Regarding the experience in which I have worked previously
Safety measures for working at height include fall protection equipment, proper training, regular inspections, and hazard identification.
Use fall protection equipment such as harnesses, lanyards, and safety nets.
Ensure workers are properly trained on working at height procedures and equipment usage.
Regularly inspect and maintain all equipment used for working at height.
Identify and eliminate or control hazards that may...
The mandatory PPEs to start work on a site include hard hats, safety glasses, high-visibility vests, steel-toed boots, and ear protection.
Hard hats are essential to protect the head from falling objects and potential head injuries.
Safety glasses protect the eyes from flying debris, chemicals, and other hazards.
High-visibility vests ensure workers are easily seen and identified on the site.
Steel-toed boots provide foot ...
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
There are various welding types and manufacturing processes used in construction and fabrication.
Common welding types include MIG, TIG, stick, and flux-cored welding
Manufacturing processes may involve cutting, bending, forming, and assembling metal components
Examples of manufacturing processes include laser cutting, CNC machining, and robotic welding
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
posted on 5 May 2023
I applied via Recruitment Consulltant and was interviewed before May 2022. There was 1 interview round.
I have extensive commercial experience related to client billing.
Managed client billing for a software company, ensuring timely and accurate invoicing
Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue
Collaborated with sales team to resolve billing discrepancies and improve client satisfaction
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.
Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.
It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.
The system allows for smooth finishes...
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Grade of concrete at site refers to the strength of the concrete mix used in construction.
Grade of concrete is specified by its compressive strength in megapascals (MPa) at 28 days.
Common grades of concrete include M20, M25, M30, etc.
Higher grade concrete indicates higher strength and durability.
The grade of concrete is determined by the mix design and testing of samples.
For example, M25 grade concrete has a compressiv
I applied via Walk-in and was interviewed in Apr 2021. There were 3 interview rounds.
M25 concrete is a type of concrete with a compressive strength of 25 megapascals (MPa).
M25 concrete is commonly used in construction projects.
It is a mix of cement, sand, and coarse aggregates in a specific ratio.
The ratio of cement to sand to coarse aggregates in M25 concrete is 1:1:2.
The compressive strength of M25 concrete is achieved after 28 days of curing.
M25 concrete is suitable for various applications such as
based on 4 interviews
Interview experience
based on 55 reviews
Rating in categories
Safety Officer
10
salaries
| ₹2.7 L/yr - ₹4.6 L/yr |
Engineer
7
salaries
| ₹3.2 L/yr - ₹4 L/yr |
Senior Engineer
7
salaries
| ₹3.6 L/yr - ₹7.9 L/yr |
Site Engineer
7
salaries
| ₹2.5 L/yr - ₹4.2 L/yr |
Site Incharge
5
salaries
| ₹2.4 L/yr - ₹4.6 L/yr |
Lea Associates South Asia
McNally Bharat Engineering
R.V.R. PROJECTS
ABCI Infrastructures