Measurements for plastering work can be done in square feet or square meters.
Plastering work measurements can be done in square feet or square meters depending on the unit of measurement used in the project.
The area to be plastered is calculated by multiplying the length and width of the surface.
The thickness of the plaster is also taken into consideration when calculating the area.
The total area is then divided by the...
Top trending discussions
I applied via Approached by Company and was interviewed before Jul 2022. There were 4 interview rounds.
posted on 9 Oct 2021
I applied via Referral and was interviewed in Sep 2021. There were 4 interview rounds.
High rise buildings require careful planning, design, and construction techniques.
Site selection and analysis
Structural design and analysis
Foundation design and construction
Use of high-strength materials
Installation of elevators and other building systems
Safety measures for workers and occupants
Quality control and testing
Regular maintenance and inspections
based on 2 reviews
Rating in categories
Civil Site Engineer
10
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Site Engineer
8
salaries
| ₹3 L/yr - ₹3.8 L/yr |
General Manager Corporate
4
salaries
| ₹15 L/yr - ₹25 L/yr |
DGM Sales and Marketing
4
salaries
| ₹8 L/yr - ₹8 L/yr |
Customer Care Executive
4
salaries
| ₹1.4 L/yr - ₹3 L/yr |
DLF
Sobha
Prestige Group
Godrej Properties