Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Apr 2023. There were 2 interview rounds.
Top trending discussions
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
posted on 6 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
Written paper as per site and codes
It’s about Quality and execution with VP and audit team
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers (ACBs...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to sett...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.
Designed a new bridge using CAD software
Researched and implemented renewable energy sources on campus
Collaborated with classmates on a group project to improve campus sustainability
I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.
Internship at ABC Engineering Firm
Focused on project management and design
Hands-on experience gained
I applied via Referral and was interviewed in Jan 2020. There were 3 interview rounds.
The proportion of materials used in M25 grade concrete is 1:1:2 (cement:sand:aggregate).
M25 grade concrete consists of 1 part cement, 1 part sand, and 2 parts aggregate.
For example, if you have 1 kg of cement, you would need 1 kg of sand and 2 kg of aggregate to make M25 grade concrete.
I have 2 years of experience working as a Junior Engineer at XYZ Company.
Worked on various engineering projects under the guidance of senior engineers
Assisted in designing and testing new products
Collaborated with cross-functional teams to troubleshoot and resolve technical issues
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
Waterproofing work & Gypsum work processing
I applied via Campus Placement and was interviewed before Oct 2023. There was 1 interview round.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Area Sales Manager
55
salaries
| ₹7.1 L/yr - ₹15 L/yr |
Area Development Manager
20
salaries
| ₹8.4 L/yr - ₹15 L/yr |
Area Sales Executive
20
salaries
| ₹3 L/yr - ₹10 L/yr |
Business Development Manager
18
salaries
| ₹9.1 L/yr - ₹21 L/yr |
Sales Officer
13
salaries
| ₹4.5 L/yr - ₹8.2 L/yr |
JLL
CBRE
Cushman & Wakefield
Colliers India