?
  • Ans. 

    Yes, ECC on HANA can have scaleout scenario.

    • ECC on HANA can be scaled out by adding additional application servers to distribute workload.

    • Scaleout scenario helps in improving performance and handling increased workload.

    • It allows for horizontal scaling by adding more servers to the existing landscape.

    • Example: Adding more application servers to an ECC on HANA system to handle increased user load.

  • Answered by AI
  • Q23. What are the different strategies of SAP SUM?
  • Ans. 

    SAP Software Update Manager (SUM) offers various strategies for system updates and upgrades.

    • Downtime-minimized strategy: Reduces system downtime during updates by performing most of the activities online.

    • Standard strategy: Follows the traditional update process with downtime for the system.

    • Maintenance planner strategy: Uses SAP Maintenance Planner tool to plan updates and upgrades.

    • Stack XML strategy: Allows importing s...

  • Answered by AI
  • Q24. How does sizing of SAP and HANA work?
  • Ans. 

    Sizing of SAP and HANA involves determining the hardware requirements based on the workload and usage patterns.

    • Sizing involves analyzing the current and future workload of the SAP system.

    • Factors such as number of users, transactions, data volume, and growth projections are considered.

    • Tools like SAP Quick Sizer and SAP HANA Sizing reports are used to estimate hardware requirements.

    • Proper sizing ensures optimal performan

  • Answered by AI
  • Q25. How much memory is needed for a HANA system with 1TB of database?
  • Ans. 

    Approximately 1.5 TB of memory is needed for a HANA system with 1TB of database.

    • HANA systems typically require 1.5 times the size of the database in memory for optimal performance

    • In this case, with a 1TB database, approximately 1.5 TB of memory would be needed

    • Memory requirements may vary based on specific configurations and usage patterns

  • Answered by AI
  • Q26. What are the differences between HANA Cockpit and HANA studio?
  • Ans. 

    HANA Cockpit is a web-based tool for administration and monitoring, while HANA Studio is a desktop application for development and modeling.

    • HANA Cockpit is web-based, accessible via a browser, while HANA Studio is a desktop application.

    • HANA Cockpit is used for administration, monitoring, and performance tuning, while HANA Studio is used for development, modeling, and data provisioning.

    • HANA Cockpit provides a centralize...

  • Answered by AI
  • Q27. In SAP HANA, instead of creating one big file of 1 TB for backup, is it possible to created 10 files of 100 GB each ?
  • Ans. 

    Yes, in SAP HANA it is possible to create multiple files for backup instead of one big file.

    • Yes, in SAP HANA, you can split the backup into multiple files for easier management and storage.

    • This can be achieved by specifying the number of backup files and their sizes during the backup process.

    • For example, you can create 10 files of 100 GB each for a total backup size of 1 TB.

  • Answered by AI
  • Q28. What is the latest version of SAP HANA available on SAP Marketplace ?
  • Ans. 

    SAP HANA 2.0 SPS 05 is the latest version available on SAP Marketplace.

    • SAP HANA 2.0 SPS 05 was released in May 2020.

    • It includes new features and enhancements for improved performance and usability.

    • Customers can download the latest version from the SAP Marketplace.

  • Answered by AI
  • Q29. How do we install SAP HANA license for Tenant DB? What is sequence of applying the licenses in SAP HANA?
  • Ans. 

    To install SAP HANA license for Tenant DB, use HDBLCM tool and apply the licenses in a specific sequence.

    • Use HDBLCM tool to install SAP HANA license for Tenant DB

    • Apply the licenses in the following sequence: System DB, Tenant DB, and then XS Advanced

    • Ensure that the license key is valid and matches the hardware key of the system

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in Sep 2024. There were 4 interview rounds.

Round 1 - Aptitude Test 

It was easy aptitude round

Round 2 - Group Discussion 

The hiring team was good but one person from the team seemed to be little irritating

Round 3 - Technical 

(2 Questions)

  • Q1. They asked two aptitude questions
  • Q2. Rest resume based questions
Round 4 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    Experienced SAP Consultant with a background in implementing and optimizing SAP solutions for various industries.

    • Over 5 years of experience in SAP consulting

    • Specialize in implementing and optimizing SAP modules such as SAP S/4HANA, SAP ERP, and SAP BW

    • Worked with clients in industries including manufacturing, retail, and healthcare

    • Strong problem-solving and analytical skills

    • Certified in SAP modules

  • Answered by AI
  • Q2. What skill made you come this far
  • Ans. 

    My problem-solving skills have been crucial in my journey as an SAP Consultant.

    • Strong analytical skills to identify issues and find solutions

    • Ability to think critically and creatively to troubleshoot complex problems

    • Effective communication skills to collaborate with team members and clients

    • Attention to detail to ensure accuracy in implementing SAP solutions

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - good experience but they said they'll hire in bulk but they only hired 8 people
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What are ABAP REPORTS
  • Q2. What are idocs

SAP SD Consultant Interview Questions & Answers

UST user image AVIRUP CHAKRAVORTY

posted on 29 May 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. Topics on third-Party sales Process, Credit Management, Consigmenet Sales process, Output Deteremination, Accounting entries at PGI and Invoice
  • Q2. Explain Third Party Process
  • Ans. 

    Third Party Process involves selling products to customers through a third party vendor.

    • Involves a third party vendor who sells products on behalf of the company

    • The company does not directly deliver the products to the customer

    • The third party vendor may handle billing and shipping

    • Common in dropshipping business models

  • Answered by AI
  • Q3. Explain Output Deteremination
  • Ans. 

    Output determination in SAP SD is the process of determining the outputs (such as invoices, delivery notes, etc.) that are to be sent to customers based on certain conditions.

    • Output determination is configured in SAP using condition technique.

    • It involves defining output types, condition tables, access sequences, and output determination procedures.

    • Outputs are determined based on various criteria like sales document typ...

  • Answered by AI
  • Q4. Explain Pricing Deteremination and Anlaysis of error
  • Ans. 

    Pricing determination in SAP SD involves analyzing pricing conditions to calculate the final price for a sales document.

    • Pricing determination is the process of calculating the final price for a sales document based on various pricing conditions.

    • It involves analyzing pricing conditions such as discounts, surcharges, taxes, and freight charges to arrive at the final price.

    • Errors in pricing determination can occur due to ...

  • Answered by AI
Round 2 - Case Study 

What would u do to bring DHL onboard as LE customer

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Sap abap on Hana question
  • Q2. Questions on the implementation

Atos Interview FAQs

How many rounds are there in Atos SAP PP Consultant interview?
Atos interview process usually has 3 rounds. The most common rounds in the Atos interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in Atos SAP PP Consultant interview?

Some of the top questions asked at the Atos SAP PP Consultant interview -

  1. Production process flow Master data Type of Bom Planning strategy MRP ...read more
  2. Shift CTC discuss...read more

Tell us how to improve this page.

SAP PP Consultant Interview Questions from Similar Companies

View all
Associate Consultant
5.2k salaries
unlock blur

₹3 L/yr - ₹12.1 L/yr

Consultant
3.8k salaries
unlock blur

₹6.8 L/yr - ₹26.9 L/yr

Senior Consultant
1.9k salaries
unlock blur

₹10.8 L/yr - ₹34 L/yr

System Engineer
916 salaries
unlock blur

₹2 L/yr - ₹6.3 L/yr

Senior Associate
411 salaries
unlock blur

₹1.8 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Atos with

TCS

3.7
Compare

Infosys

3.7
Compare

Wipro

3.7
Compare

HCLTech

3.5
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview