Filter interviews by
I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
Answers to technical questions related to voltage, P.F, AVR, battery backup, and DG servicing cycle.
Earth to neutral voltage is the voltage between the earth and neutral points of an electrical system.
P.F of DG set refers to the power factor of a diesel generator set.
AVR stands for Automatic Voltage Regulator.
Battery cell voltage is the voltage produced by a single battery cell.
The Amp load outcome of a 4K rectifier mo...
Many questions in this round
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
I applied via Referral and was interviewed in Aug 2021. There were 4 interview rounds.
ATC India Tower Corporation interview questions for popular designations
Top trending discussions
RF stands for radio frequency, which is a type of electromagnetic wave used in various communication systems.
RF is used in wireless communication systems such as Wi-Fi, Bluetooth, and cell phones.
RF signals can be transmitted through antennas and can travel long distances.
RF spectrum is regulated by government agencies to prevent interference between different communication systems.
I applied via Campus Placement and was interviewed before Apr 2020. There was 1 interview round.
posted on 25 May 2022
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
I appeared for an interview before Feb 2021.
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
based on 2 interviews
Interview experience
based on 90 reviews
Rating in categories
Cluster Engineer
20
salaries
| ₹3 L/yr - ₹5.8 L/yr |
Senior Executive
19
salaries
| ₹5 L/yr - ₹8.1 L/yr |
Manager
10
salaries
| ₹13 L/yr - ₹23 L/yr |
Assistant Manager
10
salaries
| ₹7.3 L/yr - ₹11.3 L/yr |
Executive
7
salaries
| ₹4 L/yr - ₹5 L/yr |
Tata Communications Transformation Services
Tikona Infinet
HFCL Limited
Bharti Infratel