Upload Button Icon Add office photos

Filter interviews by

ASSA ABLOY Senior Assembly Engineer Interview Questions and Answers

Updated 14 Apr 2024

ASSA ABLOY Senior Assembly Engineer Interview Experiences

1 interview found

Interview experience
1
Bad
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself?
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions
Round 3 - Technical 

(1 Question)

  • Q1. Technical questions
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Written paper as per site and codes

Round 2 - Group Discussion 

It’s about Quality and execution with VP and audit team

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Joining procedures and company policy
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary

Interview Questionnaire 

2 Questions

  • Q1. What projects i had done in Bachelors?
  • Ans. 

    I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.

    • Designed a new bridge using CAD software

    • Researched and implemented renewable energy sources on campus

    • Collaborated with classmates on a group project to improve campus sustainability

  • Answered by AI
  • Q2. Where i did my 6 months internship?
  • Ans. 

    I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.

    • Internship at ABC Engineering Firm

    • Focused on project management and design

    • Hands-on experience gained

  • Answered by AI

Interview Preparation Tips

Round: Technical Interview
Experience: I was fresher, so they usually ask me about my university projects and my final training.
Tips: It will be good if you relate your projects with the company profile.

I applied via Referral and was interviewed in Jan 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Previous project breif and some technical from fire protection system and electrical.

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview it was good and the most important thing i was shared a true answer regarding previous project, i will very thankfull to mr.kunal sharma who has shared my resume to cushman.tx....
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Chiller efficiency
  • Ans. 

    Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.

    • Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.

    • Regular maintenance and cleaning of chiller components can improve efficiency.

    • Upgrading to a more energy-efficient chiller model can also increase efficiency.

    • Proper ...

  • Answered by AI
  • Q2. Which one more efficiently? Air cooled,or water cooled???
  • Ans. 

    Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.

    • Water has higher heat transfer capabilities compared to air

    • Water cooled systems can maintain more consistent temperatures

    • Water cooled systems are typically used in high performance applications such as data centers and industrial machinery

  • Answered by AI
  • Q3. How we improved duct velocity?
  • Ans. 

    Duct velocity can be improved by increasing the fan speed or reducing the duct size.

    • Increase the fan speed to increase the air velocity in the duct.

    • Reduce the duct size to increase the air velocity.

    • Use dampers or adjustable louvers to control and optimize the airflow.

    • Ensure proper sealing of duct joints to minimize air leakage.

    • Consider using smooth and straight ducts to reduce friction and improve airflow.

    • Regularly cle...

  • Answered by AI
  • Q4. What types of gas use chiller system?
  • Ans. 

    The chiller system uses various types of gases for cooling purposes.

    • Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.

    • R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.

    • R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.

    • Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.

    • Other ...

  • Answered by AI
  • Q5. How we decided the vrf system capacity as per area??
  • Ans. 

    The VRF system capacity is determined based on the area's cooling and heating load requirements.

    • Calculate the total cooling load and heating load for the area

    • Consider factors such as insulation, windows, occupancy, and equipment

    • Select VRF system capacity based on the calculated load requirements

    • Consult with HVAC professionals for accurate sizing

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical round is more important than other rounds so we should prepare that things very easily putting during interview and most important things candidates CV,whatever he mension his cv technically should be know very well' 🙏
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Types of tiles in construction
Round 2 - Group Discussion 

Waterproofing work & Gypsum work processing

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is the proportion of materials used in M25 grade concrete?
  • Ans. 

    The proportion of materials used in M25 grade concrete is 1:1:2 (cement:sand:aggregate).

    • M25 grade concrete consists of 1 part cement, 1 part sand, and 2 parts aggregate.

    • For example, if you have 1 kg of cement, you would need 1 kg of sand and 2 kg of aggregate to make M25 grade concrete.

  • Answered by AI
  • Q2. What is your past experience at your previous company?
  • Ans. 

    I have 2 years of experience working as a Junior Engineer at XYZ Company.

    • Worked on various engineering projects under the guidance of senior engineers

    • Assisted in designing and testing new products

    • Collaborated with cross-functional teams to troubleshoot and resolve technical issues

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please feel free to share the skills you have mastered and identify one area in which you believe you excel compared to others.

ASSA ABLOY Interview FAQs

How many rounds are there in ASSA ABLOY Senior Assembly Engineer interview?
ASSA ABLOY interview process usually has 2 rounds. The most common rounds in the ASSA ABLOY interview process are HR and Technical.

Tell us how to improve this page.

ASSA ABLOY Senior Assembly Engineer Interview Process

based on 1 interview

Interview experience

1
  
Bad
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 363 Interviews
CBRE Interview Questions
4.2
 • 270 Interviews
Colliers India Interview Questions
3.9
 • 70 Interviews
K Raheja Corp Interview Questions
4.3
 • 48 Interviews
Knight Frank Interview Questions
4.1
 • 44 Interviews
Sunteck Realty Interview Questions
3.3
 • 23 Interviews
Pittie Group Interview Questions
2.7
 • 17 Interviews
View all

ASSA ABLOY Senior Assembly Engineer Reviews and Ratings

based on 1 review

1.0/5

Rating in categories

1.0

Skill development

2.0

Work-life balance

2.0

Salary

1.0

Job security

1.0

Company culture

1.0

Promotions

1.0

Work satisfaction

Explore 1 Review and Rating
Area Sales Manager
51 salaries
unlock blur

₹8 L/yr - ₹15 L/yr

Area Development Manager
20 salaries
unlock blur

₹8.4 L/yr - ₹15 L/yr

Business Development Manager
20 salaries
unlock blur

₹9.1 L/yr - ₹21 L/yr

Area Sales Executive
20 salaries
unlock blur

₹3 L/yr - ₹10 L/yr

Sales Officer
13 salaries
unlock blur

₹4.5 L/yr - ₹8.2 L/yr

Explore more salaries
Compare ASSA ABLOY with

JLL

4.1
Compare

CBRE

4.2
Compare

Cushman & Wakefield

4.1
Compare

Colliers India

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview