Filter interviews by
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
I am familiar with CAD software such as SolidWorks and AutoCAD. I am also knowledgeable in GD&T and roll forming.
I have experience using SolidWorks and AutoCAD for designing and modeling parts and assemblies.
I am familiar with GD&T and its use in specifying tolerances and geometric features on engineering drawings.
UTS (Ultimate Tensile Strength) is the maximum stress a material can withstand before breaking, while Yiel...
Yes, I know MIG welding.
MIG welding stands for Metal Inert Gas welding.
It is a type of arc welding process that uses a consumable wire electrode.
The wire is fed through a welding gun and melts into the weld pool to form a joint.
MIG welding is commonly used in automotive and manufacturing industries.
I have experience in MIG welding and have used it in various projects.
Operation ratio is a measure of how efficiently a company uses its resources to generate revenue.
Operation ratio is calculated by dividing operating expenses by net sales.
A higher operation ratio indicates that a company is less efficient in using its resources.
For example, if a company has operating expenses of $100,000 and net sales of $500,000, the operation ratio would be 0.2 or 20%.
A low operation ratio is general...
I applied via Referral and was interviewed in Sep 2020. There was 1 interview round.
Armes Maini Storage Systems interview questions for popular designations
I applied via Recruitment Consultant and was interviewed in Apr 2020. There was 1 interview round.
Answering questions related to quality engineering including 5S, 7QC tools, QC vs QA, GD&T, ISO standards, and measurement tools.
5S is a methodology for workplace organization and standardization
7QC tools include Pareto charts, cause-and-effect diagrams, control charts, etc.
Sampling plan is a method for selecting a subset of items for inspection
QC focuses on detecting and correcting defects, while QA focuses on prevent...
Top trending discussions
posted on 23 Dec 2024
posted on 19 Jul 2024
Procurement to pay is the process of acquiring goods or services from external vendors and paying for them.
Procurement involves selecting vendors, negotiating contracts, and placing orders for goods or services.
Accounts Payable is responsible for processing invoices, verifying receipt of goods or services, and making payments to vendors.
The procurement to pay process helps ensure that goods or services are acquired in ...
System development lifecycle in P2P involves planning, analysis, design, implementation, testing, and maintenance.
Planning: Define requirements and objectives for the P2P system.
Analysis: Gather and analyze data to understand current processes and identify areas for improvement.
Design: Create a detailed plan for the P2P system, including workflows and user interfaces.
Implementation: Develop and deploy the P2P system ac...
Invoice processing is the workflow of receiving, reviewing, verifying, and paying invoices from vendors.
Receiving invoices from vendors
Reviewing invoices for accuracy and completeness
Verifying invoices against purchase orders or contracts
Obtaining approvals for payment
Recording invoices in the accounting system
Initiating payment to vendors
I applied via campus placement at Dr DY Patil Institute of Management, Pune and was interviewed in Nov 2024. There were 2 interview rounds.
It was google form based
10 people group and topic was AI in electronic and telecommunications
posted on 8 Apr 2024
Implemented a new CRM system for a multinational company
Led a team of developers to customize the CRM system based on client requirements
Conducted user training sessions to ensure smooth transition to the new system
Successfully integrated the CRM system with existing software applications
Delivered the project within the specified timeline and budget
Agile methodology is a project management approach that emphasizes flexibility, collaboration, and incremental progress.
Focuses on iterative development and frequent feedback
Encourages adaptive planning and responding to change
Promotes collaboration between cross-functional teams
Common frameworks include Scrum, Kanban, and Extreme Programming
Delivers working software in short, time-boxed iterations
I applied via Naukri.com and was interviewed in Oct 2023. There were 3 interview rounds.
based on 39 reviews
Rating in categories
Assistant Manager
12
salaries
| ₹6.9 L/yr - ₹8.4 L/yr |
Quality Engineer
12
salaries
| ₹2.4 L/yr - ₹4.9 L/yr |
Business Development Manager
8
salaries
| ₹15.3 L/yr - ₹17.2 L/yr |
Safety Officer
6
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Production Engineer
6
salaries
| ₹3.8 L/yr - ₹4.6 L/yr |
AXIS Solutions
Nirmal Industrial Controls
Comau
Polmon Instruments