Upload Button Icon Add office photos

Arabtec Construction

Compare button icon Compare button icon Compare

Filter interviews by

Arabtec Construction Site Supervisor Interview Questions, Process, and Tips for Experienced

Updated 8 Feb 2022

Arabtec Construction Site Supervisor Interview Experiences for Experienced

1 interview found

Site Supervisor Interview Questions & Answers

user image Rahamat Ali Ansari

posted on 8 Feb 2022

I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips
Round 2 - Aptitude Test 

Behavior

Round 3 - Technical 

(10 Questions)

  • Q1. Show drawings ànd asked questions where is the tìtal writen
  • Q2. Ofþer plaster what's we have to check
  • Ans. Check surface fòr cracks plumb smoothness debounding
  • Answered by Rahamat Ali Ansari
  • Q3. What is the weightof 25 mmdia steel bar of 4 mts
  • Ans. 

    The weight of a 25mm diameter steel bar of 4 meters length.

    • To calculate the weight, we need to know the density of the steel.

    • The density of steel is typically around 7850 kg/m^3.

    • Using the formula weight = volume * density, we can calculate the weight of the steel bar.

    • The volume of a cylindrical bar can be calculated using the formula volume = π * (diameter/2)^2 * length.

    • Substituting the values, we can calculate the wei

  • Answered by AI
  • Q4. How will you check the right angle of walls corner
  • Ans. 

    To check the right angle of walls corner, use a carpenter's square or a digital angle finder.

    • Use a carpenter's square by placing it against the corner of the wall and checking if the edges align perfectly.

    • Alternatively, use a digital angle finder to measure the angle between the two walls and ensure it is 90 degrees.

    • Ensure the walls are straight and plumb before checking the corner angle.

  • Answered by AI
  • Q5. What's the size of ful play
  • Ans. 

    The size of a full play can vary depending on the specific production and script.

    • The size of a full play can range from small-scale productions with a few actors to large-scale productions with a large cast and elaborate sets.

    • Some plays may require a small ensemble cast, while others may have a large ensemble cast.

    • The size of a play can also be influenced by the number of scenes, locations, and set changes.

    • For example,...

  • Answered by AI
  • Q6. What' do you know about Safety
  • Ans. 

    Safety refers to the measures and precautions taken to prevent accidents, injuries, and hazards in the workplace.

    • Safety involves identifying and assessing potential risks and hazards in the workplace.

    • It includes implementing safety protocols, procedures, and guidelines to minimize or eliminate risks.

    • Safety also involves providing appropriate safety equipment and training to employees.

    • Regular inspections and audits are ...

  • Answered by AI
  • Q7. What is meaning scale 1;30
  • Ans. 

    Scale 1:30 refers to a ratio where 1 unit on the scale represents 30 units in real life.

    • Scale 1:30 is commonly used in architectural and engineering drawings.

    • It means that every measurement on the drawing is 30 times smaller than the actual size.

    • For example, if a wall is represented as 10 cm on the drawing, its actual size would be 300 cm (10 cm x 30).

  • Answered by AI
  • Q8. What will you fix at the iointof rcc walls and blocks walls
  • Ans. 

    In order to fix the joints of RCC walls and block walls, various methods can be used such as grouting, sealing, and reinforcement.

    • Grouting is the process of filling the joints with a cementitious material to provide strength and stability.

    • Sealing the joints with appropriate sealants helps in preventing water leakage and enhancing the durability of the walls.

    • Reinforcing the joints with steel bars or mesh can improve the...

  • Answered by AI
  • Q9. How much plaster can be don by 1 mason 1 Labour
  • Ans. 

    The amount of plaster that can be done by 1 mason and 1 labor depends on various factors.

    • The skill and experience of the mason and labor

    • The size and complexity of the area to be plastered

    • The type of plaster being used

    • The tools and equipment available

    • The time allocated for the task

    • The working conditions and environment

    • The efficiency and coordination between the mason and labor

    • On average, a skilled mason and labor can pl

  • Answered by AI
  • Q10. Before starting block work what tipe of preparation we have to do
  • Ans. 

    Before starting block work, preparation involves site survey, layout marking, excavation, and foundation preparation.

    • Conduct a site survey to assess the ground conditions and identify any potential obstacles or hazards.

    • Mark the layout of the block work using strings, stakes, and levels to ensure accurate positioning.

    • Excavate the area where the block work will be installed, removing any existing debris or vegetation.

    • Pre...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Arabtec Construction Site Supervisor interview:
  • Team Management
Interview preparation tips for other job seekers - All management would be honest and think about company groth

Interview questions from similar companies

I applied via Referral and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. What is JHA?
  • Ans. 

    JHA stands for Job Hazard Analysis. It is a process of identifying potential hazards in a job or task and implementing measures to control or eliminate them.

    • JHA is a systematic approach to identify and evaluate potential hazards in a job or task.

    • It involves breaking down a job into steps and analyzing each step for potential hazards.

    • The goal of JHA is to identify hazards and implement measures to control or eliminate t...

  • Answered by AI
  • Q2. What is WMS?
  • Ans. 

    WMS stands for Warehouse Management System.

    • WMS is a software application that helps manage warehouse operations.

    • It includes inventory management, order fulfillment, and shipping.

    • WMS can improve efficiency, accuracy, and productivity in a warehouse.

    • Examples of WMS include SAP EWM, Oracle WMS, and Manhattan Associates WMoS.

  • Answered by AI
  • Q3. What is PTW?
  • Ans. 

    PTW stands for Permit to Work. It is a formal written system used to control high-risk activities.

    • PTW is a safety management system used to ensure that high-risk activities are carried out safely.

    • It involves obtaining a written permit before starting any high-risk activity.

    • The permit outlines the hazards associated with the activity and the precautions that need to be taken.

    • PTW is commonly used in industries such as co...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview is some hard .

Skills evaluated in this interview

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. What is safety?.
  • Ans. 

    Safety is the state of being protected from harm, danger, or injury.

    • Safety involves identifying and assessing potential hazards

    • Implementing measures to control or eliminate those hazards

    • Providing training and education to prevent accidents

    • Maintaining equipment and facilities to ensure they are safe to use

    • Encouraging a culture of safety in the workplace

    • Examples include wearing personal protective equipment, following sa...

  • Answered by AI
  • Q2. What's safety officer duties?.
  • Ans. 

    Safety officer duties include ensuring compliance with safety regulations, identifying and mitigating hazards, and promoting a culture of safety.

    • Develop and implement safety policies and procedures

    • Conduct safety inspections and audits

    • Investigate accidents and incidents

    • Provide safety training to employees

    • Maintain safety records and reports

    • Collaborate with management and employees to promote safety culture

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't panic during interview time.

Interview Questionnaire 

1 Question

  • Q1. How to provide fall arresting system in high rise storry
  • Ans. 

    Fall arresting system in high rise story can be provided through various means.

    • Use of safety nets

    • Installation of guardrails

    • Use of personal fall arrest systems

    • Proper training and education of workers

    • Regular inspection and maintenance of equipment

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Explain hydrojetting safety
  • Ans. 

    Hydrojetting safety involves following proper procedures and using appropriate protective equipment to prevent accidents and injuries.

    • Ensure all personnel involved in hydrojetting are trained on safety protocols

    • Wear appropriate personal protective equipment (PPE) such as gloves, goggles, and protective clothing

    • Inspect and maintain hydrojetting equipment regularly to ensure safe operation

    • Follow proper lockout/tagout pro...

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. Explain about yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Choose right company like descon
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed before Jan 2022. There were 7 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Hard work,.road line..pipe line.. others
  • Q2. Hard work.. road line..pipe line..others
  • Q3. Hard work..road line
Round 2 - Assignment 

Hard work and pipeline roadlines work...

Round 3 - Civil foreman 

(4 Questions)

  • Q1. Hard work..road line pipe line
  • Ans. 

    All machine.(bom loader.jcb.oather) old pipe line area.. new pipe line coverage

  • Answered by Satanam Singh
  • Q2. Hard work..road line pipe line work
  • Q3. Hard work..road line pipe line work ...
  • Q4. Hard work pipe line work
Round 4 - Assignment 

Hard work and pipeline roadlines work..

Round 5 - Technical 

(15 Questions)

  • Q1. Hard work and pipeline roadlines
  • Q2. Hard work and pipeline ..roadlines
  • Q3. Hard work and pipeline roadlines work.
  • Q4. Hard work and pipeline roadlines work..
  • Q5. JCB work road line pipe..
  • Q6. Hard work and pipeline ..roadlines work..
  • Q7. Hard work.. pipe line work..
  • Q8. Hard work and pipeline roadlines ok
  • Q9. Civil foreman complete documents and..
  • Q10. Hard work and JCB work road line pipe line..
  • Q11. Road line pipe line.
  • Q12. Hard work pipe line pipe line
  • Q13. Hard work pipe line..
  • Q14. Hard work road line..
  • Q15. JCB work road line..
Round 6 - Coding Test 

Hard work and pipeline roadlines work..

Round 7 - Coding Test 

Hard work and pipeline roadlines

Interview Preparation Tips

Topics to prepare for Archirodon Civil Foreman interview:
  • Civil foreman
  • Graduate
Interview preparation tips for other job seekers - Civil foreman complete documents and please let me
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Procedure of laying tile and granite
  • Ans. 

    The procedure of laying tile and granite involves preparing the surface, applying adhesive, laying the tiles/granite, grouting, and sealing.

    • Prepare the surface by ensuring it is clean, level, and dry.

    • Apply adhesive to the surface using a trowel, ensuring even coverage.

    • Lay the tiles/granite starting from the center and working outwards in a pattern.

    • Grout the tiles/granite by filling the gaps between them with grout and ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Safety related question work at height. Lifting Plan
  • Q2. Log out Tag out related question

Interview Preparation Tips

Interview preparation tips for other job seekers - i share my openion my interview question I advise my experience before interview to prepare and confidence.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There were 2 interview rounds.

Round 1 - Assignment 

Objective types questions

Round 2 - One-on-one 

(2 Questions)

  • Q1. Safety management
  • Q2. Safety workplace

I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

H2s, confined space hazard and precaution, what's different b/w pre commissioning & commissioning, PSV, SWL, STEL, What's is ur pervious experience eg. Flare erection, tank erection, pre commissioning & commissioning, 11kv crude substation.

Interview Preparation Tips

Topics to prepare for Nasser S. Al Hajri Corporation Safety Officer interview:
  • Nebosh igc
Interview preparation tips for other job seekers - Be prepare don't think i know some accurate questions they will ask, don't over confident best of luck.

Arabtec Construction Interview FAQs

How many rounds are there in Arabtec Construction Site Supervisor interview for experienced candidates?
Arabtec Construction interview process for experienced candidates usually has 3 rounds. The most common rounds in the Arabtec Construction interview process for experienced candidates are Group Discussion, Aptitude Test and Technical.
What are the top questions asked in Arabtec Construction Site Supervisor interview for experienced candidates?

Some of the top questions asked at the Arabtec Construction Site Supervisor interview for experienced candidates -

  1. Before starting block work what tipe of preparation we have to...read more
  2. What will you fix at the iointof rcc walls and blocks wa...read more
  3. What is the weightof 25 mmdia steel bar of 4 ...read more

Tell us how to improve this page.

Arabtec Construction Site Supervisor Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

5.0

Skill development

3.0

Work-life balance

5.0

Salary

4.0

Job security

5.0

Company culture

2.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Time Keeper
11 salaries
unlock blur

₹2.7 L/yr - ₹4.8 L/yr

Store Keeper
7 salaries
unlock blur

₹1.8 L/yr - ₹6.5 L/yr

Project Engineer
6 salaries
unlock blur

₹11.6 L/yr - ₹27.8 L/yr

Site Engineer
6 salaries
unlock blur

₹3 L/yr - ₹6.5 L/yr

Safety Officer
6 salaries
unlock blur

₹1.4 L/yr - ₹9.6 L/yr

Explore more salaries
Compare Arabtec Construction with

Nasser S. Al Hajri Corporation

3.6
Compare

Saudi Binladin Group

4.1
Compare

Leighton Contractors

4.2
Compare

Eversendai

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview