Design of pier involves considering various factors such as load capacity, soil conditions, water level, and environmental impact.
Determine the load capacity and type of pier required
Analyze soil conditions and water level to determine foundation type
Consider environmental impact and regulations
Design for durability and maintenance
Ensure safety measures are in place
Rigid pile caps are designed to transfer the load from the superstructure to the piles. The design should consider the pile arrangement, load distribution, and soil properties.
The pile cap should be designed to distribute the load evenly to the piles.
The pile arrangement should be considered to ensure that the pile cap is not overloaded.
The soil properties should be analyzed to determine the bearing capacity of the pil...
Prestressing losses occur during the transfer of prestress from the jacks to the concrete. These losses can be divided into two stages.
The first stage is immediate losses, which occur due to friction between the strands and the ducts, anchorage slip, and elastic shortening of the concrete.
The second stage is time-dependent losses, which occur due to creep and shrinkage of the concrete, relaxation of the steel, and temp...
Design of steel members and connections involves determining the appropriate size and shape of steel components and how they are connected.
Consider the loads and stresses that the steel members will be subjected to
Select appropriate steel sections based on their strength and stiffness
Design connections that can transfer loads between members without failure
Ensure that the design complies with relevant codes and standar...
Pre-tension is applied before concrete is poured, while post-tension is applied after concrete has hardened.
Pre-tension involves stretching steel cables or bars before pouring concrete to create tension in the concrete as it sets.
Post-tension involves inserting steel cables or bars into hardened concrete and then tensioning them to create compression in the concrete.
Pre-tension is typically used in precast concrete ele...
Analysis and design of piles involves determining the load capacity and selecting the appropriate type of pile for a given soil condition.
Pile load capacity is determined through various methods such as static load tests, dynamic load tests, and pile integrity tests.
Factors such as soil type, groundwater level, and seismic activity must be considered when selecting the type of pile.
Common types of piles include driven ...
Top trending discussions
posted on 8 Oct 2022
I was interviewed before Oct 2021.
I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.
I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.
posted on 17 Aug 2023
I applied via AmbitionBox and was interviewed before Aug 2022. There were 2 interview rounds.
It is very difficult test to pass
Environmental Impact Assessment (EIA) is a process to identify, predict, evaluate, and mitigate the environmental effects of a proposed project.
EIA is a systematic process that helps in decision-making by evaluating the potential impacts of a project on the environment.
It involves identifying potential environmental impacts, assessing their significance, and proposing measures to mitigate or eliminate them.
EIA consider...
Smart motorways help improve traffic flow, increase capacity, and enhance safety on highways.
Smart motorways use technology to monitor traffic flow and adjust speed limits to optimize traffic flow.
They can convert the hard shoulder into a running lane during peak traffic times to increase capacity.
Emergency refuge areas are strategically placed for drivers to use in case of breakdowns or emergencies, enhancing safety.
V...
Different types of crossing include level crossings, pedestrian crossings, and wildlife crossings.
Level crossings: where a railway line crosses a road at the same level, requiring barriers and warning signals for safety.
Pedestrian crossings: designated areas for pedestrians to safely cross roads, such as zebra crossings, pelican crossings, and pedestrian bridges.
Wildlife crossings: structures built over or under roads ...
I applied via LinkedIn and was interviewed before Aug 2023. There was 1 interview round.
Seeking new challenges and opportunities for growth in my career.
Looking to expand my skill set and knowledge in a new environment
Interested in working on different projects and gaining diverse experience
Seeking a more collaborative and innovative work culture
Want to take on more responsibilities and advance my career
I applied via Naukri.com and was interviewed in Mar 2022. There were 3 interview rounds.
based on 8 reviews
Rating in categories
BIM Modeller
120
salaries
| ₹0 L/yr - ₹0 L/yr |
Consultant
69
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
63
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Graduate Engineer
45
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Jacobs Engineering Group
WSP
Stantec